Accuris Datasheets for Standards and Technical Documents

Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more

Page: 1 500 1000 1100 1150 1200 1250 1300 1350 1400 1410 1420 1430 1440 1450 1454 1455 1456 1457 1458 1459 1460 1461 1462 1463 1464 1465 1466 1470 1480 1490 1500 1510 1520 1550 1600 1620
Product Name Notes
2 Bolt Flange & Drive / 2 Bolt Actuator Flange Drive (primarily for Valves and Cocks)
2.175 P.C. DIA. Square Accessory Flange & Mounting Pad
2.175\x94 P.C.DIA. Square Accessory Flange & Square Mounting Pad - Unified Thread
3D CAD and FIAPP: Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process
40\xb0 \x91V\x92, Coupling Data
4\x94 P.C. Dia. Starter Mounting Flange
5.750\x94 P.C. Dia. Starter Mounting Flange.
5\x94 Constant Speed Unit Pad & Drive / Flange & Shaft 4.400\x94 P.C.D. x.650\x94 (Twin Oilway) Edition 4
5\x94 P.C. Dia. Starter Mounting Flange
5\x94 PCU Pad & Drive 4.400\x94 PCD x .650\x94, Three Oilway. Unified Threads 5\x94 PCU Flange & Shaft 4.400\x94 PCD x .650\x94, Three Oilway. Unified Threads
5\x94 Propeller Control Unit Pad & Drive / Flange & Shaft 4.400\x94 P.C.D. x .650\x94 (Three Oilway)
6\x94 Constant Speed Unit Pad & Drive 5.400\x94 P.C.D. x .875\x94 Twin Oilway
6\x94 PCU Pad & Drive 5.400\x94 PCD x .875\x94. Three Oilway. Unified Threads 6\x94 PCU Flange & Shaft 5.400\x94 PCD x .875\x94. Three Oilway. Unified Threads
6\x94 Propeller Control Unit Pad & Drive / Flange & Shaft 5.400\x94 P.C.D. x .875\x94 (Three Oilway)
7\x94 P.C. Dia. Starter Mounting Flange
A New Approach to Assessing and Measuring Project Complexity
A Standard Method of Dimensioning Compressor Blades
A Standard Method of Dimensioning Turbine Blades
A Standardized Approach to Identifying and Defining Owner Value Interests and Aligning the E&C Response
Accessory Drives & Pads (Taper Flanges)
Achieving an Integrated Data Environment: A Strategic Initiative
Achieving Zero Rework through Effective Supplier Quality Practices
Advanced Work Packaging: Design through Workface Execution
Allocation of Insurance-Related Risks and Costs on Construction Projects
Americans with Disabilities Act
An Analysis of Multiskilled Labor Strategies in Construction
An Introduction to Integrated Database Systems
Angle Extrusions
Assessing the Maturity and Accuracy of Front End Engineering Design
Assessment of Effective Front End Planning Processes
Attracting and Maintaining a Skilled Construction Work Force
Audio Inductors
Audio Transformers for Electronic Equipment
B.A. Thread Insert - Wire Section
B.S.F. Thread - Wire Section
B.S.P.F. Thread Insert - Wire Section
B.S.W. Thread Insert - Wire Section
Barriers to Implementation of CII Concepts: An Overview
Basic Seat Rail Geometry & Basic Seat Pin Geometry
Bend Allowances for Full Scale Layout
Best Modern Practices for Design in Fast Track Projects
Best Practices in Quality Management for the Capital Facilities Delivery Industry
Building a Successful Global Engineering and Construction Company
Bulb Angle Extrusions
Cable Connectors for Audio Facilities for Radio Broadcasting
Cable Identification Sleeves
Ceramic Based Printed Circuits, Test Standards for
Ceramic Based Printed Circuits, Unit Standards for
Ceramic Dielectric Capacitors Classes I, II, III and IV
Channel Numbering System Class D - Citizens' Radio Service
Characteristics of synthetic aperture radars operating in the Earth exploration-satellit e service (active) around 9 600 MHz
Characterization and assessment of aggregate interference to the Earth exploration-satellit e service (passive) sensor operations from multiple sources of man-made emis
Characterization and assessment of aggregate interference to the Earth exploration-satellit e service (passive) sensor operations from multiple sources of man-made emissions
Circular Accessory Flange & Drive / Accessory Pad & Drive 10.5\x94 P.C.D. x 1.125\x94
Circular Accessory Flange & Drive / Accessory Pad & Drive 12\x94 P.C.D. x 1.250\x94
Circular Accessory Flange & Drive / Accessory Pad & Drive 8.000\x94 P.C.D. x .875\x94
Circular Accessory Flange & Drive / Accessory Pad & Drive 9.000\x94 P.C.D. x 1.000\x94
Circular Accessory Flange & Drive 4.290\x94 P.C.D. x .500\x94
