Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
500
1000
1050
1100
1150
1200
1250
1300
1330
1340
1350
1360
1370
1380
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1410
1420
1430
1440
1450
1460
1500
1550
1600
1620
| Product Name | Notes |
|---|---|
| 1981 Proceedings-Refining Department | |
| A GUIDE TO LCC ANALYSIS FOR PUMPING SYSTEMS | |
| AASHTO Provisional Standards | |
| ADAPTER, PARACHUTE HARNESS ADJUSTING STRAP | |
| Adapter, Parachute Harness Reversible Quick-Fit | |
| ADAPTER, PARACHUTE HARNESS, QUICK FIT | |
| Adapter, Parachute Harness, Reversible Quick-Fit | |
| Adjacent Storage of Compressed Hydrogen and Other Flammable Gases | |
| ADJUSTER ASSEMPLY, SAFETY SHOULDER HARNESS BELT | |
| ADJUSTER, LAP, AIRCRAFT SAFETY BELT | |
| Aerospace series - Acceptance of supplier\x92s design capabilities and management of Design Organisation authorisations | |
| Aerospace series - Assessment of Design Suppliers Managing and Approving Repairs | |
| Aerospace series - Flammability Test Organisations Qualification Standard | |
| Aerospace series - General Principles of Obsolescence Management of chemicals, materials and processes | |
| Aerospace series - LOTAR - LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data - Part 120: CAD 3D explicit geometry with... | |
| Aerospace series - LOTAR - LOng Term Archiving and Retrieval of digital technical product documentation such as 3D CAD and PDM data - Part 121: Semantic representation of CAD 3D... | |
| Aerospace series - LOTAR - Part 125: Explicit CAD assembly structure with Graphic Product and Manufacturing Information (PMI) | |
| Aerospace Series - Quality Management Systems - Statistical Product Acceptance Requirements | |
| Aerospace series - Requirements for Advanced Product Quality Planning and Production Part Approval Process | |
| Aerospace series - Surveillance of Aerospace Design Suppliers | |
| Aerospace series \x97 General recommendation for the BIT Architecture in an integrated system | |
| Aerospace series \x97 LOTAR \x97 LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data \x97 Part 210: Product Management Data in an... | |
| Aerospace series \x97 Management of unsalvageable items | |
| Aerospace series \x97 Programme management \x97 Expression of need \x97 Guidance on and format for (Need) Technical Specification | |
| Aerospace series \x97 Quality management systems \x97 Part 3: Requirements for Aviation, Space, and Defence Auditor Training, Development, Competence, and Authentication | |
| Aerospace series Architecture for integrated management of a system's health condition | |
| Aerospace series Certificate of Conformity Requirements | |
| Aerospace series Delegated Product Release Verification | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 001: Structure | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 002: Requirements | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 003: Fundamentals and concepts | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 004: Description Methods | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 005: Authentication and Verification | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 007: Terms and References | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 010: Overview Data Flow | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 011: Reference process description "Data preparation" | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 012: Reference process description ''Ingest'' | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 013: Reference process description ''Archival Storage'' | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 014: Reference process description ''Retrieval'' | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 015: Reference process description ''Removal'' | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 100: Common concepts for Long term archiving and retrieval... | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 110: CAD mechanical 3D Explicit geometry information | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 115: Explicit CAD assembly structure | |
