Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
500
1000
1200
1250
1300
1350
1400
1450
1470
1480
1490
1500
1510
1520
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1550
1560
1570
1580
1590
1600
1620
| Product Name | Notes |
|---|---|
| 270 VDC SOLID STATE GROUND POWER UNIT | |
| 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER | |
| 540 Degrees C and 760 Degrees C Industrial Chimneys | |
| 540\xb0C AND 760\xb0C INDUSTRIAL CHIMNEYS | |
| [BASE COURSE FOR RIGID] [AND] [SUBBASES FOR FLEXIBLE] PAVING | |
| [SEISMIC] BRACING FOR HVAC | |
| ABOVEGROUND FUEL OIL STORAGE TANKS | |
| Aboveground Non-Metallic Tanks for Fuel Oil | |
| Absorbents for Flammable and Combustible Liquids | |
| ACCESS CONTROL POINT CONTROL SYSTEM | |
| ACTIVATED CARBON-GAS AND LIQUID PURIFICATION FILTERS | |
| Adhesives for Use in Heating and Cooling Appliances to Secure Thermal Insulation Materials | |
| ADJUSTABLE DROP NIPPLES FOR SPRINKLER SYSTEMS | |
| AGGREGATE BASE COURSES | |
| AGGREGATE SURFACING | |
| AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS | |
| AIRCRAFT TIEDOWNS | |
| AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS | |
| AIRFIELD GROUNDING | |
| ASPHALT SURFACE TREATMENT | |
| ASPHALTIC SEAL AND FOG COATS | |
| AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH | |
| AVIATION FUEL CONTROL VALVES | |
| AVIATION FUEL DISTRIBUTION SYSTEM START-UP | |
| AVIATION FUEL MECHANICAL EQUIPMENT | |
| AVIATION FUEL PANTOGRAPHS | |
| AVIATION FUEL PIPING | |
| AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (CUT AND COVER TANKS) | |
| AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (TYPE [IV][V]) | |
| AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM | |
| AVIATION FUEL PUMPS | |
| AWS User\xb4s Guide to Filler Metals | |
| BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS | |
| BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC | |
| BASE COURSE DRAINAGE LAYERS | |
| BASIC MECHANICAL MATERIALS AND METHODS | |
| BITUMINOUS PAVEMENT LIQUID REJUVENATING | |
| BITUMINOUS TACK AND PRIME COATS | |
| BITUMINOUS-STABILIZE D BASE AND SUBBASE COURSES | |
| BITUMINOUS-STABILIZE D SUBGRADE | |
| BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING | |
| BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING | |
| BUILDING HEATING SYSTEMS, WARM AIR | |
| CENTRAL COAL-FIRED STEAM-GENERATING SYSTEM | |
| CENTRAL HIGH TEMPERATURE WATER (HTW) GENERATING PLANT AND AUXILIARIES | |
| CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED | |
| CENTRAL STEAM HEATING AND UTILITIES SYSTEMS | |
| CENTRAL STEAM-GENERATING SYSTEM, COAL-FIRED | |
| CHAIN LINK FENCES AND GATES | |
| CHECK VALVES FOR FIRE-PROTECTION SERVICE | |
| CHEMICAL TERMITE CONTROL | |
| CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR) AIR FILTRATION SYSTEM | |
| CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS | |
| CHLORINE GAS FEED EQUIPMENT | |
| CIRCULAR CLARIFIER EQUIPMENT | |
| CLEANING OF PETROLEUM STORAGE TANKS | |
| CLEANING PETROLEUM STORAGE TANKS | |
| CLEARING AND GRUBBING | |
| COLD MILLING ASPHALT PAVING | |
| COLD-MIX ASPHALT PAVING | |
| COLD-MIX REUSED ASPHALT PAVING | |
| COMBUSTIBLE PIPING FOR SPRINKLER SYSTEMS | |
| COMMERCIAL WOOD-FIRED BAKING OVENS \x96 REFRACTORY TYPE | |
| Commercial-Industria l Gas-Fired Package Boilers | |
| COMMON WORK RESULTS FOR ELECTRICAL | |
| Composite Fire Logs | |
| COMPOSITE FIRE-LOG STARTERS | |
| COMPRESSED GASES STORAGE TANKS | |
| COMPRESSION CONCRETE PAVING JOINT SEALANT | |
| COMPUTER ROOM AIR CONDITIONING UNITS | |
