Accuris Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
Page:
1
500
1000
1200
1250
1300
1350
1400
1450
1470
1480
1490
1500
1510
1520
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1550
1560
1570
1580
1590
1600
1620
| Product Name | Notes |
|---|---|
| ACCEPTANCE TEST RESULTS | |
| AGENDA, C. P. PROPELLER TEST | |
| AGENDA, INTEGRATED LOGISTIC SUPPORT MANAGEMENT TEAM MEETINGS | |
| AGENDA, MEETING, INTEGRATED LOGISTIC SUPPORT MANAGEMENT TEAM | |
| AGENDA, TEST AND TRAIL (BOATS) | |
| AIDS, COMPUTER PROGRAM | |
| ANALYSIS DATA, MAINTENANCE ENGINEERING | |
| ANALYSIS: TORSIONAL VIBRATION FOR PROPULSION SYSTEM (BOATS) | |
| APPROVED SOURCE/QUALITY VERIFIED PARTS LIST (AS/QVPL) | |
| ARRAY SIMULATOR TEST PROCEDURES | |
| ARRAY SIMULATOR TEST REPORT | |
| ARTWORK, GRAPHIC (AUDIO/VISUAL) AIDS, ORIGINALS-TRAINERS, MAINTENANCE, TRAINING PARTS AND TRAINING COURSES | |
| AUGMENTED SUPPORT REPAIR DATA | |
| BOOK, BOAT INFORMATION | |
| BOOK, DAMAGE CONTROL, ALL SHIPS | |
| BOOK, SAMPLE POLLUTION INFORMATION | |
| BULLETIN, FIELD CHANGE, TYPE I | |
| CALIBRATION - MAINTENANCE TEST DATA | |
| CALIBRATION, OPERATION AND INSPECTION PROCEDURES | |
| CARD DECKS, MMP SOURCE LANGUAGE | |
| CARD, MAINTENANCE REQUIREMENT (MRC); PAGES, MAINTENANCE INDEX (MIP) AND ASSOCIATED DOCUMENTATION | |
| CARD, PROGRAMMER'S REFERENCE | |
| CARDS, MAINTENANCE REQUIREMENT (MRC) AND PAGES, MAINTENANCE INDEX (MIP) | |
| CARDS, TABULATING | |
| CERTIFICATE OF PRIOR SUBMISSION, INSTRUMENT CALIBRATION PROCEDURES | |
| CERTIFICATION DATA FOR LEVEL I MATERIAL | |
| CERTIFICATION DEMONSTRATION PROCEDURES | |
| CERTIFIED CHECK LIST FOR TECHNICAL PUBLICATIONS MATERIAL | |
| CHARTS, OPERATING INSTRUCTION | |
| CODED PACKAGING DATA | |
| COMPUTER PROGRAM, SCIENTIFIC, MODULE VERSION MANUAL | |
| COMPUTER PROGRAM, SCIENTIFIC, REQUIREMENTS ON A VERSION OF A MODULE | |
| COMPUTER PROGRAM, SCIENTIFIC, USERS MANUAL FOR AN EXECUTABLE PROGRAM | |
| CONTRACT FIELD SERVICE REPORT | |
| DATA PACKAGE, SUPPORT SITE ACTIVATION | |
| DATA REQUIREMENTS, ILS EVALUATION, PHASE II AND PHASE III | |
| DATA, ALLOWANCE LIST | |
| DATA, BATTERY ACTIVATION AND CHARGING | |
| DATA, BATTERY CURRENT DRAIN | |
| DATA, COOLING DESIGN | |
| DATA, DESIGN REVIEW (COMPUTER AIDED) | |
| DATA, DESIGN REVIEW (SHORE ANTENNAS) | |
| DATA, DESIGN REVIEW | |
| DATA, GRAPHIC AND TEXTUAL PRESENTATION | |
| DATA, INSTALLATION, GROUND SUPPORT EQUIPMENT (GSEID) | |
| DATA, LOGISTIC SUPPORT DETERMINATION | |
| DATA, LOGISTIC, FOR ADVANCED DEVELOPMENT/ENGINEER ING DEVELOPMENT HARDWARE | |
| DATA, MAINTENANCE PLANNING AND ANALYSIS | |
| DATA, OSCILLOGRAMS OF BUS VOLTAGE | |
| DATA, PATH DEFINITION | |
| DATA, Q.A., TRANSFORMER, REACTOR AND INDUCTOR | |
| DATA, SPECIAL PURPOSE LEAD FABRICATION, INSTALLATION, AND INSPECTION | |
| DATA, SUPPORT MAINTENANCE TEST PRODEDURES VERIFICATION | |
| DATA, VARIABLES | |
| DATA, VOLTAGE DROP | |
| DECK, SOURCE | |
| DERIVATION, SPECIFICATION WEIGHT - MASS PROPERTIES DATA FOR MISSILES | |
| DERIVATION, WEIGHT - DETAIL SPECIFICATION FOR AIRCRAFT MASS PROPERTIES DATA | |
| DESCRIPTION, SET-UP, COMPONENT SHOP NOISE TEST | |
| DESIGN ANALYSIS, AUTOMATIC COMBUSTION AND FEEDWATER CONTROL SYSTEMS | |
| DESIGN DATA, STEAM TURBINE ROTATING BLADES | |
| DIAGRAMS, ENGINEERING AND PRODUCTION EVENT/FLOW | |
| DIGITAL COMPUTER TECHNICAL DATA AND HARDWARE SYSTEM INVENTORY | |
| DIRECTORY, SHIPBOARD IVCS/DIAL TELEPHONE SYSTEM | |
| DOCUMENT, DATA BASE DESIGN (DBDD) | |
| DOCUMENT, FACILITIES REQUIREMENTS FOR TYPICAL SHOREBASED AND SHIPBOARD SITES | |
| DOCUMENT, FUNCTION OPERATIONAL DESIGN (FOD) | |
| DOCUMENT, PROGRAM PACKAGE (PP) | |
| DOCUMENT, PROGRAM PACKAGE | |
| DOCUMENT, SYSTEM OPERATIONAL DESIGN (SOD) | |
| DOCUMENT, TACTICAL OPERATIONAL REQUIREMENT (TOR) | |
| DOCUMENT, TEST REQUIREMENT | |
| DOCUMENTATION, CALIBRATION SYSTEM REQUIREMENTS | |
| DOCUMENTATION, CDC PROGRAM | |
| DOCUMENTATION, FIRST ARTICLE (SUPPLEMENTAL) | |
| DOCUMENTATION, LOGISTIC SUPPORT ANALYSIS (LSA) | |
| DOCUMENTATION, NON-NUCLEAR MAINTENANCE, SSN SUBMARINES | |
| DOCUMENTATION, NONPREFERRED PARTS | |
| DOCUMENTATION, POSEIDON MISSLE CONVERSION WORK PACKAGE | |
| DOCUMENTATION, SUPPORT SOFTWARE | |
| DOCUMENTATION, VARIABLE CONFIGURATION (FOR AN/UYK-7(V) COMPUTER SETS) | |
| DOCUMENTATIONS, TECHNICAL, SELECTED RECORD DATA (SUBMARINES) | |
| DRAWING, EQUIPMENT CLEARANCE | |
| DRAWING, SHIPPING CONDITION | |
| DRAWINGS, VEHICLE LOADING CONFIGURATION | |
| ENGINEER'S OPERATING MANUAL | |
| ENGINEERING BULLETIN | |
| ENGINEERING DESIGN ANALYSIS REPORT | |
| ENVIRONMENTAL TEST REPORT | |
| EQUIPMENT CALIBRATION PROCEDURES | |
| EQUIPMENT RELEASE SHEETS | |
| FACILITY SUPPORT PROGRAM | |
| FACTORY AND SHIPBOARD ASSEMBLY AND TEST MAINTENANCE REPORT | |
| FACTORY/PRODUCTION ACCEPTANCE TEST PLAN | |
| FAILURE DATA COLLECTION ANALYSIS AND CORRECTIVE ACTION REPORTING PROGRAM PLAN | |
| FILE, SPECIAL TAPE | |
| GLOSSARY, COMPUTER PROGRAM SYSTEM/CAPABILITY | |
| GUIDE, PROPULSION OPERATING (POG) | |
| HISTORICAL ADP LISTINGS, MATERIAL DEFICIENCY REPORT/MATERIAL CONDITION REPORT SUMMARY | |
| ILLUSTRATIONS, GROUND SUPPORT EQUIPMENT (GSEI) | |
| INDEX OF TECHNICAL PUBLICATIONS; REVISIONS TO | |
| INDEX, TECHNICAL MANUAL | |
| INSPECTION RECORDS | |
| INSPECTION SYSTEM PLAN | |
| INSTRUCTIONS FOR CARE AND MAINTENANCE OF WEAPON SYSTEMS BY SHIPYARDS | |
| INTEGRATED LOGISTIC SUPPORT MANAGEMENT PLAN (ILSMP) | |
| INTEGRATED LOGISTICS SUPPORT PLAN (ILSP) | |
| ITEM IDENTIFICATION DATA (BIDDER) | |
| LABORATORY NOTEBOOKS FOR DOCUMENTATION OF RESEARCH, DEVELOPMENT AND TESTING WORK | |
| LIST, ANALYTICAL REWORK PROGRAM (ARP), CANDIDATE | |
| LIST, CONSOLIDATED GROUND SUPPORT EQUIPMENT (CGSEL) | |
| LIST, CONSOLIDATED GROUND SUPPORT EQUIPMENT FOR FOREIGN MILITARY SALES (FMSCGSEL) | |
| LIST, CONTRACTOR TEST FACILITIES | |
| LIST, INTERCONNECTION DEVICE PIN/WIRE | |
| LIST, ITEMS REQUIRING SPECIAL HANDLING BETWEEN/WITHIN MAINTENANCE AND SUPPLY DEPARTMENT | |
| LIST, LUBRICATION | |
| LIST, MASTER EQUIPMENT | |
| LIST, NOTED BUT NOT CORRECTED (NBNC) DISCREPANCY | |
| LIST, PACKING/SHIPPING | |
| LIST, PF ANCILLARY EQUIPMENT PROCUREMENT | |
| LIST, SHIP INITIAL ON-BOARD OPERATING SPACE ITEM (OSI) INVENTORY | |
| LIST, SPECIAL STOWAGE ITEMS | |
| LIST, STANDARD/MODIFIED HAND TOOLS (LSMHT) | |
| LIST, SUPPORT & TEST EQUIPMENT - SPECIAL & GENERAL PURPOSE | |
| LIST, TECHNICAL MANUAL DATA, TMDL | |
| LIST, TEST SET | |
| LIST, TOXIC/DANGEROUS MATERIAL | |
| LISTS (CHECK-OFF), SHIP COMPARTMENT DAMAGE CONTROL | |
| LISTS, CONTRACTOR RECOMMENDED CODING (CRC), RECOMMENDATIONS AND SUBSTANTIATING DATA | |
| LISTS, INSTRUMENT | |
| LOCAL ENGINEERING DIRECTIVES (LED'D) | |
| LOG, OPERATIONAL, EQUIPMENT | |
| LOGBOOKS, MISSILE AND MISSILE EQUIPMENT | |
| LOT INSPECTION REPORT | |
| MAGNETIC TAPES, MMP MASTER SYSTEM | |
| MAGNETIC TAPES, SOURCE LANGUAGE CARD IMAGES | |
| MAINTAINABILITY AND HUMAN FACTORS PROGRAM PLAN | |
| MAINTAINABILITY DEMONSTRATION FAULT LIST | |
| MAINTAINABILITY DEMONSTRATION REPORT | |
| MAINTAINABILITY PROGRAM PLAN | |
| MAINTAINABILITY STATUS REPORTS | |
| MAINTENANCE DATA REPORTING | |
| MAINTENANCE DATA, LUBRICATION CHART | |
| MAINTENANCE DEFICIENCY REPORT WORKSHEET | |