| Aerospace series LOTAR LOng Term Archiving and Retrieval of digital technical product documentation such as 3D, CAD and PDM data Part 200: Common Concepts for LOng Term Archiving and Retrieval... | |
| Aerospace series Notice of Change (NOC) Requirements | |
| Aerospace Series Operator Self-Verification Programs | |
| Aerospace series Programme management \x97 Guide for establishing and implementing a development plan | |
| Aerospace series Programme management \x97 Guide for reliability control | |
| Aerospace series Programme management \x97 Guide to dependability and safety control | |
| Aerospace series Programme management \x97 Recommendations for the implementation of the integrated logistic support | |
| Aerospace series Programme management \x97Execution logic | |
| Aerospace series Programme Management General guidelines for acquisition and supply of open systems | |
| Aerospace series Programme Management Guide for the management of Systems Engineering | |
| Aerospace series Programme Management Guide for the risk management | |
| Aerospace Series Quality Management Systems "Data Matrix" Quality Requirements for Parts Marking | |
| Aerospace series Quality management systems \x97 Non-deliverable software requirements | |
| Aerospace series Quality management systems Assessment applicable to maintenance organizations | |
| Aerospace series Quality management systems Assessment applicable to stockist distributors and Quality systems Quality system assessment applicable to stocklist distributors | |
| Aerospace Series Quality Management Systems Nonconformance Documentation | |
| Aerospace series Quality management systems Part 001: Requirements for Aviation, Space, and Defence Quality Management System Certification Programs | |
| Aerospace series Quality management systems Part 002: Requirements for Oversight of Aerospace Quality Management System Certification/Regist rations Programs | |
| Aerospace series Quality management systems Part 003: Requirements for Aerospace Quality Management System (AQMS) Auditor Training and Qualification | |
| Aerospace series Quality management systems Qualification Procedure for Aerospace Standard Parts | |
| Aerospace series Quality management systems Requirements for Aerospace Quality Management System Certification/Regist rations Programs | |
| Aerospace series Quality management systems Requirements for stockist distributors | |
| Aerospace series Quality systems Direct Delivery Authorization Guidance for Aerospace Companies | |
| Aerospace series Quality systems Direct Ship Guidance for Aerospace Companies | |
| Aerospace series Quality systems Model for quality assurance applicable to maintenance organizations | |
| Aerospace Series Quality Systems Record Retention | |
| Aerospace series Root Cause Analysis and Problem Solving (9S Methodology) | |
| Aerospace series Test organisations General requirements for test process and capabilities | |
| American Softwood Lumber Standard | |
| ANCHOR-LAP SAFETY BELT | |
| APA Product Report PR-N213: AinsworthEngineered Treated OSB, Ainsworth Lumber Co. Ltd. | |
| Aramid Reinforced Rubber Hose for Use in Non-Potable Water Radiant Heating and Snowmelting | |
| BAR, ADJUSTER LAP AIRCRAFT SAFETY BELT | |
| Bar, Adjuster, Lap Aircraft Safety Belts | |
