Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
150
200
250
300
350
400
450
460
470
480
490
500
510
511
512
513
514
515
516
517
518
519
520
521
522
530
540
550
560
570
580
600
650
700
750
800
850
1000
1500
1620
| Product Name | Notes |
|---|---|
| "SHOULD COST" GOAL ACHIEVEMENT REPORT | |
| 90-DAY PROJECTION REPORT - EQUIPMENT SCHEDULES AND ALLOCATIONS | |
| ABSTRACT OF NEW TECHNOLOGY (ANT) | |
| ADPE SYSTEMS CONFIGURATION REPORT (SCHEMATICS) | |
| AEROSPACE GROUND EQUIPMENT PLAN | |
| AGENDA - DESIGN REVIEWS, CONFIGURATION AUDITS AND DEMONSTRATIONS | |
| AGENDA-REPORT FOR PRODUCTION PROGRESS CONFERENCES | |
| Applications, performance characteristics and environmental benefits of alkali-activated binder concretes | |
| APPLICATIONS/PROGRAM S/INDENTURE (API) DATA | |
| AS BUILT CONFIGURATION LIST (ABCL) | |
| ASSESSMENT OF TIMBER STRUCTURES | |
| AUTHORIZATION CHANGE REQUEST | |
| AUTOMATED MANAGEMENT CONTROL SYSTEM/SUPPLY SUPPORT (AMCS/SS) | |
| BASELINE DESCRIPTION DOCUMENT | |
| BR135: Annex B Performance criteria and classification method for BS 8414-2:2005 | |
| BRIEFING CHARTS | |
| CERTIFICATE OF SERVICES | |
| CHART, MILESTONE | |
| CLASSIFIED PROCESSING EQUIPMENT INVENTORY | |
| COMMERCIAL DRAWINGS | |
| COMMERCIAL TRAVEL OFFICE (CTO) BACKUP BILLING INPUT FILE | |
| COMMERCIAL TRAVEL OFFICE (CTO) BACKUP BILLING REPORT | |
| COMMERCIAL TRAVEL OFFICE (CTO) OBLIGATION INPUT FILE | |
| COMMERCIALLY AVAILABLE COMPUTER DATA | |
| COMMUNICATIONS STATUS REPORTING | |
| COMMUNICATIONS-COMPU TER SYSTEMS REQUIREMENTS BOARD (CSRB) MINUTES | |
| COMPETITIVE SUBCONTRACTS REPORT (CSR) | |
| COMPLETE MOTION PICTURE FILM REPORTS | |
| Computer Software Flowchart | |
| COMPUTER SOFTWARE PRODUCT END ITEMS | |
| COMPUTER SOFTWARE PROJECT PLANNING CHART | |
| COMPUTER/MACHINE PRODUCTS (SPECIAL) | |
| CONCEPTUAL AND DEVELOPMENTAL DESIGN DRAWINGS | |
| CONCRETE STRUCTURE MANAGEMENT Owners\x92 guide to good practice | |
| CONFERENCE AGENDA | |
| CONFERENCE MINUTES | |
| CONFERENCE REPORT | |
| CONFERENCE REPORTS | |
| CONFIGURATION AUDIT PLAN | |
| CONFIGURATION AUDIT SUMMARY REPORT | |
| CONFIGURATION CHANGE CONTROL DATA INFORMATION PACKET | |
| CONFIGURATION DATA LISTS (CDLS) | |
| CONFIGURATION ITEM (CI) DOCUMENTATION RECOMMENDATION | |
| CONFIGURATION MANAGEMENT ACTION ITEM STATUS DATA INFORMATION PACKET | |
| CONFIGURATION MANAGEMENT DATA INTERFACE TRANSACTIONS DATA INFORMATION PACKETS (DIPS) | |
| CONFIGURATION MANAGEMENT PLAN | |
| CONFIGURATION STATUS ACCOUNTING INFORMATION | |
| Conservation and cleaning of masonry Part 1: Stonework | |
| Conservation and cleaning of masonry Part 2: Brickwork, blockwork and terracotta | |
| CONSERVATION AND CLEANING OF MASONRY Part 3: Renders, plasters and stucco | |
| CONTRACT CHANGE PROPOSAL (CCP) | |
| CONTRACT CHANGE PROPOSAL/TASK CHANGE PROPOSAL | |
| CONTRACT CHANGE PROPOSALS (CCPS) | |
| CONTRACT DATA DELIVERY SCHEDULE | |
| CONTRACT DATA MANAGEMENT PLAN | |
| CONTRACT SUMMARY REPORT | |
| CONTRACT TASK PLAN | |
| CONTRACT WORK BREAKDOWN STRUCTURE | |
| CONTRACTOR DEVELOPED SPECIFICATIONS | |
| CONTRACTOR ENGINEERING AND TECHNICAL SERVICES (CETS) PLAN | |
| CONTRACTOR ENGINEERING TECHNICAL SERVICES (CETS) PLAN | |
| CONTRACTOR MANPOWER REPORT | |
| CONTRACTOR NOTIFICATION OF CHANGES TO COMMERCIAL EQUIPMENT AND SOFTWARE | |
| CONTRACTOR'S CONFIGURATION MANAGEMENT PLAN | |
| CONTRACTOR'S STANDARD OPERATING PROCEDURES | |
| Corrosion of steel in concrete: a review of the effect of humidity | |
| COST ALLOCATION REPORT | |
| COURSE CONDUCT INFORMATION PACKAGE | |
| DAILY OPERATING LOG | |
| DATA ACCESSION LIST/INTERNAL DATA | |
| DATA ITEM DESCRIPTION, DD FORM 1664, PREPARATION INSTRUCTIONS FOR | |
| DATA PROCESSING UTILIZATION | |
| Defects in Cast Iron: Gray Iron Solidification Contraction | |
| DEFICIENCY REPORT (DR) | |
| Dehumidifiers | |
| DEPOT MAINTENANCE PRODUCTION REPORT | |
| Design Guide/Guideline Package | |
| Design Handbook - Application & Setting of Substation LVAC Supply Equipment | |
| Design Handbook - Application Guidance for The Use of Disconnector Auxiliary Contacts In Protection Schemes | |
| Design Handbook - Application Guidance Notes for The New Build & Asset Replacement of Transmission System Protection and Control Equipment | |
| Design Handbook - Application Guidance Notes for The Provision or Modifications of A Substation Control System | |
| Design Handbook - Application Guidance Notes for Traction Supply Protection and Control Equipment | |
| Design Handbook - Design Assurance Generic Resource Estimates for Substation Projects | |
| Design Handbook - Digital Engineering | |
| Design Handbook - Direct and Indirect Tripping of Remote End Circuit Breakers | |
| Design Handbook - Electricity Substation Construction - The Re-use of Civil, Structural and Building Engineering Assets | |
| Design Handbook - Electricity Substation Construction 400kV and 275kV Gas Insulated Switchgear (GIS) and Air Insulated Switchgear (AIS) Substation Buildings | |
| Design Handbook - Electricity Substation Construction Civil, Structural and Building Engineering | |
| Design Handbook - Guidance for Design Assurance Engineers | |
| Design Handbook - Guidance on Application of Operational Tripping Schemes | |
| Design Handbook - Guidance on Grid Code Compliance Process for Design Assurance Engineers & Relay Settings Engineers | |
| Design Handbook - Guidance On Livelink Mars for Settings Engineer (Assurance) and Commissioning officer | |
| Design Handbook - Guidance On Livelink Mars for Settings Engineer (Verification) | |
| Design Handbook - Guidance On Policy Application & Setting of Feeder Backup Protection | |
| Design Handbook - Guidance On Policy Applications & Setting of Supergrid Transformer Backup Protection | |
| Design Handbook - Guidance On The Application of System Data for Protection Purposes | |
| Design Handbook - Guidance On The Design and Use of Temporary Scaffold Guards | |
| Design Handbook - Guidance On The Preparation & format of Setting Guidance Documents | |
| Design Handbook - Guidance On The Preparation of Settings for Distance Protection | |
| Design Handbook - Single Line and Key Line Diagrams | |
| Design Handbook - Standard Applications for Areva \x91K\x92 Series and Siemens (Ex Va Tech) Argus Multifunction Relays | |
| DESIGN TO COST DATA | |
| DESIGN-TO-COST REPORT (DTCR) | |
| DESIGN-TO-OPERATING SUPPORT COST (DTOSC) REPORT | |
| Designing roofs for climate change: Modifications to good practice guidance | |
| DEVELOPMENTS IN FIRE DETECTION AND FIRE ALARM SYSTEMS | |
| Diagnostic Lymph Node Pathology | |
| DOCUMENTATION HOLDINGS | |
| DOCUMENTATION STORAGE AND RETRIEVAL SYSTEM REPORT | |
| DOCUMENTS REQUIRED BY NATIONAL RANGES | |
| DOMESTIC SMOKE ALARMS | |
| DRAWINGS, SPECIFICATIONS, STANDARDS, SOFTWARE AND SOFTWARE SUPPORT DOCUMENTS DATA INFORMATION PACKET | |
| DRAWINGS, SPECIFICATIONS, STANDARDS, SOFTWARE AND | |
| DRYING DISTORTION OF TIMBER Guidance on selection, conditioning and handling | |
| EAM CARDS FOR ENGINEERING DOCUMENTATION | |
| EFFECTS OF CHEMICAL, PHYSICAL AND MECHANICAL PROCESSES ON CONCRETE | |
| ELECTRONIC TEST EQUIPMENT CAPABILITY REQUIREMENTS SUMMARY | |
| END ITEM (EI) PRODUCTION AND COMPONENT ITEM (C/I) CONSUMPTION REPAIR HISTORY DATA | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) ENDURANCE TEST FAILURE REPORTS | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) FACTORY TEST PLAN | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) FACTORY TEST PROCEDURES | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) FACTORY TEST REPORTS | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) PERFORMANCE VERIFICATION AND ENDURANCE TEST PLAN | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) PERFORMANCE VERIFICATION AND ENDURANCE TEST PROCEDURES | |
| ENERGY MONITORING AND CONTROL SYSTEMS (EMCS) PERFORMANCE VERIFICATION AND ENDURANCE TEST REPORTS | |
| ENGINEERING CHANGE PROPOSAL (ECP) | |
| ENGINEERING CHANGE PROPOSAL (SHORT FORM) | |
| ENGINEERING CHANGE PROPOSAL | |
| ENGINEERING RELEASE RECORD (ERR) | |
| ENGINEERING SERVICES MEMORANDUM | |
| ENGINEERING SUPPORT DATA (ESD) | |
| EQUIPMENT FUNCTIONAL CRITERIA SPECIFICATION | |
| EQUIPMENT STATUS REPORT | |
| EQUIPMENT TECHNICAL DATA PACKAGE SPECIFICATION | |
| EVACUATION MODELLING AND HUMAN BEHAVIOUR IN FIRE | |
| External fire performance of roofs | |
| External timber structures Preservative treatment and durability | |
| FACILITY ACCREDITATION DOCUMENTATION | |
| FACILITY SECURITY PROFILE (FSP) | |
| Factory glazed windows. Part 1: Introduction and the glazing process | |
| Factory glazed windows. Part 2 : Transport, storage and installation | |
| Factory glazed windows | |
| FIELD CHANGE ORDERS | |
| FINAL REPORT | |
| Fire Doors | |
| FIRE ENGINEERING IN TUNNELS | |
| FIRE MODELLING WITH COMPUTATIONAL FLUID DYNAMICS | |
| Fire risk in high-rise and super high-rise buildings Prevention and mitigation | |
| FIXED GAS EXTINGUISHING SYSTEMS FOR FIRE PROTECTION | |
| FLOOD-RESILIENT BUILDING Part 1: Legislation, planning, flood-risk assessment and performance of buildings | |
| FLOOD-RESILIENT BUILDING Part 2: Building in flood-risk areas and designing flood-resilient buildings | |
| FORECASE, TARGET PRICE VS ACTUAL | |
| FUNDS EXPENDITURE CHART | |
| FUNDS EXPENDITURE REPORT | |
| GOVERNMENT FURNISHED MATERIAL (GFM) AND END ITEM TRANSACTION REPORTING SYSTEM (G009) | |
| GRAPHIC ILLUSTRATION CHART | |
| Guidelines for addressing climate change in standards | |
| HARDCORE FOR SUPPORTING GROUND FLOORS OF BUILDINGS - Part 1: Selecting and specifying materials & Part 2: Placing hardcore and the legacy of problem materials | |
| HARDCORE FOR SUPPORTING GROUND FLOORS OF BUILDINGS Part 1: Selecting and specifying materials | |
| HARDCORE FOR SUPPORTING GROUND FLOORS OF BUILDINGS Part 2: Placing hardcore and the legacy of problem materials | |
| HARDWARE DIAGNOSTIC TEST SYSTEM DEVELOPMENT PLAN | |
| Harmonized structure for MSS with guidance for use | |
| HOTLINE TELEPHONE REPORT | |
| IMPLEMENTATION MANAGEMENT PLAN/MINOR ACTIVITY MEMO/SAFETY ENGINEERING ANALYSIS | |
| INDUSTRIAL PREPAREDNESS PLANNING (IPP) DATA | |
| INDUSTRIAL PREPAREDNESS PLANNING (IPP) | |
| INFORMATION SYSTEMS ACCREDITATION DOCUMENTATION | |
| INHERENT TESTABILITY DESIGN & ASSESSMENT REPORT | |
| INHERENT TESTABILITY DESIGN AND ASSESSMENT REPORT | |
| INSTALLATION COMPLETION NOTIFICATION (ICN) | |
| INSTALLATION MENU BOARD MEETING MINUTES | |
| INSTALLATION PROGRESS REPORT | |
| INSTRUCTIONAL MEDIA PACKAGE | |
| INSTRUCTIONAL MEDIA REQUIREMENTS DOCUMENT | |
| INTEGRATED CIRCUIT TEST DOCUMENTATION | |
| INTERACTIVE COMPUTER AIDED PROVISIONING SYSTEM (ICAPS) DATA FILE EXCHANGE | |
| INTERACTIVE COURSEWARE (ICW) TERMINOLOGY DOCUMENT | |
| INTERFACE CONTROL DOCUMENT (ICD) | |
| INTERFACE CONTROL MANAGEMENT DATA REPORT | |
| INTERIM REPORT ON RESEARCH AND DEVELOPMENT | |
| JOINT SPECIAL ACCESS PROGRAM IMPLEMENTATION GUIDE (JSIG) SYSTEM AUTHORIZATION PACKAGE (SAP) | |
| LESSONS LEARNED FROM REAL FIRES | |
| LIST OF MODIFICATION WORK ORDERS | |
| LIST, CONTRACT DATA REQUIREMENTS (DD FORM 1423) | |
| LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT (S) | |
| LOGISTICS MANAGEMENT INFORMATION (LMI) SUMMARIES | |
| MACHINERY ALTERATION INSTRUCTIONS | |
| MAINTENANCE DATA RECORD | |
| MAINTENANCE PLAN, OPERATIONAL SYSTEM | |
| Making the most of renewable energy systems | |
| MAN HOURS EXPENDITURE CHART | |
| MANAGEMENT DATA REPORT | |
| MANAGEMENT PLAN | |
| Marine aggregates in concrete | |
| MARK AND MOD (OR EX AND MOD) NOMENCLATURE ASSIGNMENT REQUEST (NAR) | |
| MASTER EQUIPMENT SCHEDULE & ALLOCATIONS, SAMSO DOCUMENT 60-59 REPORT | |
| MASTER SCHEDULE | |
| Mechanical installation of roof-mounted photovoltaic systems | |
| MEETING AGENDA | |
| MEETING MINUTES | |
| MISSILE EQUIPMENT REQUIREMENT CHANGE REQUEST (SAMSO FORM 57) | |
| MISSILE LOG | |
| MODIFICATION COMPLETION/RESCISSIO N NOTIFICATION | |
| MODIFICATION WORK ORDER | |
| MODIFIED WOOD An introduction to products in UK construction | |
| MOTION PICTURE COVERAGE (FOOTAGE) | |
| MOTION PICTURE FILM CLIPS | |
| NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM MONITORING REPORTS | |
| NOTICE OF REVISION (NOR) | |
| NOTIFICATION OF CHANGES TO COMMERCIAL EQUIPMENT/COMPUTER SOFTWARE AND DOCUMENTATION | |
| Obtrusive light from proposed developments | |
| OIL AND HAZARDOUS MATERIAL SPILL PLANS | |
| OPERATIONAL BASELINE LISTING | |
| OPERATIONS SECURITY (OPSEC) PLAN | |
| ORDNANCE ALTERATION (ORDALT) INSTRUCTIONS | |
| PERIODIC PERT/TIME NETWORK AND ANALYSIS REPORT | |
| PERIODIC STATUS REPORT - STUDY/SERVICES CONTRACT | |
| PERT/TIME ANALYSIS REPORT | |
| PERT/TIME NETWORK DIAGRAM | |
| PHASED SUPPORT PLAN | |
| PHOTOGRAPHIC PLAN | |
| PHOTOGRAPHIC RECORDS OF EQUIPMENT | |
| PLATFORM OBJECT MODEL PACKAGE (POMP) | |
| PRESENTATION MATERIAL | |
| Principles of masonry conservation management | |
| PROBLEM ANALYSIS AND STATUS REPORT | |
| PRODUCT BASE LINE INDEX (PBLI) | |
| PRODUCT DRAWINGS | |
| PRODUCT/ASSET CONFIGURATION DATA INFORMATION PACKET | |
| PRODUCTION INSPECTION EQUIPMENT TEST SYSTEMS ENGINEERING DESIGN DATA | |
| PROGRAM MILESTONES (ACQUISITION PHASE) TYPE II | |
| PROGRAM MILESTONES (ACQUISITION PHASE) | |
| PROGRAM PLAN | |
| PROGRAM PROTECTION IMPLEMENTATION PLAN (PPIP) | |
| PROGRAM SCHEDULE | |
| PROGRESS REPORT (STUDIES) | |
| PROGRESS REPORT | |
| PROGRESS/STATUS MEETING REPORT | |
| PROJECT DEVELOPMENT BROCHURE | |
| PROJECT MANAGEMENT DATA INFORMATION PACKET | |
| PROJECT PLANNING/ACTUAL PROGRESS CHART (FIXED PRICE CONTRACTS) | |
| PROJECT PLANNING/ACTUAL PROGRESS CHART (OTHER THAN FIXED PRICE CONTRACTS) | |
| PROJECT STATUS REPORT (MANAGEMENT) | |
| PROJECT STATUS REPORT, COMPUTER SOFTWARE | |
| PROJECT STATUS REPORT | |
| PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION (PCMPD) | |
| PROPOSED CRITICAL MANUFACTURING PROCESSES | |
| PROVISIONING DATA COVER PAGE | |
| QUALITY ASSURANCE PROVISIONS | |
| QUALITY CONTROL AND ENVIRONMENTAL STATUS REPORT | |
| QUALITY ENGINEERING PLANNING LIST | |
| QUARTERLY ABSTRACT OF COMPUTER PROGRAMS | |
| R&D CONTRACT STATUS REPORT | |
| R&D STATUS REPORT | |
| REFERENCE DESIGNATION ASSIGNMENT PLAN | |
| Reference materials \x97 Selected terms and definitions AMENDMENT 1: Revisions of definitions for reference material and certified reference material | |
| Renewable energy sources How they work and what they deliver Part 1: Photovoltaics | |
| Renewable energy sources How they work and what they deliver Part 2: Wood fuels | |
| Renewable energy sources How they work and what they deliver Part 3: Electrically driven heat pumps | |
| Renewable energy sources How they work and what they deliver Part 4: Solar thermal hot water systems | |
| REPORT ON SUBCONTRACTING TO MINORITY BUSINESS ENTERPRISES | |
| REPORT, CONTRACTOR EMPLOYEE | |
| REPORT, GOVERNMENT FURNISHED INFORMATION DEFICIENCY | |
| REPORT, MAKE OR BUY ANALYSIS MAINTENANCE TRAINING EQUIPMENT | |
| REPORT, MATERIAL REQUIREMENTS/RECEIPT , MAINTENANCE TRAINING EQUIPMENT | |
| REPORT, PROGRESS, LETTER TYPE | |
| REPORT, RECORD OF MEETING/MINUTES | |
| REPORT, WEEKLY ACTION | |
| REQUEST FOR APPROVAL OF IDENTIFICATION PLATE DRAWINGS | |
| REQUEST FOR ASSIGNMENT OF NATIONAL STOCK NUMBER (NSN) | |
| REQUEST FOR ASSIGNMENT OF SERIAL NUMBER AND SERIAL NUMBER PREFIX LETTERS | |
| REQUEST FOR CONFIRMATION OF NOMENCLATURE | |
| REQUEST FOR DEVIATION (RFD) | |
| REQUEST FOR NOMENCLATURE (DD FORM 61) | |
| REQUEST FOR SERIAL NUMBER ASSIGNMENT FOR MARK AND MOD NOMENCLATURED EQUIPMENT | |
| REQUEST FOR SERIAL NUMBER ASSIGNMENT FOR MISSILE ALL-UP-AROUND (AUR) MISSION DESIGN SERIES (MDS) DESIGNATED ITEMS | |
| REQUEST FOR SERIAL NUMBER ASSIGNMENT FOR MISSILE ALL-UP-ROUND (AUR) MISSION DESIGN SERIES (MDS) DESIGNATED ITEMS | |
| REQUEST FOR WAIVER (RFW) | |
| RESIDENTIAL SPRINKLERS FOR FIRE PROTECTION Part 1: Introduction | |
| RESIDENTIAL SPRINKLERS FOR FIRE PROTECTION Part 2: Installation | |
| Residential sprinklers for fire protection | |
| REVISIONS TO EXISTING GOVERNMENT DOCUMENTS | |
| Safety considerations in designing roofs | |
| SCANNING/DIGITIZING DATA | |
| SCHEDULING LETTER FOR TECHNICAL PUBLICATIONS | |
| SECURITY AND THEATER CLEARANCE DATA | |
| Selecting lighting controls | |
| SLIDES 35 MM | |
| SOFTWARE CONFIGURATION CHANGE FORM | |
| SOFTWARE DELIVERY DOCUMENTATION | |
| SOFTWARE DEVELOPMENT PLAN | |
| SOFTWARE END-PRODUCT ACCEPTANCE PLAN | |
| SOURCE CONTROL DRAWING APPROVAL REQUEST | |
| SPECIAL INSPECTION EQUIPMENT CALIBRATION PROCEDURES | |
| SPECIAL INSPECTION EQUIPMENT DESCRIPTIVE DOCUMENTATION | |
| SPECIAL INSPECTION EQUIPMENT OPERATING INSTRUCTIONS | |
| SPECIAL OPTIONS | |
| SPECIAL TEST EQUIPMENT (STE) AND SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS | |
| SPECIFICATION CHANGE NOTICE (SCN) | |
| SPRINKLER SYSTEMS FOR FIRE PROTECTION OF COMMERCIAL AND INDUSTRIAL BUILDINGS | |
| STATUS OF FACILITIES CONTRACTS | |
| STILL PHOTO COVERAGE | |
| STILL PHOTOGRAPHIC RECORDS | |
| STILL PHOTOGRAPHS | |
| STRUCTURAL ASSESSMENT OF EXISTING LARGE PANEL SYSTEM (LPS) DWELLING BLOCKS FOR ACCIDENTAL LOADS | |
| Structural fire engineering design; Aspects of life safety | |
| Structural fire engineering design; Fire and thermal response | |
| Structural fire engineering design; Part 1. Materials behaviour \x96 concrete | |
| Structural fire engineering design; Part 2. Materials behaviour \x96 steel | |
| Structural fire engineering design; Part 3. Materials behaviour \x96 masonry | |
| Structural fire engineering design; Part 4. Materials behaviour - timber | |
| SUPPLEMENTAL DATA FOR PROVISIONING (SDFP) | |
| SUPPORT EQUIPMENT PLAN (SEP) | |
| SYSTEM/SEGMENT DESIGN DOCUMENT | |
| SYSTEM/SEGMENT INTERFACE CONTROL SPECIFICATION | |
| SYSTEM/SEGMENT SPECIFICATION | |
| TASK ASSIGNMENT PLAN | |
| TASK DEFINITIONS | |
| TASK ORDER | |
| TASK REPORTS | |
| TEARDOWN DEFICIENCY REPORT | |
| TECHNICAL AND COST PROPOSAL | |
| TECHNICAL AND FISCAL PROGRESS REPORT | |
| TECHNICAL DATA ASSESSMENT | |
| TECHNICAL DATA PACKAGE QUALITY CONTROL PROGRAM PLAN | |
| TECHNICAL DATA PACKAGE | |
| TECHNICAL PROGRESS REPORTS | |
| TECHNICAL REPORT - STUDY/SERVICES CONTRACT | |
| TEMPEST CONTROL OFFICER APPOINTMENT | |
| TEST DESIGN AND ASSESSMENT REPORT | |
| TEST PROGRAM SET (TPS) ACCEPTANCE TEST REPORT (ATR) | |
| TEST PROGRAM SET (TPS) AND OPERATIONAL TEST PROGRAM SET (OTPS) ACCEPTANCE TEST PROCEDURES (ATPS) | |
| TEST PROGRAM SET (TPS) INTEGRATION LOGBOOK | |
| TEST PROGRAM SET DOCUMENTATION (TPSD) | |
| TEST REQUIREMENTS DOCUMENT (TRD) | |
| TEST REQUIREMENTS DOCUMENT | |
| TESTABILITY PROGRAM PLAN | |
| TESTABILITY REQUIREMENTS ANALYSIS REPORT | |
| THEORY OF COMPLIANCE (TOC) | |
| THEORY OF EQUIPMENT OPERATION (TEO) | |
| TICKET AND TICKET REFUND REPORT | |
| TIMBER CLADDING | |
| Timber frame. A guide to the construction process | |
| Timber grading and scanning | |
| TIME COMPLIANCE TECHNICAL ORDER (TCTO) SUPPLY DATA | |
| TRACKING REPORT FOR EQUIPMENT MODIFICATION | |
| TRAINER/ WEAPON SYSTEM ENGINEERING CHANGE PROPOSAL SUMMARY REPORT | |
| TRAINING CONDUCT SUPPORT DOCUMENT | |
| TRAINING DEVICE SOFTWARE DEVELOPMENT PLAN (SDP) | |
| TRAINING EVALUATION DOCUMENT | |
| TRAINING SYSTEM SUPPORT DOCUMENT | |
| TRUSTED COMPUTING BASE CONFIGURATION MANAGEMENT PLAN | |
| UNIT UNDER TEST (UUT) INPUT/OUTPUT DESCRIPTION | |
| Using UK grown Douglas fir and larch timber for external cladding | |
| Using UK-grown Sitka spruce for exterior cladding | |
| VALIDATION REPORT | |
| WARRANTY STATUS REPORT | |
| Watermist systems for fire protection in domestic and residential buildings: an introduction | |
| WEAPONS SYSTEM PARAMETER WORKSHEET | |
| Wind loads on roof-based photovoltaic systems | |
| WIND MICROCLIMATE AROUND BUILDINGS | |
| WORK ASSIGNMENT ORDER COMPLETION NOTICE | |
| WORK BREAKDOWN STRUCTURE |
| << Prev | Next >> |