Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
500
1000
1100
1150
1200
1250
1300
1350
1400
1410
1420
1430
1440
1450
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1470
1480
1490
1500
1510
1520
1550
1600
1620
| Product Name | Notes |
|---|---|
| "RP" CERTIFICATION MARK REQUIRED CODE BOOKS - ASME FIBER-REINFORCED PLASTIC VESSELS CERTIFICATION & ACCREDITATION PACKAGE - INCLUDES ASME BPVC-X AND ASME CA-1 | |
| A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | |
| A Model Process for Maintainability Implementation | |
| A Standardized Approach to Identify and Define Owner Value Interests and Align the E&C Response | |
| Achieving Zero Rework through Effective Supplier Quality Practices, Phase II | |
| Achieving Zero Rework through Effective Supplier Quality Practices | |
| Adaptation of Shipbuilding Production Systems to Construction | |
| Addressing Construction Worker Safety in the Project Design | |
| Advanced Work Packaging: From Project Definition through Site Execution | |
| Air-Sampling Method for Assessing Worker Exposure to Crystalline Silica | |
| An Analysis of Global Procurement and Materials Management Practices in the Construction Industry | |
| An Analysis of Lessons Learned Programs in the Construction Industry | |
| An Analysis of Multiskilled Labor Strategies in Construction | |
| An Analysis of The Impacts of Using Three Dimensional Computer Models in the Management of Construction | |
| An Assessment Tool for Improving Project Team Communications | |
| An Investigation of Field Rework in Industrial Construction | |
| An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | |
| Analysis Supporting Front End Planning for Renovation and Revamp Projects, Part 1 | |
| Analysis Supporting Front End Planning for Renovation and Revamp Projects, Part 2 | |
| Annular Casing Pressure Management for Offshore Wells | |
| Annular Casing Pressure Management for Onshore Wells | |
| API Recommended Practice for Measurement of Multiphase Flow | |
| Application of Lean Manufacturing Principles to Construction | |
| APPLICATION, CARE, AND USE OF WIRE ROPE FOR OIL FIELD SERVICE | |
| Applying Probabilistic Risk Management in Design and Construction Projects | |
| ARM, WINDSHIELD WIPER: BLADE, WINDSHIELD WIPER: AND BLADE REFILL, WINDSHIELD WIPER (VEHICULAR) | |
| ASH RECEIVERS, TOBACCO, (WALL MOUNTED, PARABOLOIDAL, 2 QUART CAPACITY) | |
| Asphalt Hot Mix Emission Study | |
| Assessment of CII Knowledge Implementation at the Organizational Level | |
| Attracting and Maintaining a Skilled Construction Workforce | |
| Attracting, Recruiting, and Retaining Top Quality Construction Leaders/Managers | |
| Automotive Lean Enterprise Conversion - Best Practice Examples | |
| AUTOMOTIVE PAINT SPRAY APPLICATIONS | |
| Avoiding Environmental Cracking in Amine Units | |
| BAND, COPPER, DENTAL | |
| Barriers to Implementation | |
| BASIN, EMESIS; BASIN, WASH; (CORROSION-RESISTING STEEL) | |
| BASIN, EMESIS | |
| BASIN, WASH AND TUB, FOOT, OVAL | |
| BASKETS, WASTEPAPER, METAL (OFFICE AND LOBBY) | |
| BEDPAN | |
| Best Practices for Design in Fast-Track Projects | |
| Best Practices for Preventing Out-of-sequence Construction Activities and Minimizing their Impacts | |
| Best Practices for Project Manager Succession | |
| Best Practices in Quality Management for the Capital Facilities Delivery Industry | |
| BLEACHERS, PORTABLE | |
| BOILERS, KETTLES, AND POTS (ALUMINUM ALLOY) | |
| BOTTLES, VACUUM | |
| BOWL, SURGICAL SPONGE, ALUMINUM AND CORROSION-RESISTING STEEL | |
| BOWLS, FOOD MIXING; BOWL SET (CORROSION-RESISTING STEEL) | |
| BOX, CASH, STEEL | |
| BOX, DOCUMENT, STEEL | |
| BREADBOX, PANTRY; DREDGERS, KITCHEN; AND CANISTERS, FOOD STORAGE | |
| Bucket, Metal Tinned | |
| BUCKETS, MOP, METAL | |