| CONCRETE CURBS, GUTTERS AND SIDEWALKS | |
| Concrete Encased Steel Aboveground Tank Assemblies for Flammable and Combustible Liquids | |
| CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS | |
| CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS | |
| CONCRETE PAVING RAISING | |
| CONCRETE SIDEWALKS AND CURBS AND GUTTERS | |
| CONCRETE TRENCH HYDRONIC AND STEAM ENERGY DISTRIBUTION | |
| CONNECTORS AND SWITCHES FOR USE WITH BURGLAR ALARM SYSTEMS | |
| CONTAINED VERTICAL STEEL ABOVEGROUND TANK ASSEMBLIES FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS | |
| COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS | |
| CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS | |
| CUSTOM-PACKAGED, AIRCRAFT PRE-CONDITIONED AIR UNITS | |
| CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS | |
| CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEMS | |
| D\xc9TECTEURS DE FUM\xc9E DES R\xc9SEAUX AVERTISSEURS D\x92INCENDIE | |
| DECENTRALIZED UNITARY HVAC EQUIPMENT | |
| DESICCANT COOLING SYSTEMS | |
| DOOR CLOSERS AND HOLDERS | |
| Double Containment Fibre Reinforced Plastic Linings for Flammable and Combustible Liquid Storage Tanks | |
| DOWNFLOW LIQUID ACTIVATED CARBON ADSORPTION UNITS | |
| DRAINAGE FIELD DOSING CHAMBERS | |
| DRILLED CONCRETE PIERS AND SHAFTS | |
| Ducted Flexible Underground Piping Systems for Flammable and Combustible Liquids | |
| EARLY-SUPPRESSION FAST-RESPONSE SPRINKLERS | |
| ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC | |
| ELECTRIC METERS | |
| ELECTROMECHANICAL OPERATING MACHINERY FOR LOCKS AND DAMS | |
| ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING | |
| ELECTRONIC SECURITY SYSTEMS (ESS) | |
| EMBANKMENT FOR EARTH AND ROCKFILL DAMS | |
| ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES | |
| EVAPORATIVE COOLING SYSTEM | |
| Exterior Insulation and Finish Systems (EIFS) | |
| EXTERIOR LIGHTING | |
| EXTERIOR PLANTS | |
| FACILITY GAS PIPING | |
| FACTORY-FABRICATED FUEL STORAGE TANKS | |
| FILTER SEPARATOR, AVIATION FUELING SYSTEM | |
| FIRE TEST FOR HEAT AND VISIBLE SMOKE RELEASE FOR DISCRETE PRODUCTS AND THEIR ACCESSORIES INSTALLED IN AIR-HANDLING SPACES | |
| Fire Testing of Restaurant Cooking Area Fire Extinguishing System Units | |
| FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEMS (DAS) | |
| FIXED CONDENSED AEROSOL EXTINGUISHING SYSTEM UNITS | |
| FLAME DETECTORS | |
| FLAT-PLATE PHOTOVOLTAIC MODULES AND PANELS | |
| FLEXIBLE METALLIC HOSE | |
| FLOOD LIGHTING | |
| FORCED HOT WATER HEATING SYSTEMS USING WATER AND STEAM HEAT EXCHANGERS | |
| FOUNDATION DRAINAGE | |
| FRP COMPOSITES FOR LOW-HEAD WATER CONTROL STRUCTURES | |
| FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT) | |
| FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-HYDRANT) | |
| FUEL SYSTEM COMPONENTS (NON-HYDRANT) | |
| FUEL SYSTEMS PIPING (NON-HYDRANT) | |
| FUEL SYSTEMS PIPING (SERVICE STATION) | |
| GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES | |
| Gas Vent Connectors | |
| GAS-FIRED COMBINED HEAT AND POWER APPLIANCES (mCHP) | |
| GAS-FIRED HEATING EQUIPMENT | |
| GASOLINE/DIESEL DISPENSING SYSTEMS | |
| Gate Valves for Fire-Protection Service | |
| GILSONITE MODIFIED ASPHALT EMULSION SEAL COATS | |
| Glass-Fibre Reinforced Plastic Pipe and Fittings for Flammable and Combustible Liquids | |
| GREASE INTERCEPTORS | |
| GRIT REMOVAL AND HANDLING EQUIPMENT | |
| GROOVING OF AIRFIELD PAVING | |
| GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS | |
| GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY | |
| Guards for Sprinklers | |
| GUIDE FOR THE INVESTIGATION OF DRAFT EQUIPMENT | |
| GUIDE FOR THE INVESTIGATION OF FACTORY-BUILT WATER HEATING GASIFICATION APPLIANCES | |
| GUIDE FOR THE INVESTIGATION OF FLAME ARRESTERS FOR USE ON VENTS OF STORAGE TANKS FOR PETROLEUM OIL AND GASOLINE | |
| Guide for the Investigation of Gas Pressure Regulators | |
| GUIDE FOR THE INVESTIGATION OF GAUGES, INDICATING PRESSURE FOR COMPRESSED GAS SERVICE | |
| GUIDE FOR THE INVESTIGATION OF HIGH-PRESSURE GAS MANIFOLDS | |
| GUIDE FOR THE INVESTIGATION OF LP-GAS VAPORIZERS | |
| GUIDE FOR THE INVESTIGATION OF PIPE CONNECTORS FOR FLAMMABLE LIQUIDS AND LP-GAS | |
| GUIDE FOR THE INVESTIGATION OF PLANT OIL EXTRACTION EQUIPMENT | |
| GUIDE FOR THE INVESTIGATION OF PRESSUREREGULATING VALVES | |
| GUIDE FOR THE INVESTIGATION OF PUMPS FOR OILBURNING APPLIANCES | |
| Guide for the Investigation of Strainers for Flammable Fluids and Anhydrous Ammonia | |
| Guide for the Investigation of Valves for Flammable and Combustible Liquids | |
| HALON AND HALOCARBON CLEAN AGENT RECOVERY AND RECONDITIONING EQUIPMENT | |
| HEAT RECOVERY BOILERS | |
| HEATER SCARIFYING OF ASPHALT PAVING | |
| HEATING BOILERS | |
| HIGH TEMPERATURE CONCRETE PAVING FOR AIRFIELDS USING LIGHTWEIGHT AND TRAPROCK AGGREGATES | |
| HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICES | |
| HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES | |
| HOT-MIX ASPHALT AIRFIELD PAVING | |
| HOT-MIX BITUMINOUS BASE COURSE FOR ROADS AND STREETS | |
| HVAC AIR DISTRIBUTION | |
| HVAC SYSTEM CLEANING | |
| HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES | |
| HYDRAULIC POWER SYSTEMS | |
| HYDRAULIC STANDARD FOR INDUSTRIAL EQUIPMENT | |
| HYDRONIC PUMPS | |
| IMPRESSION MATERIAL (MODELING COMPOUND), DENTAL | |
| IMPRESSION MATERIAL, (AGAR TYPE) | |
| IMPRESSION MATERIAL, DENTAL (ZINC-OXIDE EUGENOL PASTE) | |
| IMPRESSION MATERIAL, DENTAL HYDROCOLLOID, ALGINATE TYPE | |
| IN PLACE HOT REUSED ASPHALT PAVING | |
| IN-GROUND BOXES | |
| INDICATING PRESSURE GAUGES FOR FIRE PROTECTION SERVICE | |
| INDUSTRIAL VENTILATION AND EXHAUST | |
| Installation of Aftermarket Automobile Theft Deterrent Devices | |
| Installation of Field Assembled Skeletal Neon Signs and Outline Lighting | |
| INSTRUMENTATION AND CONTROL DEVICES FOR HVAC | |
| INSTRUMENTATION AND CONTROL FOR HVAC | |
| INSULATED WIRE AND CABLE | |
| INTERIOR DISTRIBUTION SYSTEM | |
| INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM | |
| INTERIOR LIGHTING | |
| INTERLOCKING PRECAST CONCRETE UNIT PAVING | |
| INTRAVENOUS SOLUTIONS, 1000 MILLILITER CONTAINER | |
| Intrusion Detection Units | |
| INVESTMENT, DENTAL, CASTING GOLD ALLOY | |
| INVESTMENT, SOLDERING, DENTAL | |
| IRRIGATION SPRINKLER SYSTEMS | |
| Jacketed Steel Underground Tanks for Flammable and Combustible Liquids | |
| LANDFILL GAS SYSTEMS | |
| LANDSCAPE ESTABLISHMENT | |
| Leak Detection Devices (Volumetric Type) for Underground Flammable Liquid Storage Tanks | |
| LEAK DETECTION FOR FUELING SYSTEMS | |
| LEAN CONCRETE BASE COURSE | |
| LEVEE CONSTRUCTION | |
| LIGHT EMITTING DIODE (LED) EQUIPMENT FOR USE IN LIGHTING PRODUCTS | |
| LIGHT WALL STEEL PIPES FOR SPRINKLER SYSTEMS FOR FIRE PROTECTION SERVICE | |
| LIGHTING CONTROL DEVICES | |
| LIME TREATED SUBGRADE | |
| Line Leak Detection Devices for Flammable Liquid Piping | |
| LIQUID LEVEL GAUGES AND INDICATORS FOR FUEL OIL AND LUBRICATING OIL TANKS | |