| Black (or Dark Red) Coal Tar Epoxy Polyamide Painting System | |
| CGA Position Statement on Aluminum Medical Oxygen Regulators | |
| CGA Position Statement on Odorizing Atmospheric Gases (Oxygen, Nitrogen, and Argon) | |
| CGA Position Statement on the Location of Pressure Relief Devices in Small Acetylene Cylinders | |
| CGA Position Statement on Underground Installation of Liquid Hydrogen Storage Tanks | |
| CGA Position Statment on Establishing an Industry Standard Color Code for Compressed Gas Cylinders | |
| Chlorinated Rubber Painting System for Field Application over a Shop-Applied Solvent Base Inorganic Zinc-Rich Primer | |
| Chlorinated Rubber Painting System for Fresh Water Immersion | |
| Chlorinated Rubber Painting System for Marine and Industrial Atmospheres | |
| Chlorinated Rubber Painting System for Salt Water Immersion | |
| Cold-Applied Coal Tar Mastic Painting System | |
| Conforming with USP/NF Monographs for Medical Gases | |
| COPPER AND COPPER ALLOY TUBING SYSTEM INCORPORATING PRESS-TYPE OR NAIL-TYPE CONNECTIONS | |
| Data Compression Standard | |
| DEFINITION OF A THRESHOLD OXYGEN-MIXTURE CONCENTRATION REQUIRING SPECIAL CLEANING OF EQUIPMENT | |
| Digital Cellular Telecommunications System (Phase 2); Channel Coding | |
| Digital Cellular Telecommunications System )Phase 2+); Enhanced Full Rate (EFR) Speech Transcoding | |
| Digital Cellular Telecommunications System; Global System of Mobile Communications (GSM 05.04 Version 5.0.0) | |
| Direct Burial of Gaseous Hydrogen Storage Tanks | |
| Epoxy Polyamide Painting System | |
| Equipment Engineering (EE); Public Telecommunication Network Equipment Electromagnetic Compatibility (EMC) Requirements; Part 2: Product Specific Compliance Criteria and Operating Conditions; Subpart 2: Transmission Equipment | |
| European Digital Cellular Telecommunications System (Phase 1); Channel Coding | |
| Expansion Epoxy Based Fittings for RTRC Rigid Nonmetallic Conduit | |
| EXPANSION FITTINGS FOR PVC RIGID NONMETALLIC CONDUIT | |
| Flashing and Stand Combination for Air Conditioning Units (Residential or Commercial Unit Curb) | |
| Foreign Object Damage (FOD) Prevention Program - Requirements for Aviation, Space, and Defence Organizations | |
| Forex Amos | |
| Four-Coat Oil Base Zinc Oxide Painting System (Without Lead or Chromate Pigment) | |
| Georgia-Pacific North Woods LLC | |
| Georgia-Pacific Wood Products LLC | |
| Georgia-Pacific Wood Products, LLC | |
| GUIDE TO ZINC-RICH COATING SYSTEMS AVAILABLE AS ELECTRONIC DELIVERY IN PDF ONLY | |
| Guidelines for Conduit-in-Casing Construction | |
| Guidelines for Solvent-Cementing Joints for PVC Rigid Nonmetallic Conduit, Duct, and Fittings | |
| Hot Water On-Demand or Automatic Activated Hot Water Pumping Systems | |
| Hot-Applied Coal Tar Enamel Painting System | |
| Installation Guidelines for Surface Nonmetallic Raceway | |
| Integrated Services Digital Network (ISDN); Videotelephony Teleservice Terminal Characteristics | |
| LINK - LAP SAFETY BELT | |
| LINK, PARACHUTE HARNESS TRIANGLE | |
| Link, Parachute Harness Tringle | |
| LINK, PARACHUTE REMOVABLE CONNECTOR, SPEED | |
| LINK, REMOVABLE CONNECTOR PARACHUTE & BARRICADE | |
| Link-Lap Safety Belt | |
| Louisiana-Pacific Corporation | |
| LP Builder Series\x99 Treated-Engineered-W ood Lap Siding | |
| MATERIAL and PROPERTY STANDARD FOR HYDRAULICALLY POWERED HOUSEHOLD FOOD WASTE DISPOSERS | |
| Norbord OSB Concrete Edge Form | |
| Norbord TallWall/Windstorm/Q uakeZone\xae Rated Sheathing for Use with IRC Energy-Heel Trusses | |
| Norbord, Inc. | |
| One-coat Oil Base Slow Drying Maintenance Painting System (Without Lead or Chromate Pigments) | |
| One-Coat Zinc-Rich Painting System | |