| Calibration and Characterization of Optical Airborne Particle Counters | |
| Calibration Procedures and Guidelines for Select Equipment Used in Testing Cleanrooms and Other Controlled Environments | |
| CALIBRATION PROCEDURES AND GUIDELINES FOR SELECTING EQUIPMENT USED IN TESTING CLEANROOMS AND OTHER CONTROLLED ENVIROMENTS | |
| CANS, ASH AND GARBAGE, CORRUGATED, TAPER-SIDE, ZINC-COATED: AND COVERS | |
| CANS, FLAMMABLE WASTE | |
| CANS, MILK, STEEL TINNED | |
| Case Studies of E-Procurement Initiatives | |
| Case Study Analysis in Support of Front End Planning Implementation | |
| Cast Iron Fatigue Properties Database for Modern Design Methods (DVD) | |
| CHAIN AND ATTACHMENTS, WELDED AND WELDLESS | |
| CHAIN ASSEMBLIES, TIRE: FOR OFF-THE-ROAD VEHICLE | |
| CHAINS AND ATTACHMENTS, CARBON AND ALLOY STEEL | |
| CHAINS AND ATTACHMENTS, WELDED AND WELDLESS | |
| Characteristics of Integrated Project Delivery and Contract Strategies | |
| Cleanroom Cleaning and Sanitization: Operating and Monitoring Procedures | |
| CLEANROOM HOUSEKEEPING: OPERATING AND MONITORING PROCEDURES | |
| CLEANROOM OPERATIONS | |
| CLIMBER SET, TREE AND POLE: STEEL, INTERCHANGEABLE GAFF, W/NYLON-NEOPRENE COATED STRAPS | |
| CLOTH, WIRE, INDUSTRIAL | |
| COFFEE-MAKER, VACUUM | |
| COLANDER, CORROSION-RESISTING STEEL | |
| Commodity vs Value-Added Contractor Services | |
| Considerations for Robotics and Automation in Cleanrooms and Other Controlled Environments | |
| CONSIDERATIONS IN CLEANROOM DESIGN | |
| Construction Industry Craft Training in the United States and Canada | |
| Construction Productivity Research Program - Phase III | |
| Construction Productivity Research Program - Phase IV | |
| Construction Productivity Research Program - Phase V | |
| Construction Technology Needs Assessment Update | |
| CONTAINERS, FLUID, FOR PAINT SPRAY EQUIPMENT | |
| CONTAINERS, FOOD STORAGE; AND TUBS, FOOD PREPARATION (ALUMINUM) | |
| Contracting to Appropriately Allocate Risk | |
| Controlled Environments (Aerospace, Non-cleanroom) | |
| Controlled Environments for Regulated Industries | |
| Controlling Weld Hardness of Carbon Steel Refinery Equipment to Prevent Environmental Cracking | |
| Corrosion Control Documents | |
| COVER, RECEPTACLE, SWINGING DOOR (FOR 55 GALLON METAL DRUMS) | |
| CRADLE, HOSPITAL BED CLOTHING | |
| Craft Productivity Research Program - Phase II | |
| CREATING ORIENTATION PROGRAMS FOR PERSONNEL GOING OFFSHORE | |
| Creating Standards for Industry-wide Quality Metrics | |
| CYLINDER, COMPRESSED GAS: DOT SPECIFICATION 3AA AND ALUMINUM APPLICATIONS FOR CARBON DIOXIDE | |
| CYLINDER, COMPRESSED GAS: DOT SPECIFICATION 3AA AND ALUMINUM APPLICATIONS, FOR INDUSTRIAL SERVICES | |
| CYLINDER, COMPRESSED GAS: DOT SPECIFICATION 3AA AND ALUMINUM APPLICATIONS, FOR MEDICAL SERVICES | |
| Data Analysis in Support of Front End Planning Implementation | |
| Data Analysis on the Implementation of Successful Front End Planning Processes | |
| Deepwater Well Design and Construction | |
| Deflection Method for Designing Asphalt Concrete Overlays for Asphalt Pavements | |
| Deploying Best Practices in Unfamiliar Countries | |
| DESIGN AND INSTALLATION OF BULK STORAGE PLANTS | |
| Design Practices to Facilitate Construction Automation | |
| Design Techniques to Minimize Low-Temperature Asphalt Pavement Transverse Cracking | |
| Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems | |
| Determinants of Jobsite Productivity | |
| Determine Aircraft Supply Air Contaminants in the Engine Bleed Air Supply System on Commercial Aircraft | |
| Determining the Impact of Information Management on Project Schedule and Cost | |
| Determining Virtual Team Performance in the Construction Industry | |
| Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | |
| Development of a Predictive Tool for Continuous Assessment of Project Performance | |
