Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
500
1000
1050
1100
1150
1200
1250
1300
1310
1320
1330
1340
1350
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1370
1380
1390
1400
1410
1420
1450
1500
1550
1600
1620
| Product Name | Notes |
|---|---|
| ACCEPTANCE OF GIFTS TO MSFC) | |
| AFFIRMATIVE PROCUREMENT PLAN FOR ENVIRONMENTALLY PREFERABLE PRODUCTS (SEE NASA NPR 8830.1) | |
| AGENCY INFORMATION TECHNOLOGY SERVICES | |
| Agency Risk Management Procedural Requirements | |
| ALTERNATIVE DISPUTE RESOLUTION PROCESS | |
| ANNEX TO NASA-STD 8719.24 NASA EXPENDABLE LAUNCH VEHICLE PAYLOAD SAFETY REQUIREMENTS: REQUIREMENTS TABLE | |
| APPLICATION OF DATAMATRIX IDENTIFICATION SYMBOLS TO AEROSPACE PARTS USING DIRECT PART MARKING METHODS/TECHNIQUES | |
| APPLYING DATA MATRIX IDENTIFICATION SYMBOLS ON AEROSPACE PARTS | |
| APPOINTMENT OF PERSONNEL TO/FROM NASA (SEE NASA NPR 3300.1) | |
| ASSURED CREW RETURN VEHICLE MAN-SYSTEMS INTEGRATION STANDARDS | |
| ATTENDANCE AND LEAVE (SEE NASA NPR 3600.1) | |
| Audio and Video Standards for Internet Resources | |
| BIOLOGICAL CONTAMINATION CONTROL FOR OUTBOUND AND INBOUND PLANETARY SPACECRAFT | |
| BIOS (Dell and HP workstation) Specification | |
| BLOODBORNE PATHOGENS | |
| BUSINESS CARDS | |
| CARE AND USE OF ANIMALS (SEE NASA NPR 8910.1) | |
| CARE AND USE OF ANIMALS | |
| CENTER PUBLIC EXHIBITS GUIDANCE AND PROCESS | |
| CERTIFICATION AND RECERTIFICATION OF LIFTING DEVICES AND EQUIPMENT | |
| CLASSIFICATIONS AND REQUIREMENTS FOR TESTING SYSTEMS AND HARDWARE TO BE EXPOSED TO DUST IN PLANETARY ENVIRONMENTS | |
| COLLABORATIVE TOOLS STANDARDS | |
| Computing System Configuration Management | |
| CONDUCT OF RESEARCH AND TECHNOLOGY ACTIVITIES | |
| CONFIDENTIAL FINANCIAL DISCLOSURE REPORTS | |
| CONFIGURATION CONTROL, MSFC PROGRAMS/PROJECTS | |
| CONFIGURATION MANAGEMENT PLAN, MSFC PROGRAMS/PROJECTS | |
| CONFIGURATION MANAGEMENT, MSFC PROGRAMS/PROJECTS | |
| Configuration Management | |
| CONTINUAL IMPROVEMENT | |
| CONTRACT COST ACCRUAL PROCESS FOR NASA FORM 533 REPORTABLE CONTRACTS | |
| CORROSION PROTECTION FOR SPACE FLIGHT HARDWARE | |
| CRIMPING, INTERCONNECTING CABLES, HARNESSES, AND WIRING | |
| CUSTOMER SATISFACTION | |
| DATA MANAGEMENT PLANS, PROGRAMS/PROJECTS | |
| DATA MANAGEMENT, PROGRAMS/PROJECTS | |
| DELEGATION OF AUTHORITY AND POLICY ON OVERTIME | |
| Delegation of Authority-To Grant Exemptions from the Mandatory Use of the Government Contractor-Issued Travel Card | |
| DESIGN AND CONSTRUCTION OF FACILITIES | |
| DESIGN AND DEVELOPMENT REQUIREMENTS FOR MECHANISMS | |
| DESIGN DEVELOPMENT | |
| DESIGN PLANNING AND INTERFACE MANAGEMENT | |
| DESIGN, INSPECTION, AND CERTIFICATION OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS | |
| DIGITAL TELEVISION STANDARDS FOR NASA | |
| DISCIPLINARY AND ADVERSE ACTIONS (SEE NASA NPR 3752.1) | |
| DISTRIBUTION OF ROYALTIES AND OTHER PAYMENTS RECEIVED BY NASA FROM THE LICENSING OR ASSIGNMENT OF INVENTIONS (SEE NASA NPR 2092.1) | |
| DOCUMENTATION PREPARATION, PROGRAMS/PROJECTS | |
| DUAL CAREER PROMOTION PROCESS | |
| EARNED VALUE MANAGEMENT | |
| ELECTRICAL BONDING FOR NASA LAUNCH VEHICLES, SPACECRAFT, PAYLOADS, AND FLIGHT EQUIPMENT | |
| ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL (EEE) PARTS ASSURANCE STANDARD | |
| ELECTROSTATIC DISCHARGE (ESD) CONTROL | |
| ELECTROSTATIC DISCHARGE CONTROL (EXCLUDING ELECTRICALLY INITIATED EXPLOSIVE DEVICES) | |
| ENERGY CONSERVATION | |
| ENERGY EFFICIENCY AND WATER CONSERVATION TECHNOLOGIES AND PRACTICES (SEE NASA NPR 8570.1) | |
| ENGINEERING PEER REVIEWS (CANCELLING NASA GPG 8700.6) | |
| ENGINEERING PEER REVIEWS | |
| ENVIRONMENTAL INVESTIGATION AND REMEDIATION - POTENTIALLY RESPONSIBLE PARTY IDENTIFICATION AND ANALYSIS (SEE NASA NPR 8850.1) | |
| ESTABLISHING A SCIENCE AND RESEARCH INSTITUTE (SEE NASA NPR 5000.1) | |