| LIVE WORKING \x96 FLAME-RESISTANT MATERIALS FOR CLOTHING FOR THERMAL PROTECTION OF WORKERS \x96 THERMAL HAZARDS OF AN ELECTRIC ARC \x96 PART 1: TEST METHODS | |
| LIVE WORKING \x96 PORTABLE PHASE COMPARATORS FOR USE ON VOLTAGES FROM 1 kV TO 36 kV a.c. | |
| LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS | |
| LOW PRESSURE WATER HEATING BOILERS (OVER 800,000 BTU/HR OUTPUT) | |
| LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR OUTPUT) | |
| LOW-VOLTAGE MOTORS | |
| LOW-VOLTAGE SWITCHGEAR | |
| M\xc9THODE D'ESSAI NORMALIS\xc9E DE R\xc9SISTANCE AU FEU POUR LES DIFFUSEURS ET VERRES D'APPAREILS D'\xc9CLAIRAGE | |
| MACHINE AND EQUIPMENT GUARDS DESIGN AND REFERENCE DATA | |
| MANUAL PUMPS FOR USE WITH LIQUID PETROLEUM FUELS | |
| MAT\xc9RIEL DE R\xc9CUP\xc9RATION ET DE REMISE EN \xc9TAT DES AGENTS PROPRES \xc0 L'HALOCARBURE ET AU HALON | |
| MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS | |
| MEDIUM-VOLTAGE CABLES | |
| MEDIUM-VOLTAGE SURGE ARRESTERS | |
| Meters for Flammable and Combustible Liquids and Propane | |
| MONORAIL HOISTS | |
| MONORAILS WITH ELECTRIC,AIR, OR MANUAL POWERED HOIST | |
| MOTOR CONTROL CENTERS | |
| NATURAL GAS AND LIQUID PETROLEUM PIPING | |
| NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION | |
| NONMETALLIC BULK CONTAINERS FOR THE STORAGE AND DISPENSING OF COMBUSTIBLE AND NON-COMBUSTIBLE LIQUIDS | |
| NONMETALLIC TANKS FOR OIL-BURNER FUELS AND OTHER COMBUSTIBLE LIQUIDS | |
| Nonmetallic Underground Piping for Flammable and Combustible Liquids | |
| Nonvolumetric Leak Detection Devices for Underground Flammable Liquid Storage Tanks | |
| NORMALIZING AND ANNEALING OF STEEL FORGINGS | |
| NORME SUR LES POSTES DE CONTR\xd4LE POUR LES R\xc9SEAUX AVERTISSEURS D\x92INCENDIE | |
| NURSE CALL SYSTEM | |
| OFF-GAS FANS, BLOWERS AND PUMPS | |
| OVERCURRENT PROTECTIVE DEVICES | |
| Overfill Protection Devices for Flammable Liquid Storage Tanks | |
| OVERHEAD TRANSMISSION AND DISTRIBUTION | |
| PACKAGED UTILITY WASTEWATER PUMPING STATIONS | |
| PACKAGED WASTEWATER TREATMENT EQUIPMENT, AERATION | |
| PACKAGED WASTEWATER TREATMENT EQUIPMENT | |
| PACKAGED WATER CHILLERS, ABSORPTION TYPE | |
| PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS | |
| PANELBOARDS | |
| PANIC HARDWARE | |
| PARTIAL DEPTH PATCHING OF RIGID PAVING | |
| PAVEMENT MARKINGS | |
| PAVING FABRIC INTERLAYER | |
| PELLET FUEL BURNING COOKING APPLIANCES | |
| Pellet Vents | |
| PERVIOUS CONCRETE PAVING | |
| Photoluminescent and Self-Luminous Exit Signs | |
| PIPE HANGER EQUIPMENT FOR FIRE PROTECTION SERVICE | |
| PIPELINE STRAINERS | |
| PIPELINES, LIQUID PROCESS PIPING | |
| PIPING AND COUPLINGS, POLYVINYL CHLORIDE (PVC) FOR UNDERGROUND FIRE SERVICE | |
| PIPING; OFF-GAS | |
| PLAYGROUND PROTECTIVE SURFACING | |
| POL SERVICE PIPING WELDING | |
| POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES | |
| POLYMERIC PILES | |
| POLYVINYLIDENE FLUORIDE (PVDF) CORROSIVE DRAINAGE SYSTEMS | |
| POND AND RESERVOIR LINERS | |
| PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES | |
| PORTLAND CEMENT-STABILIZED BASE COURSES | |
| POTABLE WATER SUPPLY WELLS | |
| POWER FACTOR CORRECTION EQUIPMENT | |
| PRECAST CONCRETE TANKS | |
| PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION | |
| PRELIMINARY STANDARD FOR BUTTERFLY VALVES FOR FIRE PROTECTION SERVICE | |
| Preliminary Standard for Concrete Masonry Units | |
| PRELIMINARY STANDARD FOR HOUSEHOLD BURGLAR ALARM SYSTEM UNITS | |
| Preliminary Standard for Sliding Hardware for Standard, Horizontally Mounted Tin-Clad Fire Doors | |