| Performance Standard for APA EWS Commercial I-Joists | |
| POSITION STATEMENT - Use of Oxygen and Acetylene Cylinders on a Cylinder Cart | |
| PRE-FABRICATED, TILEABLE SHOWER RECEPTORS | |
| Preparative Chromatography: of Fine Chemicals and Pharmaceutical Agents | |
| Press and Nail Connections | |
| PrimeFaces Cookbook | |
| Principles and Practice of Forensic Psychiatry | |
| Principles of Heating, Ventilating, and Air Conditioning | |
| Principles of Turbomachinery | |
| Printed Circuits Handbook, Sixth Edition | |
| Problem Based Obstetric Ultrasound | |
| Procedural Standards for Certified Testing of Cleanrooms | |
| PROCEDURAL STANDARDS FOR TAB (TESTING, ADJUSTING, & BALANCING) ENVIRONMENTAL SYSTEMS | |
| PROCEDURAL STANDARDS FOR THE MEASUREMENT AND ASSESSMENT FOR SOUND AND VIBRATION | |
| Procedural Standards for Whole Building Systems Commissioning of New Construction | |
| Proceedings of the American Society for Composites 2013-Twenty-Eighth Technical Conference | |
| Proceedings | |
| Process Piping: The Complete Guide to ASME B31.3 | |
| PROCESS SAFETY INCLUDES THE FOLLOWING API STANDARDS: PUBL 770, PUBL 9100, RP 751 RP 752 | |
| Process/Industrial Instruments and Controls Handbook, Fifth Edition | |
| PRODUCT DEVELOPMENT - MATURITY LEVEL ASSURANCE FOR NEW PARTS. METHODS, MEASUREMENT CRITERIA, DOCUMENTATION | |
| PRODUCT MANUFACTURING AND DELIVERY - ROBUST PRODUCTION PROCESS | |
| Professional Azure SQL Database Administration | |
| Programmable Controllers - Part 3: Programming Languages First Edition; (CENELEC EN 61131-3: 1993) | |
| Programmable Microcontrollers with Applications: MSP430 LaunchPad with CCS and Grace | |
| Programme Management - Configuration Management - Part 100: A guide for the application of the principles of configuration management | |
| Programme Management - Configuration Management - Part 101: Configuration identification | |
| Programme Management - Configuration Management - Part 102: Configuration status accounting | |
| Programme Management - Configuration Management - Part 103: Configuration Verifications, Reviews and Audits | |
| Programme Management - Configuration Management - Part 104: Configuration Control | |
| Programme Management - Configuration Management - Part 105: Glossary | |
| Programme Management Definition Justification and Qualification \x97 A guide to drawing up the definition justification plan and of the definition justification dossier | |
| Programming ArcGIS 10.1 with Python Cookbook | |
| Programming Arduino Next Steps: Going Further with Sketches | |
| Programming Arduino: Getting Started with Sketches | |
| Programming Microsoft Dynamics NAV | |
| Progress Reports Volume 36 No. 01 | |
| Progress Reports Volume 36 No. 02 | |
| Progress Reports Volume 36 No. 03 | |
| Progress Reports Volume 36 No. 04 | |
| Progress Reports Volume 36 No. 05 | |
| Progress Reports Volume 36 No. 06 | |
| Progress Reports Volume 36 No. 07 | |
| Progress Reports Volume 36 No. 08 | |
| Progress Reports Volume 36 No. 09 | |
| Progress Reports Volume 36 No. 11 | |
| Progress Reports Volume 36 No. 12 | |
| Progress Reports Volume 37 No. 01 | |
| Progress Reports Volume 37 No. 02 | |
| Progress Reports Volume 37 No. 03 | |
| Progress Reports Volume 37 No. 04 | |
| Progress Reports Volume 37 No. 05 | |
| Progress Reports Volume 37 No. 06 | |
| Progress Reports Volume 37 No. 07 | |
| Progress Reports Volume 37 No. 08 | |
| Progress Reports Volume 37 No. 09 | |
| Progress Reports Volume 37 No. 10 | |
| Progress Reports Volume 38 No. 01 | |
| Progress Reports Volume 38 No. 02 | |
| Progress Reports Volume 38 No. 03 | |
| Progress Reports Volume 38 No. 04 | |
| Progress Reports Volume 38 No. 05 | |
| Progress Reports Volume 38 No. 06-07 | |