| Estimation and Evaluation of Measurement Decision Risk, NASA Measurement Quality Assurance Handbook \x96 ANNEX 4 | |
| Exchange ActiveSync Specification | |
| EXTERNAL RELEASE OF NASA SOFTWARE | |
| FACILITY PROJECT PLANNING PROCESS | |
| FACILITY PROJECT REQUIREMENTS (FPR) | |
| FACILITY SUSTAINABLE DESIGN | |
| FACILITY TYPE DRAWING AND DOCUMENTATION PROCEDURES | |
| Fastener Test Methods; Method 1 Salt Spray | |
| Fastener Test Methods; Method 10 Stress Rupture | |
| Fastener Test Methods; Method 11 Tension Fatigue | |
| Fastener Test Methods; Method 12 Thickness of Metallic Coatings | |
| Fastener Test Methods; Method 13 Double Shear Test | |
| Fastener Test Methods; Method 14 Stress Durability Internally Threaded Fasteners | |
| Fastener Test Methods; Method 15 Torque - Tension | |
| Fastener Test Methods; Method 16 Clamping Force for Installation Formed Fasteners | |
| Fastener Test Methods; Method 17 Stress Relaxation | |
| Fastener Test Methods; Method 18 Elevated Temperature Tensile Strength | |
| Fastener Test Methods; Method 19 Fastener Sealing | |
| Fastener Test Methods; Method 2 Interaction | |
| Fastener Test Methods; Method 20 Single Shear | |
| Fastener Test Methods; Method 21 Shear Joint Fatigue Constant Amplitude | |
| Fastener Test Methods; Method 22 Receptacle Push-Out, Panel Fasteners | |
| Fastener Test Methods; Method 23 Tensile Strength of Panel Fasteners | |
| Fastener Test Methods; Method 24 Receptacle Torque-Out, Panel Fasteners | |
| Fastener Test Methods; Method 25 Driving Recess Torque Quality Conformance Test | |
| Fastener Test Methods; Method 26 Structural Panel Fastener Lap Joint Shear | |
| Fastener Test Methods; Method 27, Panel Fastener Sheet Pull-Up | |
| Fastener Test Methods | |
| FEDERAL EMPLOYEE LABOR MANAGEMENT RELATIONS PROGRAM (SEE NASA NPR 3711.1) | |
| FIBER OPTIC TERMINATIONS, CABLE ASSEMBLIES, AND INSTALLATION | |
| FINANCIAL DISCLOSURE REPORTS (SEE NASA NPR 1900.3) | |
| FLAMMABILITY, OFFGASSING, AND COMPATIBILITY REQUIREMENTS AND TEST PROCEDURES | |
| FRACTURE CONTROL IMPLEMENTATION HANDBOOK FOR PAYLOADS, EXPERIMENTS, AND SIMILAR HARDWARE | |
| FRACTURE CONTROL REQUIREMENTS FOR PAYLOADS USING THE SPACE SHUTTLE | |
| Fracture Control Requirements for Space Station | |
| FRACTURE CONTROL REQUIREMENTS FOR SPACEFLIGHT HARDWARE | |
| GENERAL FRACTURE CONTROL REQUIREMENTS FOR MANNED SPACEFLIGHT SYSTEMS | |
| GENERAL FUSION WELDING REQUIREMENTS FOR AEROSPACE MATERIALS USED IN FLIGHT HARDWARE | |
| GENERAL WELDING REQUIREMENTS FOR AEROSPACE MATERIALS | |
| GODDARD MANAGEMENT OF PRINCIPAL INVESTIGATOR MODE MISSIONS | |
| Goddard Security Requirements | |
| GODDARD SPACE FLIGHT CENTER SAFETY MANAGEMENT COUNCIL | |
| GRIEVANCE SYSTEM (SEE NASA NPR 3771.1) | |
| GROUND SUPPORT EQUIPMENT | |
| GUIDE FOR INSERVICE INSPECTION OF GROUND-BASED PRESSURE VESSELS AND SYSTEMS | |
| GUIDELINES FOR THE SPECIFICATION AND CERTIFICATION OF TITANIUM ALLOYS FOR NASA FLIGHT APPLICATIONS | |
| HANDBOOK FOR LIMITING ORBITAL DEBRIS | |
| HANDBOOK FOR RECOMMENDED MATERIAL REMOVAL PROCESSES FOR ADVANCED CERAMIC TEST SPECIMENS AND COMPONENTS | |
| HAZARD IDENTIFICATION AND WARNING SYSTEM | |
| HTTP Specification | |
| IBM MaaS360 Specification | |
| IDENTIFICATION AND DISPOSITION OF NASA ARTIFACTS (SEE NASA NPR 4310.1) | |
| IMPLEMENTATION REQUIREMENTS FOR NASA APPROVED WORKMANSHIP STANDARDS | |
| IMPLEMENTATION REQUIREMENTS FOR NASA WORKMANSHIP STANDARDS | |
| Insert, Cres Helical Coil Coarse Thread 1-1/2 Dia Nominal Length | |
| Insert, CRES Helical Coil Coarse Thread, 1 Dia Nominal Length | |
| Insert, Cres Helical Coil Coarse Thread, 2 Dia Nominal Length | |
| Insert, Cres Helical Coil Coarse Thread, 2-1/2 Dia Nominal Length | |
| Insert, Cres Helical Coil Coarse Thread, 3 Dia Nominal Length | |
| Insert, Cres Helical Coil Fine Thread, 1 Dia Nominal Length | |