Circular Flange & Drive / Circular Pad & Drive (Pinion Located) 8.000\x94 P.C. DIA. X 1.125\x94
Circular Flange & Drive / Circular Pad & Drive, 6.000\x94 P.C.D. x .625\x94
Circular Flange & Drive / Circular Pad & Drive, 7.000 P.C.D. x .750\x94
Circular Flange & Drive / Mounting Pad & Drive, 5.197 P.C.D. x .500
Circular Flange & Drive / Mounting Pad & Drive, 5.197 P.C.D. x .625
Circular Flange & Drive 4.290\x94 P.C.D. x .500\x94
Circular Flange & Drive 5.000\x94 P.C.D. x .750\x94
Circular Flange & Drive 6.000\x94 P.C.D. x .875\x94
Circular Flange & Drive 7.000\x94 P.C.D. x 1.000\x94
Circular Flange & Drive 9.000\x94 P.C.D. x 1.250\x94
Circular Flange & Drive for Electrical Machines / Pad & Drive for Electrical Machines : 5.000\x94 P.C.D. x .500\x94
Circular Flange & Drive for Electrical Machines / Pad & Drive for Electrical Machines : 6.000\x94 P.C.D. x .5625\x94
Circular Flange & Drive for Electrical Machines / Pad & Drive for Electrical Machines : 7.000\x94 P.C.D. x .6875\x94
Circular Flange & Drive for Electrical Machines / Pad & Drive for Electrical Machines : 8.000\x94 P.C.D. x .8125\x94
Circular Flange & Drive for Electrical Machines / Pad & Drive for Electrical Machines : 9.000\x94 P.C.D. x .9375\x94
Circular Flange & Drive. 8.0\x94 P.C.D. x 1.125\x94
Circular Flanges & Drives / Circular Pads & Drives
Circular Pad & Drive. 4.290\x94 P.C.D. x .625\x94
Circular Waveguides
Code to Protective Treatments
Commodity vs Value-Added Contractor Services
Competing in the Global Market
Constructability A Primer
Construction Industry Craft Training in the United States and Canada
Construction Industry Institute Model Plant Update
Construction Industry Institute Model Plant
Construction Productivity Research Program - Phase IV
Construction Productivity Research Program \x96 Phase V
Construction Productivity Research Program Phase III
Continuing Supervisory Education: An Overview
Contract Risk Allocation and Cost Effectiveness
Cost-Trust Relationship
Coupling Flanges, 60\xb0 Vee Form
Craft Labor Productivity
Craft Productivity Program \x96 Phase I
Craft Productivity Research Program Phase II
Critical Success Factors for Project Commissioning and Startup
Definition of Drawing State
Deploying Best Practices in Unfamiliar Countries
Design for Maintainability: Improving Project Return on Investment
Design Practices to Facilitate Construction Automation
Details of Screwdriver for use with Plunge Milled Slots
Detection and resolution of radio frequency interference to Earth exploration-satellit e service (passive) sensors
Dimensional Standard Coplanar Magnetic Tape Cartridge Type CP II (Compact Cassette)
Dimensions for Mounting Rings & for Circular Flanges of Tank Mounted Accessories
Dimensions.of Threads, not included in B.S.2779 ( 5/16\x94 & 7/16\x94 Pipe Diameters, Special Truncation)
Dispute Prevention and Resolution Techniques in the Construction Industry
EDI: Concepts and Applications
Effective Management Practices and Technologies for Lessons Learned Programs
Effective Project Alignment for Construction Success
Effectiveness of Innovative Crew Scheduling
Electrical Characteristics of Balanced Voltage Digital Interface Circuits
Electrical Characteristics of Generators and Receivers for Use in Balanced Digital Multipoint Systems
Electrical Characteristics of Unbalanced Voltage Digital Interface Circuits
Electron Tubes
Electronic Simulation in Construction
Emerging Construction Technologies and the Advanced Construction Technology System
Employee-Based Project Incentives
Engineering Deliverables: Get It Right the First Time
Engineering Productivity Measurement
Engineering Productivity Measurements II
Enhancing Innovation in the EPC Industry: Industry Implementation Studies
Enhancing Innovation in the EPC Industry
Environmental Remediation
Equitable Risk Allocation
Estimating as a Competency in Capital Projects
Evaluation of Design Effectiveness
Evaluation of the potential for pulsed interference from planned and future spaceborne synthetic aperture radar sensors in the earth exploration-satellit e (active) service to radionavigation-sate llite service receivers in the...
