Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
150
200
250
300
350
400
450
460
470
480
490
500
504
505
506
507
508
509
510
511
512
513
514
515
516
520
530
540
550
560
570
600
650
700
750
800
850
1000
1500
1620
| Product Name | Notes |
|---|---|
| Aerodynamics and Flying Qualities | |
| AERODYNAMICS AND FYING QUALITIES | |
| AEROELASTICITY | |
| Air Compressors | |
| Ancillary Support Equipment, Test Equipment and Tools | |
| Approval and Control of Heat Treatment Furnaces | |
| Approval System for Welding Consumables for Structural Steels | |
| ASAAC Standards Part 1 Proposed Standards for Architecture | |
| ASAAC Standards Part 1 Proposed Standards for Common Functional Modules | |
| ASAAC Standards Part 1 Proposed Standards for Communications/Netwo rk | |
| ASAAC Standards Part 1 Proposed Standards for Packaging | |
| ASAAC Standards Part 1 Proposed Standards for Software | |
| ASAAC Standards Part 2 Rationale Report for Architecture Standards | |
| ASAAC Standards Part 2 Rationale Report for Common Functional Modules Standards | |
| ASAAC Standards Part 2 Rationale Report for Communications/Netwo rk Standards | |
| ASAAC Standards Part 2 Rationale Report for Packaging Standards | |
| ASAAC Standards Part 2 Rationale Report for Software Standards | |
| Bulk Embarkation of Compound and Liquified Gases Part 1 Nitrogen | |
| Bulk Embarkation of Compound and Liquified Gases Part 2 Oxygen | |
| Care and Custody of Embodiment Loan Items Supplied to a Shipbuilder by the Ministry | |
| Certification Specifications for Airworthiness Part: 00 : PROCEDURES FOR USE, CONTENT AND DEFINITIONS | |
| Certification Specifications for Airworthiness Part: 01 : FIXED WING COMBAT AIR SYSTEMS | |
| Certification Specifications for Airworthiness Part: 03 : SMALL AND MEDIUM TYPE AIR SYSTEMS | |
| Certification Specifications for Airworthiness Part: 05 : LARGE TYPE AIR SYSTEMS | |
| Certification Specifications for Airworthiness Part: 09 : Remotely Piloted Air Systems | |
| Chemical Agent Resistance Requirements for Coatings Applied to Military Equipment | |
| Classification for Weight Groups for Surface Ships | |
| Classification, Inspection Requirements and Acceptance Standards for Steel Castings | |
| Code of Practice for Compressed Air System Cleanliness | |
| Code of Practice for Ship Husbandry | |
| Composite Materials Data Handbook | |
| Compressed Air Systems | |
| Configuration Management Nuclear Submarines In Service Support | |
| Configuration Management of In-service Submarines | |
| Control and Surveillance Equipment for Plant and Systems Installation | |
| Defence Safety Management Requirements for Defence Systems Part 3: Requirements (Air Sector) | |
| Design and Airworthiness Requirement for Service Aircraft Part 7: Rotorcraft Supplement 7: Operating Limitations and Information (Subpart G) | |
| Design and Airworthiness Requirements for Service Aircraft - Part 1: Fixed Wing - Section 5: Powerplant | |
| Design and Airworthiness Requirements for Service Aircraft Design and Construction - Leaflets | |
| Design and Airworthiness Requirements for Service Aircraft Gas Turbine Auxiliary Power Units | |
| Design and Airworthiness Requirements for Service Aircraft Operating Limitations and Information | |
| Design and Airworthiness Requirements for Service Aircraft Part 0 Procedures for Use, Content and Definitions | |
| Design and Airworthiness Requirements for Service Aircraft Part 1 - Combat Aircraft | |
| Design and Airworthiness Requirements for Service Aircraft Part 1 Section 1 - General | |
| Design and Airworthiness Requirements for Service Aircraft Part 1 Section 2 - Flight | |
| Design and Airworthiness Requirements for Service Aircraft Part 1 Section 3 - Structure | |
| Design and Airworthiness Requirements for Service Aircraft Part 1 Section 9 - Military Specific Systems | |
| Design and Airworthiness Requirements for Service Aircraft Part 11 - Engines | |
| Design and Airworthiness Requirements for Service Aircraft Part 13 \x96 Military Common Fit Equipment | |
| Design and Airworthiness Requirements for Service Aircraft Part 15 \x96 Items with No Specific Military Requirements | |
| Design and Airworthiness Requirements for Service Aircraft Part 1: Fixed Wing Section 6: Equipment | |
| Design and Airworthiness Requirements for Service Aircraft Part 3: Small and Medium Type Aeroplanes | |
| Design and Airworthiness Requirements for Service Aircraft Part 5: Large Type Aeroplanes | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 - Rotocraft | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 1 GENERAL AND OPERATIONAL REQUIREMENTS | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 10 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 2 STRUCTURAL STRENGTH AND DESIGN FOR FLIGHT | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 3 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 4 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 5 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 6 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 7 INSTALLATIONS | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 8 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7 \x96 Rotorcraft Section 9 | |
| Design and Airworthiness Requirements for Service Aircraft Part 7: Rotorcraft Supplement 1: General (Subpart A) | |
| Design and Airworthiness Requirements for Service Aircraft Part 7: Rotorcraft Supplement 2: Flight (Subpart B) | |
