Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
500
1000
1050
1100
1150
1200
1250
1300
1310
1320
1330
1340
1350
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1370
1380
1390
1400
1410
1420
1450
1500
1550
1600
1620
| Product Name | Notes |
|---|---|
| "N", "NA", "NPT", & "NS" Certification Marks - N-Type Certificates - Certification & Accreditation Package - Required Code Books - BPVC IID, BPVC IIIA, BPVC III-NCA, BPVC V, BPVC IX,... | |
| "N", "NA", "NPT", & "NS" CERTIFICATION MARKS REQUIRED CODE BOOKS -ASME N-TYPE CERTIFICATES OF AUTHORIZATION AND CERTIFICATES OF ACCREDITATION: N - NA - NPT - NS PACKAGE - INCLUDES ASME... | |
| (N00X) EXPLOSIVES SAFETY POLICIES, PROCEDURES, AND REQUIREMENTS | |
| (N412) UNIFORM MATERIAL MOVEMENT AND ISSUE PRIORITY SYSTEM (UMMIPS) | |
| 1992 Accumulative Supplement to the BOCA National Building Code | |
| A Brief Comparison of Nema 250 - Enclosures for Electrical Equipment (1000 Volts Maximum) and IEC 60529 - Degrees of Protection Provided by Enclosures (IP Codes) | |
| A NEMA Whitepaper:ASHRAE 90.1-2016 Building Submetering Requirements | |
| Additive manufacturing - Feedstock materials - Methods to characterize metal powders | |
| Advanced Composites in Advanced Rocketry | |
| Advanced Finishing Techniques | |
| Advanced Rocketry Construction Techniques | |
| Aerospace series - Vacuum deposition of cadmium | |
| Air quality - Stationary sources emissions - Sampling and determination of gaseous ammonia content | |
| Aluminum Alloy Castings: Properties, Processes and Applications | |
| Aluminum Castings for Structural Applications | |
| Aluminum Permanent Mold Handbook | |
| Arc welding equipment - Part 10: Electromagnetic compatibility (EMC) requirements | |
| Arc welding equipment \x97 Part 1: Welding power sources | |
| Arc welding equipment \x97 Part 6: Limited duty equipment | |
| Assessment of existing structures in case of reconstruction and disapproval - Actions | |
| Assessment of existing structures in case of reconstruction and disapproval - Basic Rules | |
| Automatic forced draught burners for gaseous fuels | |
| Automotive fuels - Diesel - Requirements and test methods | |
| BAKERY MIXES, PREPARED | |
| Ballistic Resistance of Body Armor | |
| Ballistic Resistant Protective Materials | |
| BARLEY, PEARL | |
| Basic Stability Considerations for HPR | |
| Best Practices in Aluminum Castings | |
| Blinds and shutters - Thermal and visual comfort - Performance characteristics and classification | |
| BLOCK, BUTCHERS; AND TABLE, FOOD - PREPARATION | |
| BLOCK, FLOOR, WOOD, (HARDWOOD: SOLID, LAMINATED, SLAT) | |
| Blood Collection on Filter Paper for Newborn Screening Programs; Approved Standard | |
| BOCA National Building Code | |
| BOCA National Fire Prevention Code | |
| BOX, MICROSCOPE SLIDE, WOOD | |
| BOXES, FIBERBOARD, WOOD-CLEATED (FOR DOMESTIC SHIPMENT) | |
| BOXES, WOOD, NAILED AND LOCK-CORNER | |
| BOXES, WOOD-CLEATED-PLYWOOD , FOR DOMESTIC SHIPMENT | |
| Burglary resisting building hardware - Classification, requirements and test methods | |
| Casting Copper-Base Alloys | |
| CEREAL, ROLLED OATS | |
| CEREALS, (BREAKFAST; PREPARED, READY-TO-EAT) | |
| CEREALS, WHEAT | |
| Clean Rooms and Work Stations for the Microbially Controlled Environment | |
| Cleanroom technology - Biocontamination control - Part 3: Methods of analyzing and measuring biocontamination of surface in zones at risk | |
| Clustering Advanced Rockets | |
| Code national de construction des b\xe2timents agricoles \x97 Canada 1995 | |
| Code national de l'\xe9nergie pour les b\xe2timents \x96 Canada 2011 | |
| Code national de l'\xe9nergie pour les b\xe2timents \x96 Canada 2015 | |