Evaluation of the potential for pulsed interference from planned and future spaceborne synthetic aperture radar sensors in the earth explorationsatellite (active) service to radionavigation-sate llite service receivers in the 1...
Examination of the Shipbuilding Industry
FEASIBILITY OF SHARING BETWEEN ACTIVE SENSORS USED ON EARTH EXPLORATION AND METEOROLOGICAL SATELLITES AND THE RADIOLOCATION SERVICE
FEASIBILITY OF SHARING BETWEEN THE FSS (SPACE-TO-EARTH) AND THE EARTH EXPLORATION-SATELLIT E (PASSIVE) AND SPACE RESEARCH (PASSIVE) SERVICES IN THE BAND 18.6-18.8 GHz
Feasibility of sharing in the band 35.5-36 GHZ between the Earth exploration-satellit e service (active) and space research service (active), and other services allocated in this band
Fiber Optic Terminal Devices, Generic Spec. for
Finding Leading Indicators to Prevent Premature Starts to Construction
Fits for Ball Bearings
Fixed Wirewound Power Resistors
FLAMMABILITY TESTS FOR ELECTRONIC COMPONENTS
Flanged Lightening Holes
FOTP-101 Accelerated Oxygen Aging
FOTP-52 Method for Measuring Temperature Dependence of Attenuation for Optical Waveguide Fibers
Frequency bands and bandwidths used for satellite passive remote sensing
Frequency bands and bandwidths used for satellite passive sensing
Frequency bands and required bandwidths used for spaceborne active sensors operating in the Earth exploration-satellit e (active) and space research (active) services
Front End Planning for Renovation and Revamp Projects: An Overview
Front End Planning Tool: PDRI - Small Industrial Projects
Front End Planning Tool: PDRI for Infrastructure Projects
Front End Planning Tool: PDRI\x96Small Infrastructure Projects
Front End Planning: Break the Rules, Pay the Price
Full Scale Layout Reproduction Fuselage Lines - Identification and Layout
Full Scale Layout Reproduction Negative Sizes
Full Scale Layout Reproduction recommended Standard Symbols
Full Scale Layout Reproduction. Recommended Terms and Abbreviations
Future Construction Needs of Virtual Design Models
General Document for Connectors, Electric, Printed- Wiring Board
Generic Specification for Fiber Optic Terminal Devices
Global Procurement and Materials Management
Global Project Controls and Management Systems
Grooves for Circlips, AS 4571
Grooves for Retaining Rings. AS 4570
Guidelines For Implementing a Constructability Program
Handle for Escape Hatch Control
Holder Outlines and Pin Connections for Quartz Crystal Units
Hydraulic Hand Pump (Double Acting Type)
IDENTIFICATION MARKING OF PARTS & ASSEMBLIES
Identification of B.A. & B.S.F. Nuts & Bolts, and Identification of Unified Nuts, Bolts & Screws
Impact of Various Construction Contract Types and Clauses on Project Performance
Improved Workers\x92 Compensation Management in Construction
Improving the Accuracy and Timeliness of Project Outcome Predictions
Incentive Plans: Design & Application Considerations
Industrial Engineering/Manufact uring Techniques for Enhancing Construction Project Performance
Industrial Modularization: How to Optimize; How to Maximize
Industry Standard for Connectors, Electrical Flat Cable Type
Information Integration to Improve Capital Project Performance
Innovative Delivery of Information to the Crafts
Installation Drawing of Flanged Half of 1 1/2\x94 Fuelling Coupling
Installation Drawing of Flanged Half of 2 1/2" Fuelling Coupling
INTERCHANGEABLE VARIABLE BLOCK DATA FORMAT FOR POSITIONING, CONTOURING, AND CONTOURING/POSITIONI NG, NUMERICALLY CONTROLLED MACHINES
Interconnection of Data Terminal Equipment with a Communications Channel
Interface Between Data Processing Terminal Equipment and Data Communication Equipment
Interface between Data Terminal Equipment and Automatic Calling Equipment for Data Communication
Interface Between Facsimile Terminal Equipment and Voice Frequency Data Communication Terminal Equipment
Interface Management
International Standards and U.S. Construction Industry Competitiveness
Introduction to the Value Management Toolkit
Is There a Demographic Labor Cliff that Will Affect Project Performance?