| Design and Airworthiness Requirements for Service Aircraft Part 7: Rotorcraft Supplement 3: Strength Requirements (Subpart C) | |
| Design and Airworthiness Requirements for Service Aircraft Part 7: Rotorcraft Supplement 4: Design and Construction (Subpart D) | |
| Design and Airworthiness Requirements for Service Aircraft Part 7: Rotorcraft Supplement 5: Powerplant (Subpart E) | |
| Design and Airworthiness Requirements for Service Aircraft Part 7: Rotorcraft Supplement 6: Equipment (Subpart F) | |
| Design and Airworthiness Requirements for Service Aircraft Part 9 \x96 UAV Systems | |
| DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT VOLUME 1 - AEROPLANES BOOK 1 (PARTS 0 TO 3) | |
| Design and Airworthiness Requirements for Service Aircraft Volume 1 - Aeroplanes Book 2 (Parts 4 to 6 and Chapters 700 to 710) Part 4: Detail Design and Strength of Materials... | |
| Design and Airworthiness Requirements for Service Aircraft Volume 1 - Aeroplanes Book 3 (Chapters 711 on and Parts 8 to 10) | |
| Design and Airworthiness Requirements for Service Aircraft Volume 2 - Rotorcraft Book 1 (Parts 0 to 3) | |
| Design and Airworthiness Requirements for Service Aircraft Volume 2 - Rotorcraft Book 3 (Parts 7 to 10) Part 7: Installations | |
| DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICES AIRCRAFT VOLUME 1 - AEROPLANES BOOK 3 (CHAPTERS 711 ON AND PARTS 8 TO 10) PART 7: INSTALLATIONS | |
| Design Guide and Requirements for Equipment to Achieve a Low Magnetic Signature | |
| Design Guidelines for the Procurement of Dehumidifiers and Associated Equipment | |
| Design of Buildings Used for Electrical and Mechanical Metrology | |
| Design of High Voltage Electrical Power Systems for HM Ships, Submarines and The Royal Fleet Auxiliary | |
| DETAIL DESIGN AND STRENGTH OF MATERIALS | |
| Determination of the Smoke Index of the Products of Combustion from Small Specimens of Materials | |
| Determination of the Toxicity Index of the Products of Combustion from Small Specimens of Materials | |
| Diesel Engines for Marine Propulsion & Auxiliary Machinery | |
| Digital Video Distribution | |
| Electrical Indicating Instruments | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Ada Language Binding | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: C Language Binding | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: C++ Language Binding | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Concepts | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Definitions | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: ECOA Logical Interface | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: High Integrity Ada Language Binding | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Mechanisms | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Metamodel | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Platform Requirements | |
| European Component Oriented Architecture (ECOA) Collaboration Programme: Software Interface | |
| Examination of Machinery in HM Surface Ships on Completion of Contractors Sea Trials | |
| Final Electrical Inspections Part 1 Surface Ships | |
| Final Electrical Inspections Part 2 Submarines | |
| Flight Tests - Handling | |
| Flight Tests - Installations and Structures | |
| Fording and Flotation Requirements for Combat and Support Ground Vehicles | |
| Fuels, Lubricants and Associated Products | |
| Furniture and Associates Equipment Requirements for HM Ships | |
| Garbage Disposal in Surface Ships Part 1 General Requirements | |
| Gasoline System and Stowages | |
| General and Operational Requirements | |
| General Specification for Aircraft Gas Turbine Engines | |
| Glass Reinforced Plastic (GRP) Mouldings Part 1 A Guide to Methods for the Production of Hand Laid-Up GRP Mouldings | |
| Glass Reinforced Plastic (GRP) Mouldings Part 2: Quality Control Inspection Procedures and Acceptance Procedures for GRP Mouldings | |
| Glass Reinforced Plastic (GRP) Mouldings Part 3: A Guide to the Various Tests and Testing Methods for Evaluation of the Quality of GRP Mouldings | |
| GRP Ships & Boats Maintenance Survey & Repair (Cat 2) Part: 01 : Requirements for Survey, Report of Survey and Structural Safety Certification | |
| GRP Ships & Boats Maintenance Survey and Repair | |
| GRP Survey and Repair Requirements for HM Ships, Boats, Craft and Structures Part 2 Maintenance and Repair Requirements for GRP in Ships, Boats and Craft (Single Skin) | |
| GRP Survey and Repair Requirements for HM Ships, Boats, Craft and Structures Part 3 Maintenance and Repair Requirements for GRP (Sandwich Construction) | |
| Guidance for the Pre-Trial Inspections of Main and Auxiliary Machinery Installations and Systems in HM Surface Ships | |
| Guide for the Design of Auxiliary Machinery Seatings | |
| Guide to Cable Entry, Termination and Junction Components for Equipment | |
| Guide to Cables, Electrical and Associated Items Part 1 General | |
| Guide to Cables, Electrical and Associated Items Part 10 Terminations and Connectors | |
| Guide to Cables, Electrical and Associated Items Part 11 Glands, Grommets and Deck Tubes | |
| Guide to Cables, Electrical and Associated Items Part 12: Index to NATO Stock Numbers and Cables Manufacturing Specifications for Cables Listed in Parts 2-8 | |
| Guide to Cables, Electrical and Associated Items Part 13: Cables (Imperial) Nearest Metric Equivalents | |