| Development of the International Project Risk Assessment (IPRA) Tool | |
| Development of the Project Definition Rating Index (PDRI) for Building Projects | |
| Development of the Project Definition Rating Index (PDRI) for Infrastructure Projects | |
| Development of the Project Definition Rating Index for Small Industrial Projects | |
| Development of the Project Definition Rating Index for Small Infrastructure Projects | |
| Development of the Value Management Toolkit | |
| Differences Between Petroleum Asphalt, Coal-Tar Pitch and Road Tar | |
| Dimensions of Double-Frame 35-mm 2x2 Slides for Precise Applications in Television | |
| Drill Stem Performance Properties | |
| Effective Use of the Global Engineering Workforce | |
| Elastic and Fatigue Behavior of Emulsified Asphalt Paving Mixes | |
| Electronic Simulation in Construction | |
| ELECTROSTATIC CHARGE IN CLEANROOMS AND OTHER CONTROLLED ENVIRONMENTS | |
| Emissions from Asphalt Roofing Kettles | |
| Engineering Productivity Measurement | |
| Engineering Productivity Measurements II | |
| Enhanced Work Packaging: Design through Workface Execution | |
| Enhancement of the Piping and Instrumentation Diagram Development Process | |
| Enhancing Innovation in the EPC Industry | |
| Estimating as a Competency in Capital Projects | |
| EVALUATING WIPING MATERIALS USED IN CLEANROOMS AND OTHER CONTROLLED ENVIRONMENTS | |
| Examination of the Shipbuilding Industry | |
| Exposure of Paving Workers to Asphalt Emissions | |
| Facility Security Plan Methodology for the Oil and Natural Gas Industries | |
| Factors Impacting Small Capital Project Execution | |
| Factors that Differentiate Reimbursable Contracting from Lump Sum Contracting | |
| Field Verification of Rig Devices for Oil and Gas Well Drilling Operations | |
| Final acts of the European Broadcasting Conference in the VHF and UHF bands | |
| FINAL ACTS of the Regional Administrative Conference for the Planning of the Maritime Radionavigation Service (Radiobeacons) in the European Maritime Area Geneva, 1985 | |
| FINAL ACTS of the Regional Administrative Conference for the Planning of the MF Maritime Mobile and Aeronautical Radionavigation Services (Region 1) Geneva, 1985 | |
| Final acts of the Regional Administrative Conference for the Planning of VHF Sound Broadcasting (Region 1 and Part of Region 3) Geneva, 1984 | |
| Final acts of the Regional Administrative LF/MF Broadcasting Conference (Regions 1 and 3) Geneva, 1975 | |
| Finding Technology Payback Potential | |
| Flash Fire Risk Assessment for the Upstream Oil and Gas Industry | |
| FLEXIBLE PACKAGING MATERIALS FOR USE IN CLEANROOMS AND OTHER CONT. ENV | |
| Forces Affecting Opportunities for Construction Means and Methods R&D in the Public Sector | |
| Forecasting Potential Risks Through Leading Indicators to Project Outcome | |
| FUEL CELL VEHICLES TECHNOLOGY, MARKET, AND POLICY ISSUES | |
| Fundamental Safety Training for Offshore Personnel | |
| Future Construction Needs of Virtual Design Models | |
| GAIN DETERMINATION OF FRONT PROJECTION SCREENS | |
| Garment System Considerations for Cleanrooms and Other Controlled Environments | |
| GARMENTS SYSTEMS CONSIDERATIONS FOR CLEANROOMS AND OTHER CONTROLLED ENVIRONMENTS | |
| Global Project Controls and Management Systems | |
| Globalization: Building a Successful Global Engineering and Construction Company | |
| GLOVES AND FINGER COTS USED IN CLEANROOMS AND OTHER CONTROLLED ENVIRONMENTS | |
| Gloves and Finger Cots Used in Cleanroonts and Other Controlled Environments | |
| Going Beyond Zero Using Safety Leading Indicators | |
| Guide to Measuring Cleanroom Garments | |
| Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries | |
| Guidelines for the Definition of Onshore Gas Gathering Lines | |