| Progress Reports Volume 38 No. 08 | |
| Progress Reports Volume 38 No. 09 | |
| Progress Reports Volume 38 No. 11 | |
| Progress Reports Volume 38 No. 12 | |
| Progress Reports Volume 39 No. 01 | |
| Progress Reports Volume 39 No. 02 | |
| Progress Reports Volume 39 No. 03 | |
| Progress Reports Volume 39 No. 04 | |
| Progress Reports Volume 39 No. 06-07 | |
| Progress Reports Volume 39 No. 08 | |
| Progress Reports Volume 39 No. 09 | |
| Progress Reports Volume 39 No. 11 | |
| Progress Reports Volume 39 No. 12 | |
| Progress Reports Volume 40 No. 01-02 | |
| Progress Reports Volume 40 No. 03-04 | |
| Progress Reports Volume 40 No. 05-06 | |
| Progress Reports Volume 40 No. 07-08 | |
| Progress Reports Volume 40 No. 11-12 | |
| Progress Reports Volume 41 No. 01-02 | |
| Progress Reports Volume 41 No. 03-04 | |
| Progress Reports Volume 41 No. 05-06 | |
| Progress Reports Volume 41 No. 07-08 | |
| Progress Reports Volume 41 No. 09-10 | |
| Progress Reports Volume 41 No. 11-12 | |
| Progress Reports Volume 42 No. 01-02 | |
| Progress Reports Volume 42 No. 03-04 | |
| Progress Reports Volume 42 No. 05-06 | |
| Progress Reports Volume 42 No. 07-08 | |
| Progress Reports Volume 42 No. 09-10 | |
| Progress Reports Volume 42 No. 11-12 | |
| Progress Reports Volume 43 No. 01-02 | |
| Progress Reports Volume 43 No. 03-04 | |
| Progress Reports Volume 43 No. 05-06 | |
| Progress Reports Volume 43 No. 07-08 | |
| Progress Reports Volume 43 No. 09-10 | |
| Progress Reports Volume 43 No. 11-12 & Volume 44 No. 01 | |
| Progress Reports Volume 44 No. 02-03-04 | |
| Progress Reports Volume 44 No. 05-06 | |
| Progress Reports Volume 44 No. 07-08 | |
| Progress Reports Volume 44 No. 09-10 | |
| Progress Reports Volume 44 No. 11-12 | |
| Progress Reports Volume 45 No. 01-02 | |
| Progress Reports Volume 45 No. 03-04 | |
| Progress Reports Volume 45 No. 05-06 | |
| Progress Reports Volume 45 No. 07-08 | |
| Progress Reports Volume 45 No. 09-10 | |
| Progress Reports Volume 45 No. 11-12 | |
| Progress Reports Volume 46 No. 01-02 | |
| Progress Reports Volume 46 No. 03-04 | |
| Progress Reports Volume 46 No. 07-08 | |
| Progress Reports Volume 46 No. 09-10 | |
| Progress Reports Volume 47 No. 01-02 | |
| Progress Reports Volume 47 No. 03-04 | |
| Progress Reports Volume 47 No. 05-06 | |
| Progress Reports Volume 47 No. 07-08 | |
| Progress Reports Volume 47 No. 09-10 | |
| Progress Reports Volume 47 No. 11-12 | |
| Progress Reports Volume 48 No. 01-02 | |
| Progress Reports Volume 48 No. 03-04 | |
| Progress Reports Volume 48 No. 05-06 | |
| Progress Reports Volume 48 No. 07-08 | |
| Progress Reports Volume 48 No. 09-10 | |
| Progress Reports Volume 48 No. 11-12 | |
| Progress Reports Volume 49 No. 01-02 | |
| Progress Reports Volume 49 No. 03-04 | |
| Progress Reports Volume 49 No. 05-06 | |
| Progress Reports Volume 49 No. 07-08 | |
| Progress Reports Volume 49 No. 09-10 | |
| Progress Reports Volume 49 No. 11-12 | |
| Progress Reports Volume 50 No. 01-02 | |
| Progress Reports Volume 50 No. 03-04 | |
| Progress Reports Volume 50 No. 05-06 | |
| Progress Reports Volume 50 No. 07-08 | |
| Progress Reports Volume 50 No. 09-10 | |
| Progress Reports Volume 50 No. 11-12 | |
| Progress Reports Volume 51 No. 01-02 | |
| Progress Reports Volume 51 No. 03-04 | |
| Progress Reports Volume 51 No. 05-06 | |
| Progress Reports Volume 51 No. 07-08 | |
| Progress Reports Volume 51 No. 09-10 | |
| Progress Reports Volume 52 No. 01-02 | |
| Progress Reports Volume 52 No. 05-06 | |
| Progress Reports Volume 52 No. 07-08 | |
| Progress Reports Volume 52 No. 09-10 | |
| Progress Reports Volume 52 No. 11-12 | |
| Progress Reports Volume 53 No. 01-02 | |
| Progress Reports Volume 53 No. 03-04 | |