| Guide to Cables, Electrical and Associated Items Part 2 Cables, Electrical, Silicone Rubber Insulated, Limited Fire Hazard or Chlorosulphonated Polyethylene sheathed for General Service | |
| Guide to Cables, Electrical and Associated Items Part 5 Cables, Electrical, Radio Frequency | |
| Guide to Cables, Electrical and Associated Items Part 6 Cables, Electrical, Miniature, Sub- Miniature and Equipment Wires | |
| GUIDE TO CLOSED CIRCUIT TELEVISION SURVEILLANCE EQUIPMENT | |
| Guide to Design and User Requirements of Internal Communications Systems Part 1 Surface Ships | |
| Guide to Design of AF250 Series Main Broadxast Systems | |
| Guide to Design of Closed Circuit Television and Surveillance Systems | |
| Guide to Design Procedures for Versatile Console Systems | |
| Guide to Internal Communication Equipment - Cord and Cordage | |
| Guide to Internal Communication Equipment - Loudspeakers & Associated Items Part 2: Range of Loudspeakers & Associated Items | |
| Guide to Internal Communication Equipment - Microphones and Associated Items | |
| Guide to Internal Communication Equipment - Plugs, Sockets and Socket Boxes | |
| Guide to Internal Communication Equipment - Sound Powered Telephone Assemblies and Associated Items (Excluding Exchange Telephone Equipment) | |
| Guide to Internal Communication Equipment Main Broadcast and Associated Items | |
| Guide to Internal Communication Equipment, Non-VCS Units (RICE 1, CCII and SINBAD) | |
| Guide to Internal Communications Equipment - Handsets and Associated Items | |
| Guide to Internal Communications Equipment - Loudspeaker & Associated Items Part 1: Selection and Siting of Loudspeakers | |
| Guide to Lightning Protection in HM Surface Ships | |
| Guide to Managing Obsolescence | |
| Guide to Selection of Sensors for Measurment of System Parameters Part 1 Selection of Liquid Level, Temperature and Pressure Sensors | |
| Guide to Selection of Sensors for Measurment of System Parameters Part 4 Selection of Flow Sensors | |
| Guide to Sound Reproduction Equipment | |
| Guide to the Completion of Form DGSF 129-Shore Support Requirements for Warships | |
| Guide to the Design and Manufacture of Awnings and Associated Screens and Covers | |
| Guide to the Design of Ferro-magnetic Signature Control Systems and Degaussing | |
| Guide to the Design of Sound Reproduction Equipment and Public Address Systems Part 2 Guide to Design of Public Address Systems | |
| Guide to the Design, Corrosion Assessment and Stress Analysis of Steam Systems Pipework | |
| Guide to the Installation of Thin-Wall Insulated, Limited Fire Hazard Equipment Wire and Electric Cable | |
| Guide to the Internal Communication Equipment Headsets and Associated Items Including Microphones and Receiver Insets | |
| Guide to the Selection of Cable Glands in Submarines Part 1 Pressure Hull Glands | |
| Guide to the Selection of Cable Glands in Submarines Part 2 Pressure Equipment and Disc Seal Glands | |
| Guide to the Selection of Cable Glands in Submarines Part 3 Bulkhead Penetrators and Gland Tubes | |
| Guide to the Selection of Hand Crimping Tools | |
| Guide to the Selection of Heating and Thermostatic Components | |
| Guide to the Selection of Small Commercial Electrical Fittings and Components | |
| Guide to the Selection of Small Electrical Fittings and Components | |
| Guide to Training and Recreational Television Equipment | |
| Guide to Versatile Console System Units | |
| HAZOP Studies on Systems Containing Programmable Electronics Part 1 Requirements | |
| HAZOP Studies on Systems Containing Programmable Electronics Part 2 General Application Guidance | |
| Installations Chapter 711 on | |
| Integrated Logistic Support Guide to the Application of LSA and LSAR | |
| Integrated Logistic Support Part 0: Application of Integrated Logistic Support (ILS) | |
| Integrated Logistic Support Part 10: Electronic Documentation | |
| Integrated Logistic Support Part 1: Logistic Support Analysis (LSA) and Logistic Support Analysis Record (LSAR) | |
| Integrated Logistic Support Part 20: Application of Integrated Supply Support Processes | |
| Integrated Logistic Support Part 21: Procedures for Initial Provisioning | |
| Integrated Logistic Support Part 23: Procedures for Procurement Planning | |
| Integrated Logistic Support Part 24: Procedures for Order Administration | |
| Integrated Logistic Support Part 25: Procedures for Invoicing | |
| Integrated Logistic Support Part 3: Guidance for Application Software Support | |
| Integrated Logistic Support Procedures for Codification | |
| Integrated Logistic Support Requirements for MOD projects Part: 03 : Logistic Information Requirements | |
| Integrated Logistic Support Requirements for MOD projects Part: 3 : Logistic Information Requirements | |
| Integrated Logistic Support. Requirements for MOD Projects | |
| Integrated Logistics Support requirements for MOD projects Part: 01 : Integrated Logistics Support (ILS) Requirements | |
| Integrated Logistics Support requirements for MOD projects Part: 02 : MOD Requirements for a Supportability Case | |
| Integrated Logistics Support requirements for MOD projects Part: 1 : Integrated Logistics Support (ILS) Requirements | |
| Integrated Logistics Support requirements for MOD projects Part: 2 : MOD Requirements for a Supportability Case | |
| List of Important Changes | |
| Lubrication Oil Systems for Propulsion and Generation in HM Surface Ships and Submarines | |