| Insert, Cres Helical Coil Fine Thread, 1-1/2 Dia Nominal Length | |
| Insert, Cres Helical Coil Fine Thread, 2 Dia Nominal Length | |
| Insert, Cres Helical Coil Fine Thread, 2-1/2 Dia Nominal Length | |
| Insert, CRES Helical Coil Fine Thread, 3 Dia Nominal Length | |
| INSPECTION OF HAZARDOUS TEST FACILITY CONFIGURATION CHANGES | |
| INTEGRATED INDEPENDENT REVIEWS (FORMERLY NASA GPG 8700.4) | |
| Interdisciplinary Approach to Liquid Lubricant Technology | |
| INTERNAL PLACEMENT OF NASA EMPLOYEES (SEE NASA NPR 3335.1) | |
| INVENTIONS MADE BY GOVERNMENT EMPLOYEES | |
| JOHNSON SPACE CENTER INFORMATION TECHNOLOGY (IT) PROGRAM MANAGEMENT | |
| JSC ENGINEERING DRAWING SYSTEM | |
| JSC OCCUPATIONAL MEDICINE PROGRAM | |
| LAUNCH SERVICES RISK MITIGATION POLICY FOR NASA-OWNED AND/OR NASA-SPONSORED PAYLOADS/MISSIONS | |
| LEAK TEST REQUIREMENTS | |
| Lessons Learned - Ares Projects Office Knowledge Management Report | |
| Lessons Learned - Contamination Control for Susceptible Instruments | |
| Lessons Learned - Disconnect Between CxP Supportability Plan and GOP Integrated Logistics Support Plan | |
| Lessons Learned - Early Implementation of a Change Management Process | |
| Lessons Learned - Flyable Storage Aircraft Maintenance Procedures | |
| Lessons Learned - High Pressure Steam Strainer Failure | |
| Lessons Learned - How to Plan and Manage Project Reserves | |
| Lessons Learned - Knowledge Management: Distribution of Information in Complex Originations | |
| Lessons Learned - Need to Include Systems Engineering Early in Project Formulation | |
| Lessons Learned - Next Generation Launch Technology (NGLT) / Create an Environment That Will Accept ?Bad News? by Management | |
| Lessons Learned - Next Generation Launch Technology (NGLT)- Clearly Define Roles, Responsibilities, and a Common Set of Values | |
| Lessons Learned - Next Generation Launch Technology (NGLT)- Plan for and Adequately Staff the Project Team | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/A Simple, Clear Management Chain is Critical | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Allow Time for Adequate Project Formulation, Even When Task Appears Low Risk | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Centralized, Standardized Resources Integration is Critical to Success | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Clearly Establish Reserves, Schedule Margin, and Spending Profile Early | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Credible, Independent Cost Estimates are Needed Early in a Project | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Develop an Integrated Master Schedule in the Formulation Phase | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Early Development of a Systems Engineering Management Plan is Critical | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Proper Government Insight Planning is Required | |
| Lessons Learned - Next Generation Launch Technology (NGLT)/Rigorous Systems Engineering is Needed in Technology Projects | |
| Lessons Learned - Next Generation Launch Technology (NGLT): Establish an Early Link Between Systems Engineering & Analysis and Technology Projects | |
| Lessons Learned - Program Management's Lead Role in the Project's Risk Management Process | |
| Lessons Learned - Project Management Status Reporting | |
| Lessons Learned - Project Management: Construction of Facilities Project Pitfalls | |
| Lessons Learned - Project Management: Effective Project Management Training | |
| Lessons Learned - Project Manager Training and Development Program | |
| Lessons Learned - Project Status and Tracking | |
| Lessons Learned - Risk Management: Cascading and Worst Case Events | |
| Lessons Learned - Risk Management: Limited Value of Paper Studies and Projects Not Reaching Their Full Life Cycle | |