| Progress Reports Volume 53 No. 05-06 | |
| Progress Reports Volume 53 No. 07-08 | |
| Progress Reports Volume 53 No. 09-10 | |
| Progress Reports Volume 53 No. 11-12 | |
| Progress Reports Volume 54 No. 01-02 | |
| Progress Reports Volume 54 No. 03-04 | |
| Progress Reports Volume 54 No. 05-06 | |
| Progress Reports Volume 54 No. 07-08 | |
| Progress Reports Volume 54 No. 09-10 | |
| Progress Reports Volume 54 No. 11-12 | |
| Progress Reports Volume 55 No. 01-02 | |
| Progress Reports Volume 55 No. 03-04 | |
| Progress Reports Volume 55 No. 05-06 | |
| Progress Reports Volume 55 No. 09-10 | |
| Progress Reports Volume 56 No. 01-02 | |
| Progress Reports Volume 56 No. 03-04 | |
| Progress Reports Volume 56 No. 05-06 | |
| Progress Reports Volume 56 No. 07-08 | |
| Progress Reports Volume 56 No. 09-10 | |
| Progress Reports Volume 57 No. 01-02 | |
| Progress Reports Volume 57 No. 03-04 | |
| Progress Reports Volume 57 No. 05-06 | |
| Progress Reports Volume 57 No. 07-08 | |
| Progress Reports Volume 57 No. 09-10 | |
| Progress Reports Volume 57 No. 11-12 | |
| Progress Reports Volume 58 No. 01-02 | |
| Progress Reports Volume 58 No. 03-04 | |
| Progress Reports Volume 58 No. 05-06 | |
| Progress Reports Volume 58 No. 07-08 | |
| Progress Reports Volume 58 No. 09-10 | |
| Progress Reports Volume 58 No. 11-12 | |
| Progress Reports Volume 59 No. 01-02 | |
| Progress Reports Volume 59 No. 03-04 | |
| Progress Reports Volume 59 No. 05-06 | |
| Progress Reports Volume 59 No. 07-08 | |
| Progress Reports Volume 59 No. 09-10 | |
| Progress Reports Volume 59 No. 11-12 | |
| Progress Reports Volume 60 No. 01-02 | |
| Progress Reports Volume 60 No. 03-04 | |
| Progress Reports Volume 60 No. 05-06 | |
| Progress Reports Volume 60 No. 07-08 | |
| Progress Reports Volume 60 No. 09-10 | |
| Progress Reports Volume 60 No. 11-12 | |
| Progress Reports Volume 61 No. 01-02 | |
| Progress Reports Volume 61 No. 03-04 | |
| Progress Reports Volume 61 No. 05-06 | |
| Progress Reports Volume 61 No. 07-08 | |
| Progress Reports Volume 61 No. 09-10 | |
| Progress Reports Volume 61 No. 11-12 | |
| Progress Reports Volume 62 No. 01-02 | |
| Progress Reports Volume 62 No. 03-04 | |
| Progress Reports Volume 62 No. 05-06 | |
| Progress Reports Volume 62 No. 09-10 | |
| Progress Reports Volume 62 No. 11-12 | |
| Progress Reports Volume 63 No. 01-02 | |
| Progress Reports Volume 63 No. 03-04 | |
| Progress Reports Volume 63 No. 05-06 | |
| Progress Reports Volume 63 No. 07-08 | |
| Progress Reports Volume 63 No. 09-10 | |
| Progress Reports Volume 63 No. 11-12 | |
| Progress Reports Volume 64 No. 01-02 | |
| Progress Reports Volume 64 No. 03-04 | |
| Progress Reports Volume 64 No. 05-06 | |
| Progress Reports Volume 64 No. 07-08 | |
| Progress Reports Volume 64 No. 09-10 | |
| Progress Reports Volume 64 No. 11-12 | |
| Project Management - Best Practices: Achieving Global Excellence | |
| PROJECT MANAGEMENT CASE STUDIES AND LESSONS LEARNED : STAKEHOLDER,SCOPE, KNOWLEDGE, SCHEDULE, RESOURCE AND TEAM MANAGEMENT | |
| Project Management ToolBox: Tools and Techniques for the Practicing Project Manager | |
| Project Manager's Reference Manual | |
| Project Managers Reference Manual | |
| Propagation of Radiowaves | |
| PROPERTIES OF ALUMINUM ALLOYS: FATIGUE DATA AND EFFECTS OF TEMPERATURE, PRODUCT FORM, AND PROCESSING | |
| Propulsion Systems for Hybrid Vehicles | |
| Protection of Cryogenic Transport Vessels from Overpressurization During Operator-attended Refill | |
| Protection of Electricity Distribution Networks | |
| Protection Profile for Hardcopy Devices in IEEE Std 2600-2008 Operational Environment B | |
| Protective Glazing Manual | |
| Protocol-Oriented Programming with Swift | |