Knob - Braking Parachute Control
Knob for High Pressure Fuel Control (incorporating Re-Light Switch)
Land Mobile Signalling Standard
Lead Taping of Components in the Radial Configuration for Automatic Handling
Leadership in a Knowledge Era: Achieving the Learning Organization
Leading Indicators during Project Execution
Leading Industry Practices for Estimating, Controlling, and Managing Indirect Construction Costs
Lean Implementation at the Project Level
Lean Principles in Construction
Leveraging Technology to Improve Construction Productivity
Line Circuit (Card) for 1A2 Generic Multi-Line Key Telephone Systems
Lofting Procedure
Loudspeakers, Power Rating, Full Range
Loudspeakers, Power Rating, Single Voice Coil
Magnetic Field Polarity, Including Definitions and Determination of Polarity
Making the Case for Advanced Work Packaging as a Standard (Best) Practice
Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages
Making Zero Rework A Reality
Managing a Portfolio of Projects: Metrics for Improvement
Master Reference JIG
Maximizing Engineering Value
Maximizing Virtual Team Performance in the Construction Industry
Measuring Organizational Implementation Status: CII Knowledge Implementation Index (CKII)
Measuring Quality Performance on EPC Projects
Measuring Safety Performance with Active Safety Leading Indicators
METAL ENCASED FIXED PAPER DIELECTRIC CAPACITORS FOR D.C. APPLICATION
Methodology for determining terrestrial and space-to-Earth sharing and coordination criteria for meteorological aids in the 400.15-406 MHz and 1 668-1700 MHz bands
Metrics That Matter: Improving Project Progress and Performance Assessment
Microwave Transmission Systems
Miniature Waveguide Flanges, Unpressurized Contact Type (CMR 90 to CMR 284)
Minimum Standard for Test Conditions Common to FM or PM Land-Mobile Communications Equipment 25-470 MHz
Minimum Standards for Land Mobile Communication Continuous Tone-Controlled Squelch Systems (CTCSS)
Minimum Standards for Land Mobile Communication FM Or PM Receivers, 25-947 MHz
Minimum Standards for Land-Mobile Communication Antennas Part I - Base or Fixed Station Antennas
Minimum Standards for Portable/Personal Radio Transmitters, Receivers, and Transmitter/Receiver Combination Land Mobile Communications FM or PM Equipment, 25 - 1000 MHz
Mitigating Threats of Counterfeit Materials in the Capital Projects Industry
Mitigation technique to facilitate the use of the 1 215-1 300 MHz band by the Earth exploration-satellit e service (active) and the space research service (active)
MODEX: Automated Decision Support System for Modular Construction
Multi-Line Key Telephone Systems (KTS) for Voiceband Applications
Needs Assessment for Construction Automation
Non-Reversible Chains
Onsite Design: When and How Much?