| Lessons Learned - Risk Management: Managing risk in a risk adverse culture | |
| Lessons Learned - Space Mechanisms Reliability (2000) | |
| Lessons Learned - Space Shuttle Program Integration, Planning, Scheduling and Tracking | |
| Lessons Learned - Standards, Specifications and Processes for Projects with Outside Partners | |
| Lessons Learned - Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases) | |
| Lessons Learned - Systems Engineering: Balancing the Requirements Between Scientific and Engineering Data | |
| Lessons Learned \x96 100+ Lessons Learned for Project Managers | |
| Lessons Learned \x96 Acquisition Management: Using Competitive Acquisition Mechanisms to Ensure the Quality and Competence of the Contractor | |
| Lessons Learned \x96 Active Redundancy | |
| Lessons Learned \x96 Avionics Line Replaceable Unit Built in Tests | |
| Lessons Learned \x96 Avoid Test Program Reductions on Lower Cost/Higher Risk Instrument Projects | |
| Lessons Learned \x96 Contamination Budgeting for Space Optical Systems | |
| Lessons Learned \x96 Contamination Control of Space Optical Systems | |
| Lessons Learned \x96 Contamination Control Operational Maintenance Requirements and Specifications Document Requirements (OMRSD) | |
| Lessons Learned \x96 Contamination Control Program | |
| Lessons Learned \x96 Continuous Capture of Lessons Learned During Project Lifecycle (1996) | |
| Lessons Learned \x96 Cost Estimating: Indirect private industry costs of space missions | |
| Lessons Learned \x96 Degradation of Pur-Ester Polyurethane Tubing due to Aging | |
| Lessons Learned \x96 Design for Operability; High Use Nut Plate/ Insert Design | |
| Lessons Learned \x96 Design Verification Development | |
| Lessons Learned \x96 Earned Value Management/"RESULTS OF A NASA KENNEDY SPACE CENTER EARNED VALUE MANAGEMENT PILOT PROJECT"/Project Management | |
| Lessons Learned \x96 High Performance Liquid Hydrogen Turbopumps | |
| Lessons Learned \x96 Lack of Project-level Reserves | |
| Lessons Learned \x96 Marketing Project Contributions, Successes and Research Results to Customers and Management (Knowledge Management) | |
| Lessons Learned \x96 Mean Time To Repair Predictions | |
| Lessons Learned \x96 Metrics in New Program Plans | |
| Lessons Learned \x96 Next Generation Launch Technology (NGLT)/Identify and Track Risks Early and Incorporate into Acquisition Strategy | |
| Lessons Learned \x96 Next Generation Launch Technology (NGLT)/Middle-Manage ment Integration is a Powerful Tool | |
| Lessons Learned \x96 Place Flight Scripts Under Configuration Management Prior to ORT | |
| Lessons Learned \x96 Program and Project Management: Center-to-Center Relations | |
| Lessons Learned \x96 Program and Project Management: Strategic Work Breakdown Structure (WBS) | |
| Lessons Learned \x96 Project Management Lessons Learned on a Fast Track Engine Test | |
| Lessons Learned \x96 Project Management: Changing Goals and Strategic Planning | |
| Lessons Learned \x96 Project Management: Styles and Tools for Success | |
| Lessons Learned \x96 Project Management: Training and Development of Project Managers | |
| Lessons Learned \x96 Random Vibration Testing | |
| Lessons Learned \x96 Record Management and Quality Assurance Lesson Learn | |
| Lessons Learned \x96 Risk Management: Lack of a Formal Proposal or New Business Case Review Process | |
| Lessons Learned \x96 Streamlining and Standardizing Project Planning Documents (prepared during formulation and into implementation phases) | |
| Lessons Learned \x96 The Effects of a Project's Culture on Risk Management Success | |
| Lessons Learned from Radioisotope Power Systems (RPS) Programmatic Review | |
| LIFTING STANDARD | |
| LIMITATIONS APPLICABLE TO PERSONNEL EXPOSED TO DIVING | |
| LOAD ANALYSES OF SPACECRAFT AND PAYLOADS | |