| Gulf of Mexico Jackup Operations for Hurricane SeasonInterim Recommendations | |
| HALT and HASS | |
| HEPA AND ULPA FILTER LEAK TESTS | |
| HEPA AND ULPA FILTERS | |
| HIGH-EFFICENCY GAS-PHASE ADSORBER CELLS | |
| HIGH-INTENSITY ACOUSTICS TESTING | |
| IDB-C DATA BUS | |
| Identification and Implementation of Critical Success Factors in the Commissioning and Startup of Capital Projects | |
| Identifying Drivers, Leading Indicators, and Impacts of Premature Starts to Construction: A Quantitative and Qualitative Approach | |
| Identifying Success Factors for High Performance Work Teams | |
| Implementing CII Practices - The Implementation Planning Model: Steps to Success | |
| Improved Workers' Compensation Management in Construction | |
| Improving Capital Projects Supply Chain Performance | |
| Improving Industrial Piping through Vendor Data and Packaged Units Processes | |
| Improving Project Performance by Estimating, Controlling, and Managing Indirect Construction Costs | |
| Improving Project Progress and Performance Assessment by Using Core Project Control Metrics | |
| Improving Site Safety Performance through Operational Excellence, Volume II | |
| Improving Site Safety Performance through Operational Excellence | |
| Improving the Accuracy and Timeliness of Project Outcome Predictions | |
| Industrial Engineering/Manufact uring Techniques for Enhancing Construction Project Performance | |
| Industrial Modularization: How to Optimize; How to Maximize | |
| Information Flow to Support Front End Planning | |
| Information Integration to Improve Capital Project Performance | |
| Innovative Delivery Methods of Information to the Crafts | |
| Innovative Strategies for Contractor Compensation | |
| Inspection and Assessment of Refractory Linings | |
| Installation of Gain Screens | |
| Installation, Operation, and Maintenance of Ammonia Detection Instruments (25-500 ppm Full Scale) | |
| Installation, Operation, and Maintenance of Carbon Monoxide Detection Instruments (50-1000 ppm Full Scale) | |
| Installation, Operation, and Maintenance of Chlorine Detection Instruments (0.5-30 ppm Full Scale) | |
| Installation, Operation, and Maintenance of Instruments Used to Detect Oxygen-Deficient/Oxy gen-Enriched Atmospheres | |
| Installation, Operation, and Maintenance of Toxic Gas-Detection Instruments: Hydrogen Sulfide | |
| Interface Management | |
| Interim Guidance for Gulf of Mexico MODU Mooring Practice2006 Hurricane Season | |
| International Standards: U.S. Construction Industry Competitiveness | |
| Is There a Demographic Labor Cliff that Will Affect Project Performance? | |
| Journal Article Versions (JAV): Recommendations of the NISO/ALPSP JAV Technical Working Group | |
| Kentrack: A Computer Program for Hot-Mix Asphalt and Conventional Ballast Railway Trackbeds | |
| Leadership in a Knowledge Era: Achieving the Learning Organization | |
| Leveraging Technology to Improve Construction Productivity | |
| Low-Temperature Mechanical Properties of Asphalt Concrete | |
| Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | |
| Making Zero Accidents A Reality | |
| Making Zero Rework A Reality: A Comparison of Zero Accident Methodology to Zero Rework and Quality Management | |
| Managed Pressure Drilling Operations - Pressurized Mud Cap Drilling with a Subsea Blowout Preventer | |
| Managed Pressure Drilling Operations with Surface Back-pressure | |
| Managed Pressure Drilling Operations-Surface Back-pressure with a Subsea Blowout Preventer | |
| Managed Pressure Drilling Operations\x97Contro lled Mud Level with a Subsea Blowout Preventer | |
| Management and Technical Guidelines for the Environmental Stress Screening (ESS) Process | |
| MANAGEMENT AND TECHNICAL GUIDELINES FOR THE ESS PROCESS | |