| Preliminary Standard for Swinging Hardware for Standard Tin-Clad Fire Doors Mounted Singly and in Pairs | |
| Pressure Pipe and Couplings, Glass Fiber- Reinforced, for Underground Fire Service | |
| PRESSURE-REGULATING VALVES | |
| PRIMARY UNIT SUBSTATION | |
| PROCESS CONTROL | |
| Proprietary Burglar Alarm Units and Systems | |
| PUBLIC ADDRESS SYSTEMS | |
| RADON MITIGATION | |
| RECTANGULAR STEEL ABOVEGROUND TANKS FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS | |
| REFRIGERATION EQUIPMENT FOR COLD STORAGE | |
| RELINING SEWERS | |
| REMOTE BURGLAR ALARM SIGNALLING CENTRES | |
| REQUIREMENTS FOR THE INVESTIGATION OF STAPLER NON-METALLIC SHEATHED CABLE STAPLES | |
| RESEALING OF JOINTS IN RIGID PAVEMENT | |
| RESIN-MODIFIED ASPHALT PAVING WEARING COURSES | |
| ROADWAY LIGHTING | |
| ROOM FIRE TEST METHOD FOR GARAGE DOORS USING FOAMED PLASTIC INSULATION | |
| RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS | |
| RUBBER GASKETED FITTINGS FOR FIRE PROTECTION SERVICE | |
| SAFETY CONTAINERS | |
| Safety Relief Valves for Anhydrous Ammonia and Propane | |
| SAFETY STANDARD FOR DIAGNOSTIC ULTRASOUND EQUIPMENT REVISION 1 - MARCH 1982 | |
| SALT BATH MOLTEN - SAFETY PRECAUTIONS IN OPERATION OF SCOPE AND AIM | |
| SANITARY SEWER FORCE MAIN PIPING | |
| SANITARY SEWERS | |
| SEALING CRACKS IN ASPHALT PAVING | |
| SECONDARY CONTAINMENT LINERS FOR UNDERGROUND AND ABOVEGROUND FLAMMABLE AND COMBUSTIBLE LIQUID TANKS | |
| SECONDARY CONTAINMENTS FOR ABOVEFROUND FLAMMABLE AND CONBUSTIBLE LIQUID STORAGE TANKS | |
| SECONDARY UNIT SUBSTATIONS | |
| SEEDING | |
| SEGMENTAL CONCRETE BLOCK RETAINING WALL | |
| SELF-LUBRICATED MATERIALS, FABRICATION, HANDLING, AND ASSEMBLY | |
| SEQUENCES OF OPERATION FOR HVAC CONTROL | |
| SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR | |
| SINGLE AND MULTIPLE STATION HEAT ALARMS | |
| SINGLE OPERATION GENERATOR SETS | |
| SINGLE WALL ABOVEGROUND FIXED ROOF STEEL POL STORAGE TANK | |
| SINGLE WALL POL TANK UNDERTANK INTERSTITIAL SPACE | |
| SINGLE-PHASE PAD-MOUNTED TRANSFORMERS | |
| SMOKE CONTROL SYSTEM EQUIPMENT | |
| Smoke-Alarms for Mobile Homes and Recreational Vehicles | |
| SOIL SURFACE EROSION CONTROL | |
| SOLAR PHOTOVOLTAIC SYSTEMS | |
| Space Heaters for Use with Particulate Solid Fuels | |
| SPACE TEMPERATURE CONTROL SYSTEMS | |
| SPECIAL CORROSION PROTECTION UNDERGROUND TANKS FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS | |
| SPECIAL PURPOSE RELOCATABLE ABOVEGROUND VERTICAL TANKS FOR FLAMMABLE AND COMBUSTIBLE LIQUIDS | |
| SPEED REDUCERS FOR STORM WATER PUMPS | |
| Spill Containment Devices for Aboveground Flammable and Combustible Liquid Storage Tanks | |
| Spill Containment Devices for Underground Flammable Liquid Storage Tanks | |
| SPRAY NOZZLES FOR FIRE-PROTECTION SERVICE | |
| SPRIGGING | |
| SPRINKLER-PROTECTED WINDOW SYSTEMS | |
| Standard Corner Wall Method of Test for Flammability Characteristics of Non-Melting Building Materials | |
| Standard for Audible Signal Devices for Fire Alarm Systems | |
| STANDARD FOR BURGLARY RESISTANT COMBINATION LOCKS | |
| Standard for Burglary Resistant Electronic Combination Locks | |
| STANDARD FOR BURGLARY RESISTANT KEY LOCKS | |
| Standard for Burglary Resistant Night Depositories | |
| STANDARD FOR BURGLARY RESISTANT SAFES | |
| Standard for Burglary Resisting Glazing Material | |
| Standard for Currency Dispensing Units | |
| STANDARD FOR DELAYED-ACTION TIMELOCKS | |
| Standard for Fusible Links for Fire Protection Service | |
| Standard for Installation and Classification of Closed Circuit Video Equipment (CCVE) Systems for Institutional and Commercial Security Applications | |
| Standard for Power Supplies for Burglar Alarm Systems | |
| Standard for Synthetic Non-Percolating Forestry Hose | |
| Standard for Threaded Couplings for 1-1/2- and 2-1/2-Inch Fire Hose | |
| Standard for Type BH Gas Venting Systems | |
| STANDARD FOR VAULT VENTILATORS AND VAULT VENTILATING PORTS | |
| Standard Method of Fire Test for Evaluation of Integrity of Electrical Cables | |
| Standard Method of Fire Test of Light Diffusers and Lenses | |
| STANDARD METHOD OF FIRE TESTS FOR AIR FILTER UNITS | |
| Standard Method of Fire Tests for Optical Fibre Cable Raceway | |
| STANDARD TEST METHOD FOR THE DETERMINATION OF COMBUSTIBILITY PARAMETERS OF BUILDING MATERIALS USING AN OXYGEN CONSUMPTION CALORIMETER (CONE CALORIMETER) | |
| STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS) | |
| STEAM BOILERS AND EQUIPMENT (18,000,000 - 60,000,000 BTU/HR) | |
| STEAM BOILERS AND EQUIPMENT (500,000 - 18,000,000 BTU/HR) | |
| STEAM HEATING PLANT WATERTUBE (FIELD ERECTED) COAL/OIL OR COAL | |
| STEAM HEATING PLANT WATERTUBE (SHOP ASSEMBLED) COAL/OIL OR COAL | |
| STEAM VALVES | |
| STEEL TANKS WITH FIXED ROOFS | |
| STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVING | |
| STORAGE VAULTS | |
| STORM DRAINAGE UTILITIES | |
| SUBDRAINAGE PIPING | |
| SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE | |
| SURGICAL LIGHTING FIXTURES | |
| SWAY BRACE DEVICES FOR SPRINKLER SYSTEMS | |
| SWITCHBOARDS AND SWITCHGEAR | |
| SWITCHBOARDS | |
| TELEVISION DISTRIBUTION SYSTEM | |
| TERMINAL HEATING UNITS | |
| TERMITE CONTROL BARRIERS | |
| TESTING, ADJUSTING, AND BALANCING FOR HVAC | |
| Tests for Fire Resistance of Record Protection Equipment | |
| The Evolution of Underground Natural Gas Storage: Changes in Utilization Patterns | |
| THE SERVICING OF HALON AND CLEAN AGENT EXTINGUISHING SYSTEMS | |
| THE SERVICING OF RESTAURANT COOKING AREA EXTINGUISHING SYSTEMS | |
| THERMAL ENERGY STORAGE SYSTEM: ICE-ON-COIL | |
| THERMAL INSULATION FOR MECHANICAL SYSTEMS | |
| THERMAL OXIDATION EQUIPMENT | |
| THREE-PHASE PAD-MOUNTED TRANSFORMERS | |
| TIMBER MARINE PILES | |
| TIMELOCKS | |
| TRANSPLANTING EXTERIOR PLANTS | |
| Transportation Reboot: Restarting America\x92s Most Essential Operating System The Case for Capacity: To Unlock Gridlock, Generate Jobs, Deliver Freight, and Connect Communities | |
| TRICKLING FILTER | |
| UK Business Procedure/Transmissi on Procedure - Key Transmission Procedure Minimum Requirements As Applied To The Delivery of Electricity Transmission Single Asset Replacement/Refurbis hment/Recondition Investments | |
| UK Business Procedure/Transmissi on Procedure - Type Registered Equipment Procedural Requirements | |
| UK Business Procedure/Transmissi on Procedures - Alliance Change Management | |
| UK Business Procedure/Transmissi on Procedures - Assessment Process for Capital Delivery Project Management, CDM Management, Contractor Site Management Prior to Performing These Duties On National Grid Projects | |
| UK Business Procedure/Transmissi on Procedures - Attachment to UKBP/TP 193 Project Controls Reference Guide UKBP/TP 193.1 | |
| UK Business Procedure/Transmissi on Procedures - Auditing by Construction Technical Assurance | |
| UK Business Procedure/Transmissi on Procedures - Authorisation Process for Commissioning, Settings and Design assurance Roles and Assessment Process for Contractor Design Approval Roles and Principal Designer Role | |
| UK Business Procedure/Transmissi on Procedures - Authorisation Process for Commissioning, Settings and Design Engineers | |
| UK Business Procedure/Transmissi on Procedures - Bulk Purchase NGET Sourced Equipment Procedure | |
| UK Business Procedure/Transmissi on Procedures - Collaboration and Publication of Project Documents Via The Cpm Livelink System | |
| UK Business Procedure/Transmissi on Procedures - Contingency Plans in Case of Failure of Numerical Busbar Protections | |
| UK Business Procedure/Transmissi on Procedures - Continuous Improvement Within The Investment Process | |
| UK Business Procedure/Transmissi on Procedures - Control of Access to Transmission Operational Sites | |
| UK Business Procedure/Transmissi on Procedures - CPM Livelink & ECM User Account Management | |
| UK Business Procedure/Transmissi on Procedures - Customer Build Procedure | |
| UK Business Procedure/Transmissi on Procedures - Customer Build Schemes | |
| UK Business Procedure/Transmissi on Procedures - Data Information Collection Process for Thermal Rating Schedules | |
| UK Business Procedure/Transmissi on Procedures - Digital Engineering (PAS 1192-2&5) | |
| UK Business Procedure/Transmissi on Procedures - Earthing System Design Procedural Requirements Documentation | |
| UK Business Procedure/Transmissi on Procedures - Elecricity Transmission Capital Delivery Unit Change Management | |
| UK Business Procedure/Transmissi on Procedures - Electricity Investment Process \x96 Environmental compliance and Best Practice | |
| UK Business Procedure/Transmissi on Procedures - Electricity Transmission Asset Management - Asset Data Structures | |
| UK Business Procedure/Transmissi on Procedures - Electricity Transmission Construction - Cost Assurance Process | |
| UK Business Procedure/Transmissi on Procedures - Equipment Commissioning & Decommissioning | |
| UK Business Procedure/Transmissi on Procedures - Investment Process | |
| UK Business Procedure/Transmissi on Procedures - Lifetime Management of Substation Control Systems | |
| UK Business Procedure/Transmissi on Procedures - Management of Drawings (Electricity Assets) | |
| UK Business Procedure/Transmissi on Procedures - Management of Impressied Voltages and Methods of Control | |
| UK Business Procedure/Transmissi on Procedures - Management of Outstanding Works | |
| UK Business Procedure/Transmissi on Procedures - Manufacturing Assurance | |
| UK Business Procedure/Transmissi on Procedures - Network Development Process Map Enabling Document | |
| UK Business Procedure/Transmissi on Procedures - Numbering and Nomenclature of HV Apparatus | |
| UK Business Procedure/Transmissi on Procedures - Operation and Management of the CPM Livelink System | |
| UK Business Procedure/Transmissi on Procedures - Pan-Alliance Programme Management - Planning & Project Controls | |
| UK Business Procedure/Transmissi on Procedures - Procedural Hierarchy for Electricity Transmission Investments/Projects Delivered Using the Network Development Process(NDP) | |
| UK Business Procedure/Transmissi on Procedures - Procedural Requirements for the Management of Temporary Works | |
| UK Business Procedure/Transmissi on Procedures - Production of Electricity Transmission Capital Delivery Workbooks | |
| UK Business Procedure/Transmissi on Procedures - Programme Management - Planning & Project Controls | |
| UK Business Procedure/Transmissi on Procedures - Protection and Automatic Switching Schedules | |
| UK Business Procedure/Transmissi on Procedures - Protection and Control Relay Settings | |
| UK Business Procedure/Transmissi on Procedures - Provision of Telecommunications Services at High Voltage Electricity Sites | |
| UK Business Procedure/Transmissi on Procedures - Risk (Threat & Opportunity) Management \x96 Electricity Alliance | |
| UK Business Procedure/Transmissi on Procedures - Safety, Engineering and Operation Engineering Safety Bulleting Distribution | |
| UK Business Procedure/Transmissi on Procedures - Settlement Metering | |
| UK Business Procedure/Transmissi on Procedures - SF6 Management and Usage Procedure | |
| UK Business Procedure/Transmissi on Procedures - Site Activity Competence Assurance | |
| UK Business Procedure/Transmissi on Procedures - Site Installation | |
| UK Business Procedure/Transmissi on Procedures - Site Responsibility Schedules | |
| UK Business Procedure/Transmissi on Procedures - Technical Assurance - Tasks and Responsibilities | |
| UK Business Procedure/Transmissi on Procedures - Technical Data Assurance | |
| UK Business Procedure/Transmissi on Procedures - Technical Workbook & Fixed Asset Commissioning (FACC) Process | |
| UK Business Procedure/Transmissi on Procedures - The Coordination of HV System Access for Capital Delivery & Asset Management Requirements | |
| UK Business Procedure/Transmissi on Procedures - The Elimination and Recuction of Shes Risks and Hazards During Scheme Design, Installation and Commissioning (Safety by Design) | |
| UK Business Procedure/Transmissi on Procedures - The Implementation of Construction (Design & Management) Regulations (CDM) 2015 for the Transmission Electricity Capital Programme | |
| UK Business Procedure/Transmissi on Procedures - Transmission Capital Delivery Electricity - Design Management | |
| UK Business Procedure/Transmissi on Procedures - Transmission Operation Diagrams and Technical Data Schedules | |
| UK Business Procedure/Transmissi on Procedures - Unlicensed Work Procedure | |
| UK Business Procedure/Transmissi on Procedures - Work Planning Process | |
| Under-Dispenser Sumps | |
| UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA CAPACITY | |
| UNINTERRUPTIBLE POWER SUPPLY (UPS) | |
| UNITARY AIR CONDITIONING EQUIPMENT | |
| Unlocking Freight | |
| Unlocking Gridlock | |
| UNVENTED ETHYL ALCOHOL FUEL BURNING DECORATIVE APPLIANCES | |
| USCAR \x96 IFI GUIDE for Ultra-high Strength Externally Threaded Fasteners | |
| User\x92s Guide - National Energy Code of Canada for Buildings 2011 | |
| UTILITY HORIZONTAL DIRECTIONAL DRILLING | |
| UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND INTEGRATION | |
| UTILITY TRANSFORMERS | |
| Valves for Anhydrous Ammonia and Propane (Other Than Safety Relief) | |
| VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES | |
| VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS | |
| VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS | |
| VARIABLE REFRIGERANT FLOW HVAC SYSTEMS | |
| VEHICLE CRASH BARRIERS | |
| VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOW IMPELLER-TYPE | |
| VIDEO IMAGE SMOKE DETECTION SYSTEM DEVICES | |
| WATER AND WASTEWATER CHEMICAL FEED SYSTEMS | |
| WATER CHILLERS, VAPOR COMPRESSION TYPE | |
| WATER METERS | |
| WATER POLLUTION CONTAINMENT AND CLEANUP EQUIPMENT | |
| WATER STORAGE STEEL TANKS | |
| WATER UTILITY DISTRIBUTION PIPING | |
| WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS | |
| WATER-TUBE BOILERS, OIL/GAS OR OIL | |
| WELDED OUTLET FITTINGS | |
| WELDING CRANE AND RAILROAD RAIL - THERMITE METHOD | |
| WIND GENERATOR SYSTEM | |
| WIRE FENCES AND GATES |
| << Prev | Next >> |