| LOW EARTH ORBIT SPACECRAFT CHARGING DESIGN HANDBOOK | |
| LOW EARTH ORBIT SPACECRAFT CHARGING DESIGN STANDARD | |
| Low-speed wind tunnel results for a modified 13-percent-thick airfoil | |
| MAN-SYSTEMS INTEGRATION STANDARDS - VOLUME I | |
| MAN-SYSTEMS INTEGRATION STANDARDS - VOLUME II | |
| MANAGEMENT OF GOVERNMENT SAFETY AND MISSION ASSURANCE SURVEILLANCE FUNCTIONS FOR NASA CONTRACTS (SEE NASA NPR 8735.2) | |
| MANAGEMENT OF HUMAN RESOURCES | |
| MANAGEMENT OF MAJOR SYSTEM PROGRAMS AND PROJECTS HANDBOOK | |
| MANAGEMENT OF SENIOR SCIENTIFIC AND TECHNICAL AND OTHER SENIOR LEVEL POSITIONS (SEE NASA NPR 3319.1) | |
| MANAGEMENT OF THE SENIOR EXECUTIVE SERVICE (SEE NASA NPR 3100.1) | |
| MANAGEMENT REVIEW AND REPORTING FOR PROGRAMS AND PROJECTS | |
| MANAGING INFORMATION TECHNOLOGY (SEE NASA NPR 2800.1) | |
| MANAGING INFORMATION TECHNOLOGY | |
| MARSHALL INFORMATION TECHNOLOGY SERVICES | |
| MARSHALL QUALITY MANAGEMENT SYSTEM MANUAL | |
| MARSHALL SAFETY, HEALTH, AND ENVIRONMENTAL (SHE) PROGRAM | |
| MARSHALL SPACE FLIGHT CENTER ORGANIZATIONAL MANUAL | |
| MARSHALL TELECOMMUNICATIONS AND AUDIO VISUAL SERVICES | |
| Measurement Uncertainty Analysis Principles and Methods NASA Measurement Quality Assurance Handbook \x96 ANNEX 3 | |
| Measuring and Test Equipment Specifications NASA Measurement Quality Assurance Handbook \x96 ANNEX 2 | |
| MEDICAL SUPPORT REQUIREMENTS FOR MANNED TESTING AND TRAINING | |
| Metrology & Calibration | |
| Metrology and Calibration (Update w/change 2: 5/19/2016) | |
| METROLOGY AND CALIBRATION | |
| MINIMUM HARDWARE CONFIGURATIONS | |
| Minimum Information System Owner and End User Security for Data at Rest | |
| Minimum Interoperability and Security Requirements for Server Devices | |
| MINIMUM INTEROPERABILITY SOFTWARE SUITE | |
| Minimum Security and Privacy Requirements for Agency and Center Information System Implementation | |
| Minimum Security and Privacy Requirements for Agency and Center Information System Implementations | |
| MITIGATING IN-SPACE CHARGING EFFECTS -A GUIDELINE | |
| MITIGATING IN-SPACE CHARGING EFFECTS-A GUIDELINE | |
| MSFC ALERT PROCESSING | |
| MSFC ANNUAL REPORT PROCESS | |
| MSFC ENGINEERING AND PROGRAM/PROJECT MANAGEMENT REQUIREMENTS With Change 1 (5/2/17) | |
| MSFC ENGINEERING AND PROGRAM/PROJECT MANAGEMENT REQUIREMENTS With Change 1 (7/17/15) | |
| MSFC ENGINEERING AND PROGRAM/PROJECT MANAGEMENT REQUIREMENTS With Change 2 (7/19/24) | |
| MSFC ENGINEERING AND PROGRAM/PROJECT MANAGEMENT REQUIREMENTS | |
| MSFC ENVIRONMENTAL MANAGEMENT POLICY | |
| MSFC ENVIRONMENTAL MANAGEMENT PROGRAM | |
| MSFC EXPORT CONTROL PROGRAM | |
| MSFC FACILITY UTILIZATION POLICY | |
| MSFC HAZARDOUS CHEMICALS IN LABORATORIES PROTECTION PROGRAM | |
| MSFC IMPLEMENTATION PLANNING PROCESS | |
| MSFC PROGRAM MANAGEMENT COUNCIL (PMC) PROCESS | |
| MSFC QUALITY MANAGEMENT SYSTEM POLICY With Change 2 (1/10/2022) | |
| MSFC QUALITY MANAGEMENT SYSTEM POLICY | |
| MSFC RADIATION PROCEDURES AND GUIDELINES | |
| MSFC RELIABILITY AND MAINTAINABILITY PROGRAM FOR SPACE SYSTEMS | |
| MSFC SOFTWARE ENGINEERING REQUIREMENTS With Change 1 (1/17/14) | |
| NASA AWARDS AND RECOGNITION PROGRAM (SEE NASA NPR 3451.1) | |
| NASA BADGING SYSTEM | |
| NASA BUILDING INFORMATION MODELING SCOPE OF SERVICES AND REQUIREMENTS FOR ARCHITECTS AND ENGINEERS | |
| NASA CAREER TRANSITION ASSISTANCE PROGRAM (CTAP) | |
| NASA COMPUTER-AIDED DESIGN INTEROPERABILITY | |
| NASA Configuration Management (CM) Standard | |
| NASA DIGITAL ENGINEERING ACQUISITION FRAMEWORK HANDBOOK | |
| NASA Directives and Charters Procedural Requirements | |
| NASA EMERGENCY PREPAREDNESS PLAN PROCEDURES AND GUIDELINES | |
| NASA EMPLOYEE PERFORMANCE COMMUNICATION SYSTEM (EPCS) (SEE NASA NPR 3430.1) | |
| NASA ENVIRONMENTAL MANAGEMENT SYSTEM (EMS) (SEE NASA NPR 8553.1) | |
| NASA ENVIRONMENTAL MANAGEMENT | |