| Management Practices, Self-Assessment Process, and Resource Materials | |
| MANAGEMENT PRACTICES: SELF-ASSESSMENT PROCESS RESOURCE MATERIALS | |
| Managing a Portfolio of Projects - Metrics for Improvement | |
| Managing Uncertainty in the Piping Function | |
| Materials and Fabrication of 1 1/4Cr-1/2Mo Steel Heavy Wall Pressure Vessels for High-pressure Hydrogen Service Operating at or Below 825 \xb0F (441 \xb0C) | |
| Materials and Fabrication of 2 1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High-pressure Hydrogen Service | |
| Materials and Fabrication Requirements for 2-1/4Cr-1Mo and 3Cr-1Mo Steel Heavy Wall Pressure Vessels for High Temperature, High Pressure Hydrogen Service | |
| Maximizing Engineering Value | |
| MEASURING AND REPORTING VIBRATION IN MICROELECTRONICS FACILITIES | |
| Measuring and Reporting Vibrations in Advanced-Technology Facilities | |
| Measuring Project Complexity and Its Impact | |
| Mechanical Shock and Vibration Accelerometer Selection | |
| Mechanical Shock and Vibration Transducer | |
| METHOD FOR CHARACTERIZING OUTGASSED ORGANIC COMPOUNDS FROM CLEANROOM MATERIALS AND COMPONENTS | |
| MICROORGANISMS IN CLEANROOMS | |
| MINIENVIRONMENTS | |
| Mitigating Threats of Counterfeit Materials in the Capital Projects Industry | |
| Modeling Strategies for Instantaneous Project Controls | |
| Modeling the Lessons Learned Process | |
| Multi-shaker Test and Control | |
| Multiskilling Labor Strategies in Construction: Experiences with Multiskilling Labor Strategies in the Construction Industry | |
| Multiskilling Labor Strategies in Construction: Implementation of Multiskilling in the Construction Industry | |
| Nanotechnology and its Impact on Construction | |
| Nanotechnology Safety: Application of Prevention through Design Principles to Nanotechnology Facilities | |
| Navy Demonstration Project: Testbed for Selected CII Principles | |
| Onshore Well Construction Interface Document | |
| Onsite Design | |
| Optimizing Construction Input in Front End Planning | |
| Optimizing Project Organizations | |
| Owner and Contractor Job Site Organizations | |
| Owner/Contractor Work Structure: A Process Approach | |
| PEpC: A Breakthrough Project Delivery System that Improves Performance by Reforming Owner, Contractor, Supplier Relationships | |
| Personal Protective Equipment Selection for Oil Spill Responders | |
| PERSONNEL PRACTICES AND PROCEDURES IN CLEANROOMS AND CONTROLLED ENVIRONMENTS | |
| Planning for Recovery from Disruption to Cleanrooms and Other Controlled Environments | |
| Planning for Startup: Analysis of the Planning Model and Other Success Drivers | |
| Planning for, Facilitating, and Evaluating Design Effectiveness | |
| Planning of Nanoscale Science and Technology Facilities: Guidelines for Design, Construction, and Start-up | |
| Precursor Analysis for the Construction Industry: A Systematic Method for Predicting and Preventing Fatal and Disabling Injuries | |
| Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | |
| Prevention of Brittle Fracture of Pressure Vessels | |
| PROCEDURES FOR INSPECTION, MAINTENANCE, REPAIR, AND REMANUFACTURE OF DRILLING EQUIPMENT | |
| Product Integrity Concerns in Low-cost Sourcing Countries: Counterfeiting within the Construction Industry | |
| Productivity Research Program - Phase I | |
| Project Definition Rating Index (PDRI) for Industrial Projects | |
| Project Delivery and Contract Strategy | |
| Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build | |
| Project Management Skills of the Future | |
| Project Site Leadership Role in Improving Construction Safety | |
| Project-Specific Employee Incentives | |
| Properties of Asphalt Cements | |
| PYROSHOCK TESTING TECHNIQUES | |
| Qualifications for Organizations Engaged in the Testing and Certification of Cleanrooms and Clean-Air Devices | |
| Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | |
| Quantitative Measurement of Project Manager Competencies | |
| Radical Reduction in Project Cycle Time | |
| Radio Frequency Identification Tagging: Applications for the Construction Industry | |
| Re-Engineering the EPC Process | |
| Real-time, Pro-active Safety in Construction | |
| Recommended Practice for Design and Maintenance of Roadway and Parking Facility Lighting | |
| Recommended Practice for Drill Stem Design and Operating Limits | |
| RECOMMENDED PRACTICE FOR DRILLING MACHINERY | |
| Recommended Practice for Field Analysis of Crude Oil Samples Containing from Two to Fifty Percent Water by Volume | |
| Recommended Practice for Hoisting Tool Inspection and Maintenance Procedures | |
| Recommended Practice for Inspection and Classification of Used Drill Stem Elements | |
| RECOMMENDED PRACTICE FOR INSTALLATION, MAINTENANCE, AND OPERATION OF INTERNAL-COMBUSTION ENGINES | |
| Recommended Practice for Materials and Fabrication of 11/4CR-1/2Mo Steel Pressure Vessels for Service Above 825 \xb0F (440 \xb0C) | |
| Recommended Practice for Procedures for Inspections, Maintenance, Repair, and Remanufacture of Hoisting Equipment | |
| Recommended Practice for Qualification Programs for Offshore Production Personnel Who Work with Anti-pollution safety devices | |
| RECOMMENDED PRACTICE FOR TESTING OF THREAD COMPOUND FOR ROTARY SHOULDERED CONNECTIONS | |
| RECOMMENDED PRACTICE FOR TRAINING AND QUALIFICATION OF PERSONNEL IN WELL CONTROL EQUIPMENT AND TECHNIQUES FOR DRILLING ON OFFSHORE LOCATIONS FIRST EDITION | |
| RECOMMENDED PRACTICE FOR TRAINING OF PERSONNEL IN RESCUE OF PERSONS IN WATER FIRST EDITION | |
| RECOMMENDED PRACTICE ON APPLICATION CARE, AND USE OF WIRE ROPE FOR OIL FIELD SERVICE | |
| RECOMMENDED PRACTICE: LIGHTING HOSPITALITY SPACES | |
| Recommended Practices for Installation of Bulk Storage Plants | |
| RECOMMENDED PRACTICES FOR REFINERY INSPECTIONS PART I-PROCESS EQUIPMENT | |
| RECOMMENDED PRACTICES FOR REFINERY INSPECTIONS PART II-PRESSURE-RELIEVIN G DEVICES | |
| RECOMMENDED PRACTICES FOR REFINERY INSPECTIONS PART III - FIRE-PROTECTION EQUIPMENT | |
| RECOMMENDED PRACTICES FOR REFINERY INSPECTIONS PART IV-LOW-PRESSURE STORAGE TANKS | |
| RECOMMENDED PRACTICES FOR REFINERY INSPECTIONS PART V-INSTRUMENTS | |
| Recommended Practices for the Inspection and Maintenance of UST Systems | |
| Recommended Practices Package | |
| Reference Carrier Frequencies and Preemphasis Characteristics for 1-in Type B Helical-Scan Television Analog Recording | |
| Refractory Installation Quality Control Guidelines-Inspectio n and Testing Monolithic Refractory Linings and Materials | |
| Report on Aeronautical Radio Frequency Systems, their Regulatory Framework, and Operational Considerations | |
| Report on Aviation Data Security | |
| Report on Information Security Management System (ISMS) for Aviation Organizations | |
| Report on Scoping Planned Changes to DO-367 | |
| Requirements for Recording American National Standard Time and Control Code on 1-in Type B Helical-Scan Video Tape Recorders | |
| Retro Rockets | |
| Revolutions Per Kilometer Table of Contents | |
| Roadmap for Lean Implementation at the Project Level | |
| Roadway Lighting | |
| RR-25 Vapor-Liquid Equilibrium of the CH4-CO2 System at Low Temperatures | |
| Safe Use of 2-inch Hammer Unions for Oilfield Applications | |
| Sizing and Counting of Submicrometer Liquid-borne Particles Using Optical Discrete-particle Counters | |
| Specifications for 16-mm Projector Alignment and Screen Image Quality Test Film | |
| Specifications for 70-mm Projector Alignment and Screen Image Quality Test Film | |
| Specifications for Audio Level and Multifrequency Test Films for 8-mm Type S Audio Reproducers, Magnetic Type | |