| Provisional Practice for the Performance Evaluation of the Portable X-Ray Fluorescence Spectrometer for the Measurement of Lead in Paint Films | |
| Provisional Specification for Biodiesel Fuel (B100) Blend Stock for Distillate Fuels | |
| Provisional Specification for Dedicated Short Range Communication (DSRC) Physical Layer Using Microwave in the 902 to 928 MHz Band | |
| Provisional Standard Consumer Safety Performance Specification for Diaper Changing Tables for Commercial Use | |
| Provisional Standard Consumer Safety Specification for Non-Powered Scooters | |
| Provisional Standard Guide for Individual Rights Regarding Health Information | |
| Provisional Standard Guide for Information Access Privileges to Health Information | |
| Provisional Standard Guide for Internet and Intranet Healthcare Security | |
| Provisional Standard Guide for Study and Evaluation of an Organization's Environmental Management Systems | |
| Provisional Standard Guide for Training of Persons Who Have Access to Health Information | |
| Provisional Standard Guide for User Authentication and Authorization | |
| Provisional Standard Guide on Security Framework for Healthcare Information | |
| Provisional Standard Practice for Environmental Regulatory Compliance Audits | |
| Provisional Standard Practice for Life Cycle Costing for Pollution Prevention | |
| Provisional Standard Practice for Use of Qualitative Chemical Spot Test Kits for Detection of Lead in Dry Paint Films | |
| Provisional Standard Safety Specificaation for Window Fall Prevention Devices for Non-Emergency Escape (Egress) and Rescue (Ingress) Windows | |
| Provisional Standard Safety Specification for Chests, Door Chests, and Dressers | |
| Provisional Standard Safety Specification for Window Fall Prevention Devices with Emergency Escape (Egress) Release Mechanisms | |
| Provisional Standard Specification for Audit and Disclosure Logs for Use in Health Information Systems | |
| Provisional Standard Specification for Authentication of Healthcare Information Using Digital Signatures | |
| Provisional Standard Specification for Child-Resistant Portable Gasoline Containers for Consumer Use | |
| Provisional Standard Specification for Corrugated Polyethylene (PE) Pipe and Fittings Made Using Recycled Polyethylene Materials | |
| Provisional Standard Specification for Fire Suppression Towels | |
| Provisional Standard Specification for Liquid Coating Encapsulation Products for Leaded Paint in Buildings | |
| Provisional Standard Specification for Molding Compounds, Thermosetting | |
| Provisional Standard Specification for Molding Plastics, Electrical, Thermoplastic | |
| Provisional Standard Specification for Poly (Vinyl Chloride) (PVC) Sewer and Drain Pipe Containing Recycled PVC Material | |
| Provisional Standard Specification for Pool Alarms | |
| Provisional Standard Specification for Portable Escape Ladder for Residential Use | |
| Provisional Standard Specification for Rods and Tubes of Polyethylene (PE) | |
| Provisional Standard Specification for Shelter, Electrical Equipment, Lightweight | |
| Provisional Standard Test Method for Measuring Maximum Spontaneous Heating Temperature of Art Materials | |
| Provisional Standard Test Method for Performance Testing of Excess Flow Valves | |
| Provisional Standard Test Method for Water-Extractable Chloride in Aggregate (Soxhlet Method) | |
| PVC Cold Water Gripper Fittings | |
| PVC Plastic Valves for Cold Water Distribution Systems Outside a Building and CPVC Plastic Valves for Hot and Cold Water Distribution Systems | |
| Quality management systems Guidance for the Application of AQAP 2110 within an EN 9100 Quality Management System | |