Optimizing Construction Input in Front End Planning
Organizational Strategies for Instantaneous Project Controls
Owner and Contractor Jobsite Organization
Owner\x92s Tool for Project Delivery and Contract Strategy Selection
Packing for Return CRT Glass Component Packaging Material
Passive Electronic Component Parts, Test Methods for; General Instructions and Index of Tests
Passive Electronic Component Parts, Test Methods for; Method 10: Effect of Soldering
Passive Electronic Component Parts, Test Methods for; Method 11: Thermal Shock in Air
Passive Electronic Component Parts, Test Methods for; Method 12: Heat-Life Test
Passive Electronic Component Parts, Test Methods for; Method 13: Insulation Resistance Test
Passive Electronic Component Parts, Test Methods for; Method 1: Humidity (Steady State)
Passive Electronic Component Parts, Test Methods for; Method 2: Moisture Resistance (Cycling)
Passive Electronic Component Parts, Test Methods for; Method 3: Humidity (Steady State-Sealed Container)
Passive Electronic Component Parts, Test Methods for; Method 4: Dielectric Test (Withstanding Voltage)
Passive Electronic Component Parts, Test Methods for; Method 5: Salt Spray (Corrosion)
Passive Electronic Component Parts, Test Methods for; Method 6: Mechanical Robustness of Terminals
Passive Electronic Component Parts, Test Methods for; Method 7: Vibration Fatigue Test (Low Frequency, 10 to 55 Hertz)
Passive Electronic Component Parts, Test Methods for; Method 8: Vibration, High Frequency
Passive Electronic Component Parts, Test Methods for; Method 9: Solderability
Percentage R.P.M. Tachometer Flange & Drive
Performance and interference criteria for satellite passive remote sensing
Pipe Coupling Flanges
Piping: Improving P&IDs, Supplier Data, and Packaged Units
Planning A Global Virtual Engineering Team: A Tool for Success
Polarized Aluminum Electrolytic Capacitors For Long Life (Type 1) And For General Purpose Application (Type 2)
Pre-Project Planning Tool: PDRI for Buildings
Pre-Project Planning: Beginning A Project the Right Way
Precursors of High-impact, Low-frequency Events, Including Fatalities
Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making
PREFERRED FREQUENCIES AND NECESSARY BANDWIDTHS FOR SPACEBORNE ACTIVE REMOTE SENSORS
Preferred Values
Preparation of Surface of Layout Blanks for Lithographic Reproduction
Preparation of Surface of Layout Blanks for Photographic Reproduction
Preview of Constructability Implementation
Probabilistic Risk Management in Design and Construction Projects
Procedures for Document Facsimile Transmission
Product Integrity Concerns in Low-cost Sourcing Countries: Counterfeiting within the Construction Industry
Productivity Measurement: An Introduction
Project Control for Engineering
Project Management Skills of the Future
Project Plates. Non-Reversible Chain.
Project Site Leadership Role in Improving Construction Safety
Projects and Competition of the Future
Protection criteria for arrival time difference receivers operating in the meteorological aids service in the frequency band 9-11.3 kHz
Protection of space research service space-to-Earth links in the 8 400-8 450 MHz and 8 450-8 500 MHz bands from unwanted emissions of synthetic aperture radars operating in the Earth...
Protection of the radio astronomy service in the frequency band 10.6-10.7 GHz from unwanted emissions of synthetic aperture radars operating in the Earth exploration-satellit e service (active) around 9 600...
Protection of the radio astronomy service in the frequency band 10.6-10.7 GHz from unwanted emissions of synthetic aperture radars operating in the Earth explorationsatellite service (active) around 9 600 MHz...
Pulse Transformers for Radar Equipment
Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors
Quantitative Effects of Project Change
Quantitative Measurement of Project Manager Competencies
Racks, Panels, and Associated Equipment
Radio Frequency Identification Tagging
Real-time Pro-active Safety in Construction
Recommendations for the Identification & Packaging of Rubber Components
Recommended Colour Code for the Identification of Rubbers in Aircraft
RECOMMENDED PRACTICE FOR THE MEASUREMENT OF X-RADIATION FROM DIRECT-VIEW RELEVISION PICTURE TUBES
Recommended Storage Life for Rubber & Rubber Components
Recommended Storage Procedure for Rubber & Rubber Components
Recruiting and Retaining Future Engineering and Construction Leaders
Reel Packaging of Resistors
Reference antenna pattern for passive sensors operating in the Earth exploration-satellit e service (passive) to be used in compatibility analyses in the frequency range 1.4-100 GHz
Reference antenna pattern for passive sensors operating in the Earth exploration-satellit e service (passive) to be used in compatibility analyses in the frequency range 1.4-450 GHz
Reference antenna pattern for passive sensors operating in the Earth explorationsatellite service (passive) to be used in compatibility analyses in the frequency range 1.4-100 GHz
Reimbursable Contracts
Relation of Sprocket to Guard. Non-Reversible Chain.