| Maintenance | |
| MARITIME SPECIFIC GUIDANCE | |
| Maritime Support Management Part 0: General Information for Type A and Type B Support | |
| Maritime Support Management Part 1: Spares Identification | |
| Maritime Support Management Part 2: Screening | |
| Maritime Support Management Part 3: Codification | |
| Maritime Support Management Part 4: Purchasing for Type A and Type B support | |
| Maritime Support Management Part 5: Documentation for Type A and Type B Support | |
| Maritime Support Management Part 6: Requirements for the Preparation of Ship System and Equipment List (SS & E List) | |
| Marking of Ammunition and Associated Packages Part 1 General | |
| Marking of Ammunition and Associated Packages Part 10 Projectiles | |
| Marking of Ammunition and Associated Packages Part 11 Pyrotechnics | |
| Marking of Ammunition and Associated Packages Part 12 Free Flight Rockets and Rocket Motors | |
| Marking of Ammunition and Associated Packages Part 13 Small Arms Ammunition (Below 20mm) | |
| Marking of Ammunition and Associated Packages Part 14 Underwater Weapons | |
| Marking of Ammunition and Associated Packages Part 15 Experimental Ammunition | |
| Marking of Ammunition and Associated Packages Part 16 International Projects | |
| Marking of Ammunition and Associated Packages Part 17 Bursters, Exploders, Pellets and Tracers | |
| Marking of Ammunition and Associated Packages Part 18 Detonators, Igniters, Igniters Cartridge, Primers and Tubes | |
| Marking of Ammunition and Associated Packages Part 19 Fuzes and Gaines | |
| Marking of Ammunition and Associated Packages Part 2 Bombs, Aircraft | |
| Marking of Ammunition and Associated Packages Part 20 Packaging | |
| Marking of Ammunition and Associated Packages Part 21 Munitions Containing Radioactive Material | |
| Marking of Ammunition and Associated Packages Part 3 Bombs, Mortar | |
| Marking of Ammunition and Associated Packages Part 4 Propelling Charges | |
| Marking of Ammunition and Associated Packages Part 5 Demolition Stores | |
| Marking of Ammunition and Associated Packages Part 6 Grenades | |
| Marking of Ammunition and Associated packages Part 7 Guided Missiles, Components and Parts | |
| Marking of Ammunition and Associated Packages Part 8 Mines (Other than Underwater Weapons) | |
| Marking of Ammunition and Associated Packages Part 9 Chemical Stores | |
| Metalic Materials Data Handbook | |
| Metallic Hose & Bellows | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 10: Air Traffic Control (ATC) Support Systems | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 11: Recording and Replay Systems | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 12: Alarm Handling Systems | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 13: Master Time Source Systems | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 1: Generic and Software | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 2: Communications | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 3: Surveillance | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 4: Navigation | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 5: Satellites | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 6: Meteorological | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 7: Flight Data Processing (FDP) Messaging | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 8: Airfield Ground Lighting (AGL) and Arrestor Systems | |
| Military Air Traffic Control Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Control) Part 9: Flight Inspection, Trials and Checking | |
| Military Air Traffic Services Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Services) Part 0: Procedures for Use, Content and Definitions | |
| Military Air Traffic Services Equipment Safety and Performance Standards (Aerodrome, Terminal and Naval Air Traffic Services) | |
| Minimum Non-Destructive Examination Acceptance Standards for Welds in HM Submarines and Surface Ships not in Class | |
| MOD Business Rules - Contracting for Technical Documentation Part: 01 : AIR S1000D Business Rules | |
| MOD Business Rules \x96 Contracting for Technical Documentation Part 03: LAND S1000D Business Rules | |
| MOD Business Rules \x96 Contracting for Technical Documentation Part: 02 : MARITIME S1000D Business Rules | |
| MOD Business Rules \x96 Contracting for Technical Documentation Part: 03 : LAND S1000D Business Rules | |
| MOD Business Rules \x96 Contracting for Technical Documentation Part: 04 : NON S1000D Business Rules | |
| MOD Business Rules \x96 Contracting for Technical Documentation Part: 04: NON S1000D Business Rules | |
| Non-Transportable High Pressure Gas Cylinders Periodic Inspection, Testing and Maintenance Part 1 Onshore Shop Testing of High Pressure Gas Cylinders | |
| Non-Transportable High Pressure Gas Cylinders Periodic Inspection, Testing and Maintenance Part 2 In-Situ On-Board Testing of High Pressure Gas Cylinders | |
| OIL AND BILGE WATER SHIPBOARD PROCESSING ARRANGEMENTS | |
| Oxygen Clean Standards (OX) Part 2: Low Pressure Electrolysers | |
| Oxygen Clean Standards (OX) Part 3 Liquid Oxygen (LOX) Plants | |
| Oxygen Clean Standards (OX) Part 4: Gaseous Oxygen (GOX) Compressers | |
| Packaging for Ammunition and Explosives | |
| Packaging | |
| Pipe Manipulation Part 05: Brazing | |
| Pipe Manipulation Part 1: Bending of Pipes | |
| Pipe Manipulation Part 3: Swaging | |
| Pipe Manipulation Part 5: Brazing | |