| Specifications for Flutter Test Film for 35-mm Audio Reproducers, Photographic Type | |
| Specifications for Flutter Test Film for 35-mm Four-Track Striped Release Print Audio Reproducers, Magnetic Type | |
| Specifications for Scanning-Beam Uniformity Test Film for 16-mm Motion-Picture Photographic Audio Reproducers | |
| Specifications of Tracking-Control Record for 1-in Type B Helical-Scan Television Analog Recording | |
| Starting from Scratch: A New Project Delivery Paradigm | |
| State-of-Practice in Maintainability: Seven Case Studies | |
| State-of-Practice of E-Commerce Application in the Construction Industry | |
| Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants | |
| Strategies for Improving Hazard Recognition | |
| Study of Engineering/Design Deliverable Quality | |
| Study of Sustainability Opportunities during Construction | |
| SUBSTRATES AND FORMS FOR DOCUMENTATION | |
| Successful Delivery of Flash Track Projects | |
| Successful Delivery of Mega-projects | |
| Supervisory Development for the Construction Industry | |
| Survey of Radio Frequency (RF) Performance Standards for Aeronautical RF Systems | |
| Susceptibility of Airborne Weather Radar Systems to Radio Frequency Interference | |
| Sustainable Industrial Construction | |
| Target Safety: Programs Focused on Preventing Specific Hazards | |
| Team Alignment During Pre-Project Planning of Capital Facilities | |
| TESTING CLEANROOMS | |
| Testing Fan Filter Units | |
| TESTING HEPA AND ULPA FILTER MEDIA | |
| Testing HEPA and ULPA Filters | |
| TESTING ULP FILTERS | |
| Testing ULPA Filters Arlington Place | |
| The Effectiveness of Innovative Crew Scheduling Techniques | |
| The Maturity and Accuracy of Front End Engineering Design (FEED) and Its Impact on Project Performance | |
| The Owner's Role in Construction Safety | |
| The Owner's Role in Project Success | |
| The Partnering Process\x97 its Benefits, Implementation, and Measurement | |
| THE RATE OF DEPOSITION OF NONVOLATILE RESIDUE IN CLEANROOMS | |
| The Tier I Workforce Management Strategy: Concept and Application | |
| The True Impacts of Late Deliverables at the Construction Site | |
| Thermodynamic Properties of CO2 + C2H6 Mixtures | |
| Thermodynamic Properties of CO2 + CH4 Mixtures | |
| Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process for the Management of Construction | |
| Trade-Off Between Cost and Schedule | |
| Training and Qualification of Personnel in Well Control Equipment and Techniques for Wireline Operations in Offshore Location | |
| TRAINING OF OFFSHORE PERSONNEL IN NONOPERATING EMERGENCIES | |
| Transferring Experiential Knowledge from the Near-Retirement Generation to the Next Generation | |
| Transforming the Industry: Advanced Work Packaging as a Standard (Best) Practice | |
| Tripping Operations in Hydrostatically Overbalanced Wells | |
| UL Standard for Safety Recommended Practice for Nameplates for Use in Electrical Installations | |
| Underbalanced Drilling Operations | |
| Understanding, Identifying, and Controlling Electrostatic Charge in Cleanrooms and Other Controlled Environments | |
| Unidirectional-Flow, Clean-Air Devices | |
| Use of Subsea Wet-gas Flowmeters in Allocation Measurement Systems | |
| USING MIL-STD-810 (F), 519 GUNFIRE | |
| Using Near Miss Reporting to Enhance Safety Performance | |
| UST INSPECTION AND MAINTENANCE | |
| Vacuum Cleaning Systems for Use in Cleanrooms and Other Controlled Environments | |
| Vibration Controller Selection | |
| VIBRATION SHAKER SYSTEM SELECTION | |
| Virtual Teams: A Guide to Successful Implementation | |
| Wireless Communication and Computing at the Construction Jobsite | |
| Work Force View of Construction Labor Productivity |
| << Prev | Next >> |