| NASA EXHIBITS PROGRAM (SEE NASA NPR 1387.1) | |
| NASA EXPENDABLE LAUNCH VEHICLE PAYLOAD SAFETY REQUIREMENTS | |
| NASA EXPORT CONTROL PROGRAM | |
| NASA FASTENER MANAGEMENT AND CONTROL PRACTICES | |
| NASA FASTENER PROCUREMENT, RECEIVING INSPECTION, AND STORAGE PRACTICES FOR NASA MISSION HARDWARE | |
| NASA FASTENER PROCUREMENT, RECEIVING INSPECTION, AND STORAGE PRACTICES FOR SPACEFLIGHT HARDWARE | |
| NASA HANDBOOK FOR MODELS AND SIMULATIONS: AN IMPLEMENTATION GUIDE FOR NASA-STD-7009 | |
| NASA HANDBOOK FOR MODELS AND SIMULATIONS: AN IMPLEMENTATION GUIDE FOR NASA-STD-7009A | |
| NASA INFORMATION SECURITY POLICY | |
| NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements | |
| NASA Information Technology Program and Project Management Requirements (Revalidated w/Change 1 - 4/8/2024) | |
| NASA Information Technology Program and Project Management Requirements | |
| NASA INTEGRATED INFORMATION TECHNOLOGY ARCHITECTURE TECHNICAL FRAMEWORK TECHNICAL ARCHITECTURE Volume 1 | |
| NASA MANUFACTURING AND TEST REQUIREMENTS FOR NORMALLY CLOSED PYROVALVES FOR HAZARDOUS FLIGHT SYSTEMS APPLICATIONS | |
| NASA OFFICE OF INSPECTOR GENERAL PROGRAMS | |
| NASA Organization-Defined Values for NIST SP 800-53 Rev 4 | |
| NASA PARTS POLICY | |
| NASA PERFORMANCE MANAGEMENT SYSTEM FOR THE SENIOR EXECUTIVE SERVICE (SEE NASA NPR 3435.1) | |
| NASA Personal Property Disposal Policy | |
| NASA POLICY FOR LIMITING ORBITAL DEBRIS GENERATION | |
| NASA POLICY FOR SAFETY AND MISSION ASSURANCE (SMA) FOR EXPERIMENTAL AEROSPACE VEHICLES (EAV) | |
| NASA POLICY FOR SAFETY AND MISSION SUCCESS | |
| NASA Product Data and Life-Cycle Management (PDLM) for Flight Programs and Projects | |
| NASA PRODUCT DATA AND LIFE-CYCLE MANAGEMENT (PDLM) HANDBOOK | |
| NASA PROGRAM AND PROJECT MANAGEMENT PROCESSES AND REQUIREMENTS (SEE NASA NPR 7120.5) | |
| NASA PROGRAM AND PROJECT MANAGEMENT PROCESSES AND REQUIREMENTS | |
| NASA Quality Assurance Program Policy - (Updated with Change 3 10/02/14) | |
| NASA QUALITY MANAGEMENT SYSTEM POLICY (ISO 9000) | |
| NASA RELIABILITY AND MAINTAINABILITY (R&M) PROGRAM POLICY | |
| NASA Reliability and Maintainability (R&M) Standard for Spaceflight and Support Systems | |
| NASA Requirements for Ground-Based Pressure Vessels and Pressurized Systems (PVS) | |
| NASA Research and Technology Program and Project Management Requirements (Revalidated w/change 4 - 9/19/2023)) | |
| NASA Research and Technology Program and Project Management Requirements (Revalidated w/change 5 - 10/27/2023) | |
| NASA Research and Technology Program and Project Management Requirements (w/change 1 dated 11/24/10) | |
| NASA Research and Technology Program and Project Management Requirements (w/change 3 dated 04/18/13) | |
| NASA Risk Management Handbook | |
| NASA Risk-Informed Decision Making Handbook | |
| NASA SAFETY AND HEALTH HANDBOOK OCCUPATIONAL SAFETY AND HEALTH PROGRAMS (SEE NASA NPR 8715.1) | |
| NASA SAFETY MANUAL (SEE NASA NPR 8715.3) | |
| NASA SAFETY POLICY AND REQUIREMENTS DOCUMENT | |
| NASA Safety Policy for Pressure Vessels and Pressurized Systems (Revalidated 4/06/2006) | |
| NASA SAFETY POLICY FOR PRESSURE VESSELS AND PRESSURIZED SYSTEMS | |
| NASA SECURITY PROGRAM PROCEDURAL REQUIREMENTS | |
| NASA Software Engineering Handbook | |
| NASA Software Engineering Requirements | |
| NASA SOFTWARE POLICY (CANCELLING NASA NPD 2210.1, NASA NPD 8730.4) | |
| NASA SPACE FLIGHT HUMAN-SYSTEM STANDARD VOLUME 1, REVISION A: CREW HEALTH | |
| NASA Space Flight Program and Project Management Requirements w/Change 2 - 07/09/2023 | |
| NASA Space Flight Program and Project Management Requirements w/Change 3 - 10/27/2023 | |
| NASA Space Flight Program and Project Management Requirements w/Changes 1-11 - 8/14/2014 | |
| NASA SPACEFLIGHT HUMAN-SYSTEM STANDARD VOLUME 2: HUMAN FACTORS, HABITABILITY, AND ENVIRONMENTAL HEALTH | |