| Pipework Engineering Part 1: General | |
| Pipework Engineering Part 3 PYPLOCK Fittings | |
| Pipework Engineering Part 4 Screwed Fittings | |
| Pipework Engineering Part 5: Requirements for Hp Fluid Connectors | |
| Policy Requirements and Design Guidance for Alarm and Warning Systems | |
| Preservation and Painting of Mechanical Machinery Items | |
| Protection of Seawater System Pipework and Heat Exchanger Tubes in HM Surface Ships and Submarines | |
| Quality Management Framework and Requirements for Materiel Safety in Submarines Part 2 - Quality Requirements | |
| Quality Management Framework and Requirements for Materiel Safety in Submarines | |
| Quality Requirements for Ensuring and Assuring Materiel Safety in Submarines Part 1 Defining Requirements during Design | |
| Requirement for Glass Reinforcing Fabrics for Ships, Boats and Craft Structures | |
| Requirement for Laundries and Associated Compartments Part 1 Laundries and Associated Compartments | |
| Requirement for Laundries and Associated Compartments Part 2 Laundry Machinery, Equipment and Fittings | |
| Requirements and Guidance for the Procurement of Pumps for Auxiliary Systems | |
| Requirements and Organization for the Management of Access to and Within Compartments (Surface Ships) | |
| Requirements for 70/30 Copper Nickel Alloy Material Part 2 Forgings, Forge Stock Rods and Sections | |
| Requirements for 70/30 Copper Nickel Alloy Material Part 3 Tubes | |
| Requirements for 90/10 Copper Nickel Alloy Material Part 3 Tubes | |
| Requirements for AC & DC Starting & Control Gear | |
| Requirements for AC and DC Motors | |
| Requirements for Accommodation in HM Ships | |
| Requirements for Adhesive for Mineral Wool Marine Board (MWMB) | |
| Requirements for Air Conditioning & Ventilation Part 3: Specification for Testing and Cleaning Ventilation Trunking | |
| Requirements for Air-Conditioning & Ventilation Part 1: HM Surface Ships and Royal Fleet Auxiliaries | |
| Requirements for Air-Conditioning and Ventilation Part: 03 : Specification for Testing and Cleaning Ventilation Trunking | |
| Requirements for Aircraft Starting and Servicing Cable Assemblies | |
| Requirements for Aluminium-Nickel-Sil icon-Brass Part 3: Tubes | |
| Requirements for Aviation Fuel Systems in HM Surface Ships | |
| Requirements for Bilge, Sullage & Drain Tank Systems for Surface Ships | |
| Requirements For Cable Glands in Bulkheads and Decks of Surface Ships | |
| REQUIREMENTS FOR CABLE, ELECTRIC Part 1 Pressure\x96Tight Ethylene Propylene Rubber (EPR) or Silicone Rubber Insulated, Chlorosulphonated Polyethylene (CSP) Limited Fire Hazard (LFH) Sheathed | |
| Requirements for Cables Electrical, Sub-Miniature and Small Multicore, Limited Fire Hazard for Special Purposes | |
| Requirements for Cables, Electric Fire Survival, High Temperature Zones and Limited Fire Hazard Sheathed | |
| Requirements for Cables, Electric Part 2 Polyolefin Insulated | |
| Requirements for Cables, Electric Part 3 Co-Axial | |
| Requirements for Cables, Electric Part 4 Fluorinated Material Insulated | |
| Requirements for Cables, Electric Part 5 Miscellaneous | |
| Requirements for Cables, Electrical Rubber Insulated, Limited Fire Hazard Sheathed for General Services | |
| Requirements for Catering Equipment NOTE This Standard is Prisional If you have Difficulty with its Application Please Advise the Directorate of Standardization | |
| Requirements for Cathodic Protection Part 2 Impressed Current Cathodic Protection System | |
| Requirements for Cathodic Protection | |
| Requirements for Centrifuges | |
| Requirements for Chemical Cleaning of Chilled Water Systems for HM Surface Ships, Submarines and Royal Fleet Auxiliary Vessels | |
| Requirements for Cleaning of Items, Components and Equipment for Fluid Systems Part 1 Cleaning | |
| Requirements for Cleanliness of Ships During Build | |
| Requirements for Compressed Air Purification Equipment | |
| Requirements for Configuration Management of Surface Ships | |
| Requirements for Configuration Management of Surface Warships | |
| Requirements for Deck Coverings Part 1 General Requirements | |
| Requirements for Deck Coverings Part 2 Deck Preparation and Laying Procedures | |
| Requirements for Deck Coverings Part: 02 : Deck Preparation and Laying Procedures | |
| Requirements for Decorative Linigs & Composite Bulkheads Part 1 Decorative Linings | |
| Requirements for Decorative Linigs & Composite Bulkheads Part 2 Composite Bulkheads | |
| Requirements for Decorative Linings and Composite Bulkheads | |
| Requirements for Degaussing Systems for Merchant Ships | |
| Requirements for Degaussing Systems in HM Surface Ships and Submarines | |
| Requirements for Design and Fitting Out of Workshops, Maintenance Spaces and Engineering Stores for HM Surface Ships Part 1: Common Requirements | |
| Requirements for Design and Fitting Out of Workshops, Maintenance Spaces and Engineering Stores for HM Surface Ships Part 2: Specific Requirements | |
| Requirements for Domestic Hot and Cold Fresh Water Systems | |
| Requirements for Elastomeric Toroidal Sealing Rings (\xb4O\xb4 Rings) Part 1 General and Surface Finish Standards Relative to Manufacturer | |
| Requirements for Elastomeric Toroidal Sealing Rings (\xb4O\xb4 Rings) Part 2 List of Preferred Elastomeric Toroidal Sealing Rings (\xb4O\xb4 Rings) | |
| Requirements for Elastomeric Toroidal Sealing Rings (\xb4O\xb4 Rings) Part 3 Anti-Extrusion Rings (Back Up Rings) | |