Ring Nuts
Risk Assessment on International Projects: A Management Approach
Safety Performance through Operational Excellence \x96 Phase I
Safety Performance through Operational Excellence, Phase II
Safety Plus: Making Zero Accidents A Reality
Schedule Reduction
Scope Definition and Control
SHARING BETWEEN SPACEBORNE PASSIVE SENSORS AND THE INTER-SATELLITE SERVICE OPERATING NEAR 118 AND 183 GHz
Sharing between the Earth exploration-satellit e (passive) and airborne altimeters in the aeronautical radionavigation service in the band 4 200-4 400 MHz
Sharing in the band 5 250-5 350 MHz between the Earth exploration-satellit e service (active) and wireless access systems (including radio local area networks) in the mobile service
Simulated Shipping Tests for Consumer Electronic Products and Electronic Components
Sleeve for increasing 5/16\x94 O/D Pipe to 3/8\x94 O/D
Small Contact Standard for Electrical Connectors
Small Project Execution
Specifying Signal Quality for Transmitting and Receiving Data Processing Terminal Equipments Using Serial Data Transmission at the Interface with Non-Synchronous Data Communication Equipment
Square Flange & Drive / Square Pad & Drive, 1.437 P.C. DIA
Square Flange & Drive / Square Pad & Drive, 2.000 P.C. DIA
Square Flange & Drive / Square Pad & Drive, 2.625 P.C. DIA
Square Flange & Drive / Square Pad & Drive, 3.125 P.C. DIA
Square Flange & Drive / Square Pad & Drive, 3.812 P.C. DIA
Square Flange & Drive / Square Pad & Drive, 3.812\x94 P.C.D. x .375
Square Flange & Drive / Square Pad & Drive, 4.312 P.C. DIA
Standard 5\xbd / 7\xbd Counter Rotating Propeller Shafts & Engine Nose
Standard Airman
Standard Capacity Ratings for Hydraulic Components
Standard Diameters of Jack Piston Rods
Standard Diameters of Shock Absorbers and Jack Cylinders
Standard Diameters
Standard Dimensions for Manhole Flanges for Aircraft Tanks
Standard Jack and Shock Absorber Data
Standard Layout Blank
Standard Layout Tables
Standard Method of Test for Effective Series Resistance (ESR) and Capacitance of Multilayer Ceramic Capacitors at High Frequencies
Standard No. 2 Propeller Shaft and Engine Nose
Standard No. 3 Propeller Shaft & Engine Nose
Standard No. 4 Propeller Shaft and Engine Nose
Standard No. 4/6 Counter Rotating Propeller Shafts (Integral Bearing Race) & Engine Nose
Standard No. 4/6 Counter Rotating Propeller Shafts (Separate Bearing Race) & Engine Nose
Standard No. 5 Propeller Shaft and Engine Nose
Standard No. 5/7 Counter Rotating Propeller Shafts & Engine Nose
Standard No. 6 Propeller Shaft and Engine Nose
Standard No.1 Propeller Shaft
Standard No.6 Propeller Shaft & Engine Nose (with Unified Screw Threads & Four-Line Oil System)
Standard Rolled Top-Hat Section (Lipped) 16 Gauge
Standard Rolled Top-Hat Section (Lipped) 18 Gauge
Standard Rolled Top-Hat Section (Lipped) 20 Gauge
Standard Test Method for Destructive Physical Analysis of High Reliability Ceramic Monolithic Capacitors
Standard Test Methods for Electromechanical Switches (Test Methods for Logic (TTL) Level Endurance and Low Level Endurance)
Standard Test Methods for Electromechanical Switches
Standard Test Procedures for Fiber Optic Fibers, Cables, Transducers, Connecting and Terminating Devices
Standard Threads
Standards for Silicon Rectifier Diodes and Stacks
Starting from Scratch: A New Project Delivery Paradigm
Std. No.1 Propeller Shaft (with Unified Screw Threads)
Std. No.2 Propeller Shaft & Engine Nose (with Unified Screw Threads)
Std. No.3 Propeller Shaft & Engine Nose (with Unified Screw Threads)
Std. No.4 Propeller Shaft & Engine Nose (with Unified Screw Threads)
Std. No.5 Propeller Shaft & Engine Nose (with Unified Screw Threads)
Std. No.6 Propeller Shaft & Engine Nose (with Unified Screw Threads)
Strategies for Improving Hazard Recognition
Structural Standards for Steel Antenna Towers and Antenna Supporting Structures
Structural Standards for Steel Transmitting and Antennas, Supporting Steel Structures
Successful Delivery of Flash Track Projects
Successful Delivery of Mega-Projects