| NASA Standard for Lightning Launch Commit Criteria for Space Flight | |
| NASA STRATEGIC MANAGEMENT HANDBOOK (SEE NASA NPR 1000.2) | |
| NASA SURVEYS, AUDITS, AND REVIEWS POLICY | |
| NASA Systems Engineering Processes and Requirements w/Change 1 (11/04/09) | |
| NASA Systems Engineering Processes and Requirements w/Chg 1: 3/7/2014 | |
| NASA SYSTEMS ENGINEERING PROCESSES AND REQUIREMENTS | |
| NASA TECHNOLOGY COMMERCIALIZATION POLICY | |
| NASA TECHNOLOGY COMMERCIALIZATION PROCESS (SEE NASA NPR 7500.1) | |
| NONDESTRUCTIVE EVALUATION REQUIREMENTS FOR FRACTURE CRITICAL METALLIC COMPONENTS | |
| NONDESTRUCTIVE EVALUATION REQUIREMENTS FOR FRACTURE-CRITICAL METALLIC COMPONENTS | |
| NOTIFICATION OF INTENT TO DECOMMISSION OR TERMINATE OPERATING SPACE SYSTEMS AND TERMINATE MISSIONS | |
| OCCUPATIONAL SAFETY REQUIREMENTS FOR MSFC CONTRACTORS | |
| OFFICIAL REPRESENTATION FUND (SEE NASA NPR 9050.1) | |
| Orbital Space Transportation Services | |
| PAY POLICY AND ALLOWANCES (SEE NASA NPR 3530.1) | |
| PAYLOAD TEST REQUIREMENTS | |
| PAYLOAD VIBROACOUSTIC TEST CRITERIA | |
| PERFORMANCE BASED REDUCTION IN GRADE OR REMOVAL ACTIONS (SEE NASA NPR 3432.1) | |
| PERSONNEL CERTIFICATION PROGRAM FOR SKILLS With Change 1 (8/11/25) | |
| PERSONNEL CERTIFICATION PROGRAM FOR SKILLS | |
| PHYSICAL SECURITY REQUIREMENTS FOR NASA FACILITIES AND PROPERTY | |
| PHYSICAL SECURITY VULNERABILITY RISK ASSESSMENTS | |
| Pin, Spring, Tubular (Coiled and Slotted) | |
| POLLUTION PREVENTION (SEE NASA NPR 8820.3) | |
| POSITION CLASSFICATION (SEE NASA NPR 3510.5) | |
| Preparation and Handling of Alerts, Safe Alerts and Advisories | |
| Procedural Handbook for NASA Program and Project Management of Problems, Nonconformances, and Anomalies | |
| PROCEDURES AND GUIDELINES FOR PROCESSING REQUESTS FOR ACCESS TO NASA INSTALLATIONS OR FACILITIES BY FOREIGN NATIONALS AND U.S. CITIZENS WHO ARE REPRESENTATIVES OF FOREIGN ENTITIES (SEE NASA NPR 1371.2) | |
| PROCEDURES FOR EXCHANGING PARTS, MATERIALS, AND SAFETY PROBLEM DATA UTILIZING THE GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM AND NASA ADVISORIES(SEE NASA NPR 8735.1) | |
| PROCEDURES FOR USE OF MONETARY GIFTS AND DONATIONS BY NASA (SEE NASA NPR 1210.1) | |
| Process for Limiting Orbital Debris | |
| PROCESSING OF NASA SAFETY REPORTING SYSTEM (NSRS) INCIDENT REPORTS | |
| Procurement, Financial Assistance (updated w/change 1: 10/8/2015) | |
| PROGRAM AND PROJECT LOGISTICS POLICY | |
| PROGRAM AND PROJECT MANAGEMENT | |
| PROGRAM, PROJECT, AND INSTITUTIONAL RISK MANAGEMENT | |
| PROGRAM/PROJECT CONTINUOUS RISK MANAGEMENT | |
| PROGRAM/PROJECT MANAGEMENT | |
| PROJECT MANAGEMENT (SEE NASA GPR 7120.1) | |
| PROTECTIVE COATING OF CARBON STEEL, STAINLESS STEEL, AND ALUMINUM ON LAUNCH STRUCTURES, FACILITIES, AND GROUND SUPPORT EQUIPMENT | |
| PROVISION OF REASONABLE ACCOMMODATION FOR INDIVIDUALS WITH DISABILITIES | |
| PUBLIC APPEARANCES OF NASA ASTRONAUTS AND OTHER PERSONNEL (SEE NASA NPR 1385.1) | |
| PYROSHOCK TEST CRITERIA | |
| RADIO FREQUENCY RADIATION SAFETY | |
| Range Flight Safety Requirements | |
| RECEIVING INSPECTION AND TEST | |
| REDUCTION IN FORCE (RIF) FOR NASA EMPLOYEES (SEE NASA NPR 3351.1) | |
| REQUESTS FOR WAIVERS OF THE RESIDENCE BROAD REQUIREMENTS FOR EXCHANGE VISITORS EMPLOYED BY NASA CONTRACTORS AND GRANTEES (SEE NASA 1371.1) | |
| REQUIREMENTS AND DESIGN REVIEWS, MSFC PROGRAMS AND PROJECTS | |
| REQUIREMENTS FOR PACKAGING, HANDLING, AND TRANSPORTATION ...EQUIPMENT AND ASSOCIATED COMPONENTS (SEE NASA NPR 6000.1) | |
| REQUIREMENTS FOR PACKAGING, HANDLING, AND TRANSPORTATION FOR AERONAUTICAL AND SPACE SYSTEMS, EQUIPMENT, AND ASSOCIATED COMPONENTS | |
| REQUIREMENTS FOR THREADED FASTENING SYSTEMS IN SPACEFLIGHT HARDWARE | |
| RISK MANAGEMENT (SEE NASA GPR 7120.4) | |