| Requirements for Electric Lighting Fittings | |
| Requirements for Electric Motors & Control Gear Associated with Domestic Workshops & Similar Machinery | |
| Requirements for Electrical Cables, Thin-Wall Insulated, Limited Fire Hazard | |
| Requirements for Electrical Installation Cabling Diagrams and Associated Data | |
| Requirements for Electrical Testing of Equipment | |
| Requirements for Emergency Breathing Systems (EBS) in Submarines | |
| Requirements for Feed, Steam and Drain Systems for Nuclear Submarine Propulsion and Generating Machinery | |
| Requirements for First Machinery Inspection and Official Basin Trial of Propulsion Machinery in HM Surface Ships | |
| Requirements for Fitting out of Offices (Excluding Operational/Communic ation Offices) in HM Surface Ships and Submarines Part 1 General Requirements | |
| Requirements for Fitting out of Offices (Excluding Operational/Communic ation Offices) in HM Surface Ships and Submarines Part 2 Specific Requirements HM Surface Ships | |
| Requirements for Fitting Out of Offices (Excluding Operational/Communic ation Offices) in HM Surface Ships and Submarines | |
| Requirements for Flexible Rubber Pipe Assemblies and Bellows for use in Systems from vacuum to 10 Bar | |
| Requirements for Galleys & Associated Spaces Part 3 Specific Requirements for conventional Submarines | |
| Requirements for Galleys and Associated Spaces Part 1 Common Requirements | |
| Requirements for Galleys and Associated Spaces Part 2 Specific Requirements for HM Surface Ships | |
| Requirements for Galleys and Associated Spaces Part 4 Specific Requirements for Nuclear Submarines | |
| Requirements for Galleys and Associated Spaces Part: 02 : Specific Requirement for HM Surface Ships | |
| REQUIREMENTS FOR GAS TURBINES | |
| Requirements for Gaseous Fire Fighting Systems for Machinery Compartments in Surface Ships Part 1 Carbon Dioxide Systems | |
| Requirements for Gaseous Fire Fighting Systems for Machinery Compartments in Surface Ships Part: 01: General Requirements for Carbon Dioxide Systems | |
| Requirements for Gaseous Firefighting Systems for Main and Auxiliary Machinery Spaces on Surface Ships Part 4 General Requirements for Inert Gas Systems Including Electric/Electronic Spaces | |
| Requirements for Gaseous Firefighting Systems for Main and Auxiliary Machinery Spaces on Surface Ships Part: 04: General Requirements for Inert Gas Systems including Electric/Electronic Spaces | |
| Requirements for Gaseous Firefighting Systems for Main Machinery Spaces and Compartments of Surface Ships Part 3 BCF (Halon 1211) System | |
| Requirements for Gearing - Main Propulsion | |
| Requirements for General Application to Rotating Electrical Machinery | |
| Requirements for Health Physics Laboratories and Radiation Facilities in Nuclear Submarines | |
| Requirements for Heat Exchangers for HM Surface Ships and Submarines | |
| Requirements for Hydraulic Systems Part 1 General | |
| Requirements for Life Saving Equipment | |
| Requirements for Lighting Systems Part 1: Surface Ships | |
| Requirements for Lighting Systems Part 2: Submarines | |
| REQUIREMENTS FOR LIGHTING SYSTEMS Part 3 NIGHT VISION DEVICE (NVD) COMPATIBILITY | |
| Requirements for Limited Fire Hazard (LFH) Sheathing for Electric Cables | |
| Requirements for Lockers (Magazine, RU Magazine and Detonator) Used for Storage of Explosive Stores in HM Surface Ships and Submarines | |
| Requirements for Main and Distribution Switchgear | |
| Requirements for Main DC Generators | |
| REQUIREMENTS FOR MAIN PROPULSION PLANT CONDENSERS IN NUCLEAR POWERED SUBMARINES | |
| Requirements for Maintenance Envelopes and Removal Routes Part 1 Surface Ships | |
| Requirements for Marker Plates | |
| Requirements for Mechanical Handling Part 1 Basic Principles of Design | |
| Requirements for Mechanical Handling Part 7: Lever Hoists | |
| Requirements for Mechanical Handling Part 8 Davits & Derricks | |
| Requirements for Mechanical Handling | |
| Requirements for Medical & Dental Organization in HM Surface Ships and Submarines Part 01: Common Requirements - Medical & Dental Facilities | |
| Requirements for Medical & Dental Organization in HM Surface Ships and Submarines Part 04: Medical and Dental Facilities in Submarines | |
| Requirements for Medical & Dental Organization in HM Surface Ships and Submarines Part 2 Specific Requirements - Medical and Dental Facilities in HM Surface Ships | |
| Requirements for Medical & Dental Organization in HM Surface Ships and Submarines | |
| Requirements for Medical and Dental Organization in HM Surface Ships and Submarines Part 1: Common Requirements - Medical and Dental Facilities | |
| Requirements for Medical and Dental Organization in HM Surface Ships and Submarines Part 3: Specific Requirements - Medical Organization for Action in HM Surface Ships | |
| Requirements for Medical and Dental Organization in HM Surface Ships and Submarines Part 4: Medical and Dental Facilities in Submarines | |
| Requirements for Motor Generators & Associated Control Gear | |