Successfully Planning for Project Manager Succession
Summary of Standard Industry-wide Quality Metrics
Supercharger Mounting Flange / Supercharger Pad & Drive 2.4404\x94 (62M.M.) CTS
Supercharger Mounting Flange / Supercharger Pad & Drive 3.307\x94 (84M.M.) CTS
Supercharger Mounting Flange / Supercharger Pad & Drive 4.500\x94 CTS
Supercharger Mounting Flange / Supercharger Pad & Drive 6.000\x94 CTS
Support for the Implementation Champion: The Experience Reference Index
Sustainability during Construction: Process and Actions
Sustainable Design and Construction in Industrial Construction
Table of Accessory Flanges
Tapped Holes for Wire Thread Inserts , (B.A., B.S.F., B.S.W. Threads) - Unplated, Cadmium Plated
Tapped Holes for Wire Thread Inserts, (B.S.P.F. Threads), Unplated, Cadmium plated
Tapped Holes for Wire Thread Inserts, (Unified Threads), Unplated, Cadmium plated
Targeted Safety Programs
Team Building: Improving Project Performance
Technical and operational characteristics for passive sensors in the Earth exploration-satellit e (passive) service to facilitate sharing of the 10.6-10.68 GHz and 36-37 GHz bands with the fixed and mobile...
Technical and operational characteristics of Earth exploration-satellit e service (EESS) systems operating above 3 000 GHz
Technical and operational characteristics of ground-based meteorological aids systems operating in the frequency range 272-750 THz
Techniques for Radical Reduction in Project Cycle Time
Tee Extrusions
Terminating and Signaling Equipment for Microwave Communication Systems Part I: Telephone Equipment
The Field Rework Index: Early Warning for Field Rework and Cost Growth
The Impact of Changes on Construction Cost and Schedule
The Implementation Planning Model: An Overview
The Owner\x92s Role in Project Success
The Owners' Role in Construction Safety
The Role of Executive Support in Implementation Champion Success
The Shortage of Skilled Craft Workers in the U.S.
The True Impacts of Late Deliverables at the Construction Site
Time Division Multiplex Equipment Standard for Nominal 4 kHz Channel Bandwidths
TP-31A Humidity Test Procedure for Electrical Connectors
Trade-Off between Cost and Schedule
Transferring Experiential Knowledge from the Near-retirement Generation to the Next Generation
Transforming Modular Construction for the Competitive Advantage through the Adaptation of Shipbuilding Production Processes to Construction
Triangular Flange and Drive 3.450\x94 P.C.D. x .375\x94
TYPE DESIGNATION SYSTEM FOR MICROELECTRONIC DEVICES
Typical Assembly showing Incorrect & Correct Method. Non-Reversible Chain
Typical technical and operating characteristics and frequency bands used by space research service (passive) planetary observation systems
Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band
Typical technical and operational characteristics of Earth exploration-satellit e service (active) systems using allocations between 40 MHz and 238 GHz
Typical technical and operational characteristics of Earth exploration-satellit e service (active) systems using allocations between 432 MHz and 238 GHz
Typical technical and operational characteristics of Earth exploration-satellit e service (passive) systems using allocations between 1.4 and 275 GHz
U.N.C. Thread Insert - Wire Section
U.N.F. Thread - Wire Section
Use of remote sensing systems for data collection to be used in the event of natural disasters and similar emergencies
Use of remote sensing systems for data collections to be used in the event of natural disasters and similar emergencies
Use of remote sensing systems in the study of climate change and the effects thereof
Use of the band 1 668.4-1 710 MHz by the meteorological aids service and meteorological-satel lite service (space-to-Earth)
Using Near Miss Reporting to Enhance Safety Performance
Wing Spreading and Folding Control Lever
Wireless Communication and Computing at the Construction Jobsite
Wirewound Variable Resistors
Work Force View of Construction Productivity
Wound Cut Cores
ZERO INJURY TECHNIQUES

<< Prev Next >>