| Quality Management Systems Requirements for Aviation, Space and Defense Organizations Deliverable Software (Supplement to EN 9100) | |
| Radio Equipment and Systems (RES); HIgh Performance Radio Local Area Network (HIPERLAN); Functional Specification | |
| RESTAURANT FIRE SUPPRESSION SYSTEMS | |
| RoyOMartin WINDBRACE OSB Sheathing for Combined Shear and Wind Uplift | |
| SCALE REMOVING COMPOUND (SOLID AND LIQUID FORM) | |
| SCOURING POWDER | |
| Silicone Alkyd Painting System for New Steel | |
| SLIDE BAR, PARACHUTE HARNESS QUICK FIT EJECTOR SNAP | |
| Snap Hook Coiled-Spring, Parachute, Quick Fit | |
| Snap Hook Coiled-Spring, Parachute | |
| SNAP HOOK-COILED SPRING, PARACHUTE, QUICK FIT | |
| Snap Hook-Quick Connector Parachute Harness | |
| Snap Hook-Quick Connector, Parachute Harness | |
| SNAP, PARACHUTE HARNESS QUICK-FIT EJECTOR | |
| Snap, Paracute Harness Quick-Fit Ejector | |
| SOAP, BORAX (POWDERED) | |
| SOAP, LAUNDRY (NEUTRAL AND BUILT) | |
| SOAP, LAUNDRY, BUILT, POWERED | |
| Standard for Performance-Rated Cross-Laminated Timber | |
| Standard Provisional Guide for Risk-Based Corrective Action | |
| Standard Provisional Specification for Dedicated Short-Range Communication (DSRC) Data Link Layer | |
| Standard Provisional Specification for Labeling for Upright Brooms for Consumer and Institutional Use | |
| Standard Provisional Specification for Labeling for Wet Mops for Consumer and Institutional Use | |
| Standard Provisional Specification for Manufactured Safety Vacuum Release Systems (SVRS) for Swimming Pools, Spas and Hot Tubs | |
| Standard Provisional Test Method for Bulk Specific Gravity and Density of Compacted Bituminous Mixtures Using Automatic Vacuum Sealing Method | |
| Standard Provisional Test Method for Maximum Specific Gravity and Density of Bituminous Paving Mixtures Using Automatic Vacuum Sealing Method | |
| Standard Provisional Test Method for Measurement of Permeability of Bituminous Paving Mixtures Using a Flexible Wall Permeameter | |
| Standard Provisional Test Method for Quantitative Extraction and Recovery of Asphalt Binder from Asphalt Mixtures | |
| Standard Test Mrthod for Evaluating the Ignition Sensitivity and Fault Tolerance of Oxygen Regulators Used for Medical and Emergency Applications | |
| Steel Joist Shop Painting System | |
| Structural Plywood (with Typical APA Trademarks) | |
| Suction Relief Valves | |
| Suitability of DOT-3A Type Cylinders for Continuous Service | |
| Television Systems; Enhanced 625-Line PAL/SECAM Television; Ghost Cancellation Reference (GCR) Signals | |
| The Practical Reference Guide for Corrosion of Welds - Causes and Cures | |
| The Practical Reference Guide for Hardfacing | |
| The Practical Reference Guide for Radiographic Inspection - Acceptance Criteria | |
| The Practical Reference Guide for Welding Aluminum Commercial Applications | |
| The Practical Reference Guide for Welding Aluminum High-Quality Fusion Welding | |
| The Practical Reference Guide for Welding Inspection Management - Visual Inspection of Pressure Vessels and Pressure Piping | |
| The Practical Reference Guide for Welding Titanium | |
| The Practical Reference Guide to Positioning | |
| The Practical Reference Guide to Welding Metallurgy - Key Concepts for Weldability | |
| Three-Coat Latex Painting System | |
| Three-Coat Oil Base Zinc Chromate Painting System | |
| Three-Coat Oil Base Zinc Oxide Painting System (Without Lead or Chromate Pigment) | |
| TILEABLE SHOWER RECEPTORS AND SHOWER KITS | |
| Tolko Industries Ltd. | |
| Toxicity Considerations of Nonmetallic Materials in Medical Oxygen Cylinder Valves | |
| Training and Qualifications for the Installers of Medical Gas Supply Systems at Consumer Sites |
| << Prev | Next >> |