| Requirements for NAAFI Compartments in HM Surface Ships and Submarines | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part 1 Nickel Aluminium Bronze Naval Alloy Centrifugally Cast | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part 2: Nickel Aluminium Bronze Naval Alloy Ingots and Sand Castings with Welding Permitted to the Wetted Surface | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part 3 Nickel Aluminium Bronze Commercial Alloy Ingots and Sand Castings | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part 4: Nickel Aluminium Bronze Naval Alloy Sand Castings with Welding Restricted to the Non-Wetted Surface (Class I and II Castings Only)... | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part: 01 : Nickel Aluminium Bronze Naval Alloy Centrifugally Cast | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part: 02: Nickel Aluminium Bronze Naval Alloy Ingots and Sand Casting with Welding Permitted to the Wetted Surface | |
| Requirements for Nickel Aluminium Bronze Castings and Ingots Part: 04 : Nickel Aluminium Bronze Naval Alloy Sand castings with Welding Restricted to the NonWetted Surface (Class I and II Castings... | |
| Requirements for Nickel-Aluminium-Sil icon-Brass Part 1 Sheet, Strip & Plate | |
| Requirements for Non-Destructive Examination Methods in HM Submarines and Surface Ships not in Class Part 2 Magnetic Particle | |
| Requirements for Non-Destructive Examination Methods in HM Submarines and Surface Ships not in Class Part 3 Eddy Current | |
| Requirements for Non-Destructive Examination Methods Part 02: Magnetic Particle | |
| Requirements for Non-Destructive Examination Methods Part 03: Eddy Current | |
| Requirements for Non-Destructive Examination Methods Part 04: Liquid Penetrant | |
| Requirements for Non-Destructive Examination Methods Part 1: Radiographic | |
| Requirements for Non-Destructive Examination Methods Part 4: Liquid Penetration | |
| Requirements for Non-Destructive Examination Methods Part 5: Ultrasonic | |
| Requirements for Non-Destructive Examination Methods Part: 01 : Radiographic | |
| Requirements for Non-Destructive Examination Methods Part: 05 : Ultrasonic | |
| Requirements For Non-Transportable High Pressure Gas Cylinders Part 4 - Installation In HM Surface Ships And Submarines | |
| Requirements for Non-Transportable Pressure Vessels for the Storage of High Pressure Gases Part 1 Design Requirements | |
| Requirements for Non-Transportable Pressure Vessels for the Storage of High Pressure Gases Part 2 Manufacture, Inspection and Testing | |
| Requirements for Non-Transportable Pressure Vessels for the Storage of High Pressure Gases Part 3 Storage Requirements | |
| Requirements for Polyester Roundslings, Protection Sleeves and Associated Metal Fittings | |
| Requirements for Polyvinyl Chloride (PVC) Coated Lead Ballast Blocks | |
| Requirements for Preparation of Drawings for Rotating Electrical Machinery | |
| Requirements for Q1 (Navy) Quality Steel Part 01: Plates | |
| Requirements for Q1 (Navy) Quality Steel Part 02: Forgings | |
| Requirements for Q1 (Navy) Quality Steel Part 1 Plates | |
| Requirements for Q1 (Navy) Quality Steel Part 2: Forgings | |
| Requirements for Q1 (Navy) Quality Steel Part 3: Castings | |
| Requirements for Q1 (Navy) Quality Steel Part 4 Rolled Sections | |
| Requirements for Q1 (Navy) Quality Steel Part 6 Ultrasonic Acceptance Standards for Q1 (Navy) and Similar Quality Steel Plate | |
| Requirements for Resin for use in Ships, Boats, Craft and Craft Structures | |
| Requirements for Safety Signs and Colours | |
| Requirements for Sewage and Grey-Water Systems for Surface Ships | |
| Requirements for Sewage Plant and Ancillary Equipment in HM Surface Ships and Submarines | |
| Requirements for Shielding Materials for Nuclear Purposes (Cat 2) Part 01: Cast Lead & Steel Plate Assemblies | |
| Requirements for Shielding Materials for Nuclear Purposes (Cat 2) Part 02: Lead Slabs, Sheet, Filler Rods and Wool | |
| Requirements for Shielding Materials for Nuclear Purposes (Cat 2) Part 03: Solder | |
| Requirements for Shielding Materials for Nuclear Purposes (Cat 2) Part 04: Low Density Polythene Sheeting | |
| Requirements for Soft Furnishings and Upholstery Fabrics | |
| Requirements for Spring Interior Mattresses for use in Surface Ships and Submarines | |
| Requirements for Static Conversion Equipment for Power Services | |
| Requirements for Steering and Stabilizer Systems for HM Surface Ships and Royal Fleet Auxiliaries | |
| Requirements for Stores Compartments in HM Surface Ships and Submarines Part 1 General Requirements | |
| Requirements for Stores Compartments in HM Surface Ships and Submarines Part 2 Specific Requirements - HM Surface Ships | |
| Requirements for Stores Compartments in HM Surface Ships and Submarines Part 3 Specific Requirements HM Submarines | |
| Requirements for Stores Compartments in HM Surface Ships and Submarines Part: 03 : Specific Requirements - HM Submarines | |
| Requirements for Strainers in HM Surface Ships and Submarines | |
| Requirements for Structural and Equipment Exposure to Noise and Vibration Propeller Aeroplanes; Leaflet 66 | |
| Requirements for Surface Ships in Long Term Preservation - Protection of Shafts & Bearings | |
| Requirements for Testing of Rotating Electrical Machinery | |
| Requirements for the Application of Reliability-Centred Maintenance Techniques to HM Ships, Submarines, Royal Fleet Auxiliaries and Other Naval Auxiliary Vessels | |
| Requirements for the Construction, Fitting out and Testing of Refrigeration Spaces in HM Surface Ships and Submarines | |
| Requirements for the Design and Installation of Fuel Systems for Gas Turbine Engines and Diesel Engines in HM Surface Ships and Submarines | |