| RISK MANAGEMENT PROCEDURES AND GUIDELINES (SEE NASA NPR 8000.4) | |
| Safety and Mission Assurance (SMA) Audits, Reviews, and Assessments | |
| SAFETY AND MISSION ASSURANCE ACRONYMS, ABBREVIATIONS, AND DEFINITIONS | |
| SAFETY AND MISSION ASSURANCE AUDITS, REVIEWS, AND ASSESSMENTS | |
| SAFETY POLICY AND REQUIREMENTS FOR PAYLOADS USING THE SPACE TRANSPORTATION SYSTEM (STS) | |
| SAFETY STANDARD FOR EXPLOSIVES, PROPELLANTS, AND PYROTECHNICS | |
| SAFETY STANDARD FOR FIRE PROTECTION | |
| Schedule Margins and Budget Reserves to be Used In Planning Flight Projects and In Tracking Their Performance | |
| SECURITY OF INFORMATION TECHNOLOGY (FORMERLY NASA NPG 2810.1) | |
| SECURITY OF INFORMATION TECHNOLOGY (SEE NASA NPR 2810.1) | |
| Security Procedures and Guidelines - w/Change 1, 9/6/01 | |
| Security Requirements for Computing Devices | |
| SOFTWARE ASSURANCE AND SOFTWARE SAFETY STANDARD | |
| SOFTWARE ASSURANCE STANDARD | |
| SOFTWARE FORMAL INSPECTIONS STANDARD | |
| Software Independent Verification and Validation (IV Policy) | |
| SOFTWARE SAFETY STANDARD WITH CHANGE 1 DATED 07/28/2004 | |
| SOFTWARE SAFETY STANDARD | |
| SOLDERED ELECTRICAL CONNECTIONS | |
| SPACE ACT AGREEMENTS (SEE NASA NPR 1050.1) | |
| SPACE SYSTEM PROTECTION STANDARD | |
| SPACE TELECOMMUNICATIONS RADIO SYSTEM (STRS) ARCHITECTURE STANDARD RATIONALE | |
| SPACE TELECOMMUNICATIONS RADIO SYSTEM (STRS) ARCHITECTURE STANDARD | |
| SPACECRAFT DYNAMIC ENVIRONMENTS TESTING | |
| SPACECRAFT HIGH-VOLTAGE PASCHEN AND CORONA DESIGN HANDBOOK | |
| SPACECRAFT POLYMERS ATOMIC OXYGEN DURABILITY HANDBOOK | |
| STANDARD FOR LIFTING DEVICES AND EQUIPMENT | |
| STANDARD FOR MODELS AND SIMULATIONS | |
| STANDARD FOR THE DESIGN AND FABRICATION OF GROUND SUPPORT EQUIPMENT | |
| STANDARD MATERIALS AND PROCESSES REQUIREMENTS FOR SPACECRAFT | |
| STRATEGIC MANAGEMENT HANDBOOK | |
| STRENGTH AND LIFE ASSESSMENT REQUIREMENTS FOR LIQUID FUELED SPACE PROPULSION SYSTEM ENGINES | |
| STRENGTH AND LIFE ASSESSMENT REQUIREMENTS FOR LIQUID-FUELED SPACE PROPULSION SYSTEM ENGINES | |
| STRENGTH DESIGN AND VERIFICATION CRITERIA FOR GLASS, CERAMICS, AND WINDOWS IN HUMAN SPACE FLIGHT APPLICATIONS | |
| STRUCTURAL DESIGN AND TEST FACTORS OF SAFETY FOR SPACE FLIGHT HARDWARE | |
| STRUCTURAL DESIGN AND TEST FACTORS OF SAFETY FOR SPACEFLIGHT HARDWARE | |
| SUPPLY SUPPORT AND MATERIAL MANAGEMENT POLICY | |
| SURFACE CLEANLINESS STANDARD OF FLUID SYSTEMS FOR ROCKET ENGINE TEST FACILITIES OF THE NASA ROCKET PROPULSION TEST PROGRAM | |
| SYSTEMS ENGINEERING (CANCELLING NASA GPG 7120.5) | |
| Systems Engineering | |
| Technical Probabilistic Risk Assessment (PRA) Procedures for Safety and Mission Success for NASA Programs and Projects | |
| TECHNICAL REVIEWS AND REVIEW ITEM DISCREPANCY (RID) PROCESSING, MSFC PROGRAMS AND PROJECTS | |
| Technical Standards for NASA Programs and Projects | |
| The International System of Units: Physical constants and conversion factors | |
| THE NASA DIRECTORY SERVICE - ARCHITECTURE, STANDARDS AND PRODUCTS | |
| The NASA Organization w/Changes 1-3 (7/20/01) | |
| TIME AND ATTENDANCE PROCESS | |
| Tobacco Products Vending In NASA Facilities | |
| Transport Layer Security (TLS) Specification | |
| TRANSPORTATION FRINGE BENEFIT PROGRAM FOR EMPLOYEES UTILIZING PUBLIC MASS TRANSPORTATION | |
| Vibration of plates | |
| WELDING OF AEROSPACE GROUND SUPPORT EQUIPMENT AND RELATED NONCONVENTIONAL FACILITIES | |
| Workmanship Manual for Electrostatic Discharge Control (Excluding Electrically Initiated Explosive Devices) | |
| WORKMANSHIP STANDARD FOR CRIMPING, INTERCONNECTING CABLES, HARNESSES, AND WIRING | |
| WORKMANSHIP STANDARD FOR FIBER OPTIC TERMINATIONS, CABLE ASSEMBLIES, AND INSTALLATION | |
| WORKMANSHIP STANDARD FOR POLYMERIC APPLICATION ON ELECTRONIC ASSEMBLIES | |
| WORKMANSHIP STANDARD FOR SURFACE MOUNT TECHNOLOGY |
| << Prev | Next >> |