| Code national de pr\xe9vention des incendies \x96 Canada 2005 | |
| Code national du b\xe2timent \x96 Canada 2005 Volume 1 | |
| Composite & Reloadable Motor Introduction | |
| Computer Numerical Control Formatting for Drillers and Routers | |
| Condition assessment built environment - Part 1: Methodology | |
| Condition assessment of building and installation components - Part 2: Lists of faults | |
| Condition assessment of building and installation components | |
| Condition monitoring and diagnostics of machines - Vibration condition monitoring - Part 2: Processing, analysis and presentation of vibration data | |
| CONTRACTOR METRICS HANDBOOK | |
| CORN MEAL (REGULAR AND DEGERMED) | |
| DOWELS, WOOD | |
| Drain and sewer systems outside buildings - Sewer system management | |
| Dried Blood Spot Specimen Collection for Newborn Screening | |
| Driver License Cards - Identification Cards | |
| Dutch edition based on NEN-EN 12186 and NEN-EN 12279 - Gas supply systems \x96 Gas pressure regulating stations for transmission and distribution | |
| Electrical Inspection Manual with Checklist | |
| Electrical installations for low-voltage \x96 Dutch implementation of the HD-IEC 60364 series | |
| Electrical Launch Systems | |
| ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL (EEE) PARTS MANAGEMENT AND CONTROL REQUIREMENTS FOR NASA SPACE FLIGHT PROGRAMS | |
| Electromagnetic compatibility immunity requirements for telecommunication terminal equipment | |
| Electronic Payloads | |
| Electrostatics - Part 5-1: Protection of electronic devices from electrostatic phenomena - General requirements | |
| Environment and food - Performance characteristics of measurement methods | |
| Environment, food and feed - Measurement uncertainty | |
| Environment, food, feed, solid mineral fuels, and solid biofuels - Contribution of sampling to measurement uncertainty | |
| Environmental testing - Part 2-11: Tests - Test Ka: Salt mist | |
| Environmental testing - Part 3-11: Supporting documentation and guidance - Calculation of uncertainty of conditions in climatic test chambers | |
| Eurocode - Basis of structural and geotechnical design | |
| Eurocode - Basis of structural design | |
| Eurocode 1: Actions on structures - Part 1-4: General actions - Wind actions | |
| Eurocode 3: Design of steel structures - Part 1-1: General rules and rules for buildings | |
| EXCELSIOR, WOOD, FABRICATED PADS AND BULK FORM | |
| Execution of steel structures and aluminium structures - Part 2: Technical requirements for steel structures | |
| Explosive atmospheres - Part 0: Equipment - General requirements (IEC 60079-0:2017,IDT) | |
| Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres | |
| Explosive atmospheres - Part 14: Electrical installations design, selection and erection | |
| Explosive atmospheres - Part 19: Equipment repair, overhaul and reclamation | |
| Explosive atmospheres - Part 1: Equipment protection by flameproof enclosures "d" | |
| Explosive atmospheres - Part 30-1: Electrical resistance trace heating - General and testing requirements | |
| Explosive atmospheres - Part 30-2: Electrical resistance trace heating - Application guide for design, installation and maintenance | |
| FACILITIES ENGINEERING HANDBOOK | |
| FEED, DRY, FOR DOGS | |
| Ferrite cores - Guidelines on dimensions and the limits of surface irregularities - Part 11: EC-cores for use in power supply applications (IEC 63093- 11:2018,IDT) | |
| Ferrite cores - Guidelines on the limits of surface irregularities - Part 3: ETD-cores, EER-cores, EC-cores and E-cores | |
| Fibre-optic communication subsystem test procedures - Part 4-1: Installed cabling plant - Multimode attenuation measurement | |
| Filing An FAA Waiver | |
| Finishing Materials & Techniques | |
| Fire fighting equipment - Fire hose couplings and ancillary equipment | |
| FLOUR, RYE | |
| FLOUR, WHEAT | |
| Footwear - Test methods for whole shoe - Wear simulation by flex resistance | |
| FRACTURE CONTROL REQUIREMENTS FOR PAYLOADS USING THE NATIONAL SPACE TRANSPORTATION SYSTEM (NSTS) | |
| Functional safety - Safety instrumented systems for the process industry sector - Normative (uon) - Part 1: Framework, definitions, system, hardware and software requirements | |
| Functional safety - Safety instrumented systems for the process industry sector - Part 1: Framework, definitions, system, hardware and application programming Requirements | |
| General requirements for water supply installations | |
| Glass-Fiber-Reinforc ed Thermosetting-Resin Piping Systems | |
| Guide de l'utilisateur \x96 CNB 2010 Commentaires sur le calcul des structures (Partie 4 de la division B) | |
| Guidelines for Smart Grid Cybersecurity Volume 1 - Smart Grid Cybersecurity Strategy, Architecture, and High-Level Requirements | |
| HANDLE, FILE (ADJUSTABLE TYPE) | |
| HANDLES, ASH | |
| HANDLES, MOP (WET) | |
| HANDLES, WOOD ACME THREADED AND TAPERED END | |
| HANDLES: HICKORY, STRIKING TOOL | |
| HANDLES; WOOD, MISCELLANEOUS (FOR) TOOLS | |
| High-voltage test techniques - Partial discharge measurement | |
| High-voltage test techniques - Partial discharge measurements | |
| HOMINY GRITS | |
| How are UK businesses managing the transition to net zero? | |
| Inclusions in Aluminum Casting Alloys - Compiled Literature | |
| INDEX OF NASA PREFIXED FORMS INFORMATION RESOURCES MANAGEMENT DIVISION (CODE JT) OFFICE OF MANAGEMENT SYSTEMS AND FACILITIES | |
| Industrial thermoprocessing equipment - Part 2: Safety requirements for combustion and fuel handling systems | |
| Information security, cybersecurity and privacy protection - Governance of information security | |
| Information technology - Multimedia framework (MPEG-21) - Part 2: Digital Item Declaration | |
| Information technology equipment - Immunity characteristics - Limits and methods of measurement | |
| INSPECTION SYSTEM PROVISIONS FOR AERONAUTICAL AND SPACE SYSTEM MATERIALS, PARTS, COMPONENTS AND SERVICES | |
| Installation and equipment for liquefied natural gas - Design of onshore installations | |
| Instrument transformers - Part 3: Additional requirements for inductive voltage transformers | |
| Instrument transformers - Part 5: Additional requirements for capacitor voltage transformers | |
| Introduction To Advanced Rocketry | |
| Luminaire performance - Part 1: General requirements | |
| MACARONI, SPAGHETTI, VERMICELLI, AND LASAGNA | |
| MALT-PREPARATIONS | |
| MANAGEMENT OF GOVERNMENT QUALITY ASSURANCE FUNCTIONS FOR NASA CONTRACTS | |
| MARKING OF COMPONENTS AND PARTS | |
| Materials and articles in contact with foodstuffs - Plastics - Part 2: Test methods for overall migration in vegetable oils | |
| Mergers and Acquisitions | |
| MICROBIOLOGICAL EXAMINATION OF SPACE HARDWARE | |
| Mile High Rocketry | |
| MINERAL FIBER BLANKET THERMAL INSULATION | |
| Model Rocket Adhesives | |
| Multi-Staging Advanced Rockets | |
| n-BUTYL ACETATE CAS # 123-86-4 ORAL RISK ASSESSMENT DOCUMENT | |
| N-Ethyl Pyrrolidone CAS # 2687-91-4 ORAL RISK ASSESSMENT DOCUMENT | |
| NAR Bylaws | |
| NASA ASSURANCE TERMS AND DEFINITIONS | |
| NASA AUDIT FOLLOWUP HANDBOOK | |
| NASA COMMUNICATIONS SECURITY MANUAL | |
| NASA DIRECTIVES MASTER LIST AND INDEX RESOURCES AND MANAGEMENT CONTROLS OFFICE (CODE JM) OFFICE OF MANAGEMENT SYSTEMS AND FACILITIES | |
| NASA MANAGEMENT DIRECTIVES SYSTEM HANDBOOK | |
| NASA PERSONNEL SECURITY HANDBOOK | |
| NASA POSITION CLASSIFICATION HANDBOOK | |
| NASA RECORDS DISPOSITION HANDBOOK PROCEDURES GOVERNING THE RETENTION, RETIREMENT, AND DESTRUCTION OF AGENCY RECORDS | |
| NASA SCIENTIFIC AND TECHNICAL INFORMATION HANDBOOK: DOCUMENTATION, APPROVAL, AND DISSEMINATION | |
| National Annex to Eurocode 1: Actions on structures - Part 1-6: General actions - Actions during execution | |
| National Annex to NEN-EN 1990 Eurocode: Basis of structural design | |
| National Annex to NEN-EN 1990+A1:2006+A1:2006 /C2:2019 Eurocode: Basis of structural design | |
| National Annex to NEN-EN 1991-1-1 Eurocode 1: Actions on structures - Part 1-1: General actions - Densities, self-weight, imposed loads for buildings | |
| National Annex to NEN-EN 1991-1-1+C1+C11: Eurocode 1 - Actions on structures - Part 1-1: General actions \x96 Densities, self-weight, imposed loads for buildings | |
| National Annex to NEN-EN 1991-1-3 Eurocode 1: Actions of structures - Part 1-3: General actions - Snow loads | |
| National Annex to NEN-EN 1991-1-3+C1: Eurocode 1 - Actions on structures - Part 1-3: General actions \x96 Snow loads | |
| National Annex to NEN-EN 1991-1-4+A1+C2: Eurocode 1: Actions on structures - Part 1-4: General actions - Wind actions | |
| National Annex to NEN-EN 1991-1-5 Eurocode 1: Actions on structures - Part 1-5: General actions - Thermal actions | |
| National Annex to NEN-EN 1991-1-7 Eurocode 1: Actions on structures - Part 1-7: General actions - Accidental actions | |
| National Annex to NEN-EN 1992-1-1 Eurocode 2: Design of concrete structures - Part 1-1: General rules and rules for buildings | |
| National Annex to NEN-EN 1992-1-1+C2 Eurocode 2: Design of concrete structures - Part 1-1: General rules and rules for buildings | |
| National Annex to NEN-EN 1992-1-2 Eurocode 2: Design of concrete structures - Part 1-2: General rules - Structural fire design | |
| National Annex to NEN-EN 1993-1-1 Eurocode 3: Design of steel structures - Part 1-1: General rules and rules for buildings | |
| National Annex to NEN-EN 1993-1-2 Eurocode 3: Design of steel structures - Part 1-2: General rules - Structural fire design | |
| National Annex to NEN-EN 1993-1-3 Eurocode 3: Design of steel structures - Part 1-3: General rules - Supplementary rules for cold-formed members and sheeting | |
| National Annex to NEN-EN 1993-1-4 Eurocode 3: Design of steel structures - Part 1-4: General rules - Supplementary rules for stainless steels | |
| National Annex to NEN-EN 1993-1-8 Eurocode 3: Design of steel structures - Part 1-8: Design of joints | |
| National Annex to NEN-EN 1994-1-2 Eurocode 4: Design of composite steel and concrete structures - Part 1-2: General rules - Structural fire design | |
| National Annex to NEN-EN 1997-1 Eurocode 7: Geotechnical design - Part 1: General rules | |
| National Annex to NEN-EN 1997-2: Geotechnical design - Part 2: Ground investigation and testing (including C1:2010) | |
| NATIONAL BOARD INSPECTION CODE (NBIC) - HARDCOPY + PDF COMBO 4 VOLUME SET(PARTS 1-4) *** YOU SAVE 33% *** | |
| National Board Inspection Code (NBIC) - Part 1 Installation | |
| National Board Inspection Code (NBIC) - Part 2 Inspection | |
| National Board Inspection Code (NBIC) - Part 3 Repairs and Alterations | |
| National Board Inspection Code (NBIC) - Part 4 Pressure Relief Devices | |
| National Board Inspection Code (NBIC) | |
| National Design Specification for Wood Construction | |
| National Electric Code Changes | |
| NATIONAL ELECTRICAL CODE (NEC) - ANALYSIS OF CHANGES FROM THE 2008 EDITION TO THE 2011 EDITION | |
| NATIONAL ELECTRICAL CODE (NEC) - ANALYSIS OF CHANGES FROM THE 2008 EDITION TO THE 2017 EDITION | |
| National Electrical Safety Code | |
| NATIONAL FIRE CODES ARCHIVE SET | |
| Natural Gas Quality Management Manual | |
| NEBB Portfolio | |
| NEC Analysis of Changes | |
| NEC EXPERT VIDEO SERIES | |
| NEC POCKET GUIDE TWO-VOLUME SET | |
| NEMA REPORT-DETERMINATION OF MAXIMUM PERMISSIBLE CURRENT CARRYING CAPACITY OF CODE INSULATED WIRE AND CABLES FOR BUILDING PURPOSES | |
| NEMA SITE LICENSE | |
| Net Zero Solution Pack: a checklist for achievement of carbon neutrality | |
| Net Zero Solution Pack: a checklist for commitment to carbon neutrality | |
| Neural Network Programming with Java | |
| New Directions in Bioprocess Modeling and Control: Maximizing Process Analytical Technology Benefits | |
| New Generation Vaccines | |
| New Therapeutic Agents In Thrombosis And Thrombolysis, Revised And Expanded | |
| Newborn Blood Spot Screening for Pompe Disease by Lysosomal Acid a-Glucosidase Activity Assays | |
| Newborn Blood Spot Screening for Severe Combined Immunodeficiency by Measurement of T-cell Receptor Excision Circles; Approved Guideline | |
| Newborn Screening by Tandem Mass Spectrometry | |
| Newborn Screening Follow-up and Education | |
| Newborn Screening Follow-up; Approved Guideline | |
| Newborn Screening for Congenital Adrenal Hyperplasia | |
| Newborn Screening for Congenital Hypothyroidism | |
| Newborn Screening for Cystic Fibrosis | |
| Newborn Screening for Hemoglobinopathies | |
| Newborn Screening for Preterm, Low Birth Weight, and Sick Newborns | |
| Newborn Screening for Spinal Muscular Atrophy | |
| Newborn Screening for X-Linked Adrenoleukodystrophy | |
| NGA's GANA Glazing Manual, International Year of Glass Edition | |
| Nginx HTTP Server | |
| NGN Focus Group Proceedings: Part 1 | |
| NGN Focus Group Proceedings: Part 2 | |
| Nickel and the Skin: Absorption, Immunology, Epidemiology, and Metallurgy | |
| NIJ Standard for Ballistic Helmets | |
| NIRA Tips Book | |
| NISO Strategic Directions | |
| Nobake Materials and Equipment | |
| Nobake Mold and Core Defects | |
| Nobake Mold and Core Process | |
| Nonmetallic Materials Part 1 - Thermoplastic Material Specifications | |
| Nonmetallic Materials Part 2 - Reinforced Thermoset Plastic Material Specifications | |
| Nonmetallic Materials Part 3 - Properties | |
| NOODLES, BUTTERED, THERMOSTABILIZED, TRAY PACK | |
| NOODLES | |
| NTPEP Model Deployment Handbook | |
| Obsolescence management - Application guide | |
| OFFICE OF SAFETY AND MISSION QUALITY FLAMMABILITY, ODOR, OFFGASSING, AND COMPATIBILITY REQUIREMENTS AND TEST PROCEDURES FOR MATERIALS IN ENVIRONMENTS THAT SUPPORT COMBUSTION | |
| Operation of electrical installations - High voltage | |
| Operation of electrical installations - Low voltage | |
| PACKAGING, HANDLING AND TRANSPORTATION FOR AERONAUTICAL AND SPACE SYSTEMS, EQUIPMENT, AND ASSOCIATED COMPONENTS, REQUIREMENTS FOR | |
| Paints and varnishes - Drying tests - Part 4: Test using a mechanical recorder | |
| Plastics piping systems for non-pressure underground drainage and sewerage - Structured-wall piping systems of unplasticized poly(vinyl chloride) (PVC-U), polypropylene (PP) and polyethylene (PE) - Part 1: General requirements and performance... | |
| Plastics piping systems for non-pressure underground drainage and sewerage - Structured-wall piping systems of unplasticized poly(vinyl chloride) (PVC-U), polypropylene (PP) and polyethylene (PE) - Part 1:General requirements and performance characteristics... | |
| PLATINUM RESISTANCE THERMOMETER | |
| Preprint Proposals for the 2007 Edition of the National Electrical Safety Code | |
| Process measurement and control devices - General methods and procedures for evaluating performance - Part 2: Test under reference conditions | |
| Process measurement and control devices - General methods and procedures for evaluating performance - Part 2: Tests under reference conditions | |
| Product/Service Certification in the Exploration & Production Sector of the Worldwide Oil and Gas Industry Needs Assessment Survey Report | |
| Quality management - Guidelines for quality plans (ISO 10005:2018,IDT) | |
| Quality measuring system and process control system for cleaning performance | |
| QUALITY PROGRAM PROVISIONS FOR AERONAUTICAL AND SPACE SYSTEM CONTRACTORS | |
| Radio-frequency connectors - Part 52: Sectional specification for series MMCX RF coaxial connectors | |
| Reciprocating internal combustion engine driven alternating current generating sets - Part 9: Measurement and evaluation of mechanical vibrations | |
| Reciprocating internal combustion engines - Exhaust emission measurement - Part 2: Measurement of gaseous and particulate exhaust emissions under field conditions | |
| Recommended Practice for Commissioning Building Electrical Systems | |
| Recommended Practice for Designing, Installing, Operating, and Maintaining Microgrids | |
| Recommended Practice for Installing and Commissioning Interconnected Generation Systems | |
| Recommended Practice for Installing and Maintaining Busways | |
| Recommended Practice for Installing and Maintaining Dry-Type Transformers | |
| Recommended Practice for Installing and Maintaining Industrial Heat Tracing Systems | |
| Recommended Practice for Installing and Maintaining Medium-Voltage Cable | |
| Recommended Practice for Installing and Maintaining Motor Control Centers | |
| Recommended Practice for Installing and Maintaining Panelboards | |
| Recommended Practice for Installing and Maintaining Switchboards | |
| Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites | |
| Recommended Practice for Installing Energy Storage Systems (ESS) | |
| Recommended Practice for Installing Exterior Lighting Systems | |
| Recommended Practice for Installing Generator Sets | |
| Recommended Practice for Installing Indoor Commercial Lighting Systems | |
| Recommended Practice for Installing Industrial Lighting Systems | |
| Recommended Practice for Installing Metal Cable Tray Systems | |
| Recommended Practice for Installing Underground Nonmetallic Utility Duct | |
| Recommended Practice for the Installation of Aluminum Building Wire and Cable | |
| RELIABILITY PROGRAM REQUIREMENTS FOR AERONAUTICAL AND SPACE SYSTEM CONTRACTORS | |
| REQUIREMENTS FOR CONFORMAL COATING AND STAKING OF PRINTED WIRING BOARDS AND ELECTRONIC ASSEMBLIES | |
| REQUIREMENTS FOR CRIMPING AND WIRE WRAP (REPRINT INCLUDES CHANGE 1) | |
| REQUIREMENTS FOR ELECTROSTATIC DISCHARGE CONTROL (EXCLUDING ELECTRICALLY INITIATED EXPLOSIVE DEVICES) | |
| REQUIREMENTS FOR INTERCONNECTING CABLES, HARNESSES, AND WIRING | |
| Requirements for pipeline systems - Part 1: General requirements | |
| Requirements for pipeline systems - Part 2: Additional specifications for steel pipelines | |
| Requirements for pipeline systems - Part 3: Additional specifications for plastic pipelines | |
| Requirements for pipeline systems - Part 4: Additional specifications for concrete pipelines | |
| Requirements for pipeline systems - Part 5: Additional specifications for cast iron pipelines | |
| REQUIREMENTS FOR PRINTED WIRING BOARDS | |
| REQUIREMENTS FOR SOLDERED ELECTRICAL CONNECTIONS | |
| Requirements for submarine steel pipeline systems | |
| Rocket Launchers | |
| Rubber - Tolerances for products - Part 1: Dimensional tolerances | |
| Rules for the Movement of Loads Using Overhead Handling Equipment in Nuclear Facilities | |
| SAFETY AND HEALTH HANDBOOK OCCUPATIONAL SAFETY AND HEALTH PROGRAMS | |
| Safety management system for pipeline systems for the transport of hazardous substances - Functional requirements | |
| SAFETY, RELIABILITY, AND QUALITY ASSURANCE PROVISIONS FOR THE OFFICE OF AERONAUTICS, EXPLORATION AND TECHNOLOGY CENTERS | |
| SAFETY, RELIABILITY, MAINTAINABILITY AND QUALITY PROVISIONS FOR THE SPACE SHUTTLE PROGRAM | |
| Sanitary tapware - Electronic opening and closing sanitary tapware | |
| Security and resilience - Organizational resilience - Guidelines for resilience policy and strategy | |
| Selected Laboratory and Measurement Practices and Procedures to Support Basic Mass Calibrations | |
| Semiconductor devices - Mechanical and climatic test methods - Part 1: General | |
| Series 1 freight containers - Specification and testing - Part 2: Thermal containers | |
| Short link chain for lifting purposes - Safety - Part 2: Medium tolerance chain for chain slings - Grade 8 | |
| Short-circuit currents - Calculation of effects - Part 1: Definitions and calculation methods | |
| Solidification Characteristics of Aluminum Alloys Vol 2: Foundry Alloys | |
| Solidification Characteristics of Aluminum Alloys Vol 3: Dendrite Coherency | |
| Spare parts provisioning | |
| Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys... | |
| Standard for Arc-Fault Circuit Interrupters (AFCIs) and Ground-Fault Circuit Interrupters (GFCIs) | |
| Standard for Building and Service Entrance Grounding and Bonding | |
| Standard for Energy Management, Demand Response and Energy Solutions | |
| Standard for Fire Alarm System Job Practices | |
| Standard for Fuse Applications | |
| Standard for Installing Aluminum Rigid Metal Conduit | |
| Standard for Installing and Maintaining Electric Vehicle Supply Equipment (EVSE) | |
| Standard for Installing and Maintaining High Mast, Roadway and Area Lighting | |
| Standard for Installing and Maintaining Liquid-Filled Transformers | |
| Standard for Installing and Maintaining Photovoltaic (PV) Power Systems | |
| Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) | |
| Standard for Installing and Maintaining Wiring Devices | |
| Standard for Installing and Testing Fiber Optic Cables | |
| Standard for Installing Armored Cable (AC) and Metal-Clad Cable (MC) | |
| Standard for Installing Closed-Circuit Television (CCTV) Systems | |
| Standard for Installing Commercial Building Telecommunications Cabling | |
| Standard for Installing Fiber Optic Lighting Systems | |
| Standard for Installing Medium-Voltage Metal-Clad Switchgear | |
| Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) | |
| Standard for Installing Nonmetallic-Sheathed Cable (Type NM-B) and Underground Feeder and Branch-Circuit Cable (Type UF) | |
| Standard for Installing Overcurrent Protection to Achieve Selective Coordination | |
| Standard for Installing Residential Generator Sets | |
| Standard for Installing Steel Conduits (Rigid, IMC, EMT) | |
| Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers | |
| Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings | |
| Standard Practices for Good Workmanship in Electrical Contracting | |
| Standard Test Methods for Extruded Dielectric Power, Control, Instrumentation, and Portable Cables for Test (ANSI/NEMA WC 53/ICEA T-27-581-1990) | |
| STARCHES, EDIBLE | |
| Stationary source emissions - Data acquisition and handling systems - Part 1: Specification of requirements for the handling and reporting of data | |
| Stationary source emissions - Quality assurance of automated measuring systems | |
| Steel and steel products - Location and preparation of samples and test pieces for mechanical testing | |
| Steel for the reinforcement of concrete | |
| Supersonic Rocketry | |
| Supply for gas with an operating pressure up to and including 500 mbar - Performance requirements - Existing estate | |
| Sustainable procurement - Guidance | |
| Symbols for Electrical Construction Drawings | |
| Systems and software engineering - Life cycle management - Part 5: Software development planning | |
| Temperature compensation for compressed natural gas vehicle fuelling | |
| Temperature compensation guideline for compressed natural gas vehicle fueling | |
| TEST VEHICLES FOR TRANSIENT REACTOR TEST FACILITY (TREAT) EXPERIMENTS CONTAINING SODIUM (INACTIVE FOR NEW DESIGN) | |
| THERMOCOUPLE MATERIAL AND THERMOCOUPLE ASSEMBLY, CHROMEL-P VERSUS ALUMEL, STAINLESS STEEL SHEATHED, MAGNESIUM OXIDE INSULATED | |
| Thermoplastic Piping Systems | |
| Treatment of Liquid Aluminum-Silicon Alloys | |
| UK Capital Delivery Business Procedures - Avoidance of Buried Services | |
| UK Capital Delivery Business Procedures - Environmental Requirements for Construction Pojects | |
| UK Capital Delivery Business Procedures - Project Delivery and Execution Requirements Procedure (Electricity) | |
| UK Capital Delivery Business Procedures - The Management of Incident Investigation and Audit Report Recommendations | |
| UK Construction Business Procedures - Construction Document Dissemination Procedure (Electric) | |
| UK Construction Business Procedures - Construction Project Documentation Management and Reporting | |
| UK Construction Business Procedures - Ground Mapping Survey Procedure | |
| UK Construction Business Procedures - Lessons Learnt Management Procedure | |
| UK Construction Business Procedures - QA Auditing Requirements | |
| UK Construction Business Procedures - Safety, Health & Environmental (SHE) Auditing / Inspection Procedure | |
| UK Construction Business Procedures - The Elimination and Reduction of SHES Risks and Hazards During Scheme Design, Installation and Commissioning (Zero by Design) | |
| UK Construction Business Procedures - The Management of Incident Investigation and Audit Report Recommendations | |
| UK Construction Business Procedures - Transmission Construction Electricity Design Management for Legacy Projects | |
| Unplasticized poly(vinyl chloride) (PVC-U) profiles for the fabrication of windows and doors - Classification, requirements and test methods - Part 4: PVC-U profiles with thermo-laminated foils | |
| USER GUIDE TO PRODUCT SPECIFICATIONS FOR ELECTRICAL BUILDING WIRE AND CABLE | |
| Using standards to reach net zero carbon emissions | |
| VOLUNTARY PRODUCT STANDARD, STRUCTURAL PLYWOOD | |
| Water - Photometric determination of the content of and the sum of ammonium nitrogen and of the sum of the contents of ammoniacal and organically bound nitrogen according to Kjeldahl... | |
| Water quality - Determination of ammonium nitrogen - Method by flow analysis (CFA and FIA) and spectrometric detection | |
| Water-tube boilers and auxiliary installations - Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler | |
| WELDING OF STRUCTURAL COMPONENTS (AWS D1.1 WITH ADDITIONAL REQUIREMENTS) (INACTIVE FOR NEW DESIGN) | |
| What's in the Net Zero Solution Pack, and how to access video content | |
| Woodworking machines - Safety - Part 7: Surface planing, thickness planing, combined surface/thickness planing machines |
| << Prev | Next >> |