| Requirements for the Design and Testing of Submarine Main Battery Ventilation Systems | |
| Requirements for the Design of Automatic Time Division Multiplex Telephone Exchange Systems | |
| Requirements for the Fabrication, Joining and Repair of Aluminium Alloy Structures and Associated Components | |
| Requirements for the Forging and Heat Treatment of Main Propulsion Gears | |
| Requirements for the Installation of Degaussing Systems in HM Surface Ships and Submarines | |
| Requirements for the Manufacture, Test and Identification for Items of Smiths Work | |
| Requirements for the Manufacturer Test and Installation of Guard Stanchions, Rails and Associated Safety Fittings Part 1 Weather Decks | |
| Requirements for the Master Decor Scheme of Accommodation Areas in Surface Ships and Submarines | |
| Requirements for the Policy, Design and Installation of Fire Detection Systems in Ships | |
| Requirements for the Preparation of Technical Publications Part 2 Weapon Equipment Installation Specifications | |
| Requirements for The Preparation, Identification and Management of Datum Pack Drawings and Photographs for S and T Nuclear Submarines | |
| Requirements for the Preparation, Identification and Management of Datum Pack Drawings and Photographs for Swiftsure, Trafalgar & Vanguard Class Nuclear Submarines | |
| Requirements for the Procurement Storage and Use of Timber | |
| Requirements for the Publication of Technical Publications Part 4: Ship NBCD Class Books and Ship Stability and Survivability Books | |
| Requirements for the Selection and Approval of Electrical and Electronic Components Part 1: Method of Selection and Approval | |
| Requirements for the Watertight Integrity of HM Submarines | |
| Requirements for the Welding and Fabrication of High Strength Steels Part 01: General | |
| Requirements for the Welding and Fabrication of High Strength Steels Part 1: General | |
| Requirements for Transformers for Power Services | |
| Requirements for Urethane Foam Components for Mattresses, Cushions and Upholstery | |
| Requirements for Water Closets, Urinals, Bathrooms and Washing Facilities in HM Surface Ships and Submarines | |
| Requirements for Weldable Structural Steels Part 4: \xb4BX\xb4 Quality Steel-Plates | |
| Requirements for Windows and Window Wipers for HM Surface Ships | |
| Requirements for Winterization of HM Surface Ships | |
| Requirements for Workshop Equipment | |
| Rubber Flexible Pipes and Bellows for Use in Submarines | |
| Safety Management Requirements for Defence Systems Part 1 Requirements | |
| Safety Management Requirements for Defence Systems Part 2 Guidance on Establishing a Means of Complying with Part 1 THIS GUIDANCE IS NOT MANDATORY | |
| Sea Water Systems for HM Surface Ships | |
| Second Machinery Inspection and Contractors Sea Trials of Propulsion Machinery in HM Surface Ships | |
| Selection of Torsionmeter Systems | |
| Shafting Systems & Propulsors Part 03: Manufacturing and Detail Design Requirements for Propulsors | |
| Shafting Systems & Propulsors Part 1 - Design Requirements for Main Propulsion Shafting | |
| Shafting Systems & Propulsors Part 6 - Requirements for Repair of Main Propulsion Shafting (Submarines) | |
| Shafting Systems and Propulsors Part 2 Design Requirements for Main Propulsion Shafting Auxiliaries | |
| Shafting Systems and Propulsors Part 3 Manufacturing and Detail Design Requirements for Propulsors | |
| Shafting Systems and Propulsors Part 4 Requirements for Repair of Main Propulsion Shafting | |
| Shafting Systems and Propulsors Part 5 Requirements for Handling, Maintenance and Repair of Propellers for HM Surface Ships | |
| Solar Heat Reflectance Requirements of Paints for Military Equipment | |
| Spares for Type 'A' Support | |
| Stability Criteria for Surface Ships Part 1 Conventional Ships | |
| Stability Standards for Surface Ships Part: 01 : Conventional Ships | |
| Standard Serviceability Testing Part 1: The Process for the Preparation of and Requirements and Guidance for, A Standard Serviceability Test Specification | |
| Standard Valves - Imperial | |
| Steel Specifications (Group System) | |
| Structural Strength and Design for Flight | |
| Structural Strength and Design for Operation on Specified Surfaces | |
| TacISDN | |
| Technology Insertion Part 1 - Vocabulary | |
| Thermal and Acoustic Insulation of Hull and Machinery | |
| Thermometers, Liquid in Glass Expansion Type and Thermometer Pockets | |
| Third Machinery Inspection, Final Machinery Trial and Demonstration of Propulsion Machinery in HM Surface Ships | |
| Trials and Inspection of Desalination Machinery | |
| Unit loads of Ammunition for Military use | |
| Valve Design and Manufacture | |
| Valve Rod Gearing | |
| VCS Engineering Manual | |
| Vetronics Infrastructure for Video Over Ethernet - Guidance | |
| Vetronics Infrastructure for Video Over Ethernet - Standards and Protocols | |
| Waste Disposal Policy | |
| Welding and Fabrication of High Strength Steels Part 02: Approval of Welding Procedures for Submarine Construction and Upkeep | |
| Welding and Fabrication of High Strength Steels Part 2 Approval of Welding Procedures for Submarine Construction and Upkeep | |
| Welding and Fabrication of Pipework, Machinery and Engineering Components for HM Submarines and Surface Ships not in Class | |
| Welding and Fabrication of Ship\xb4s Structure |
| << Prev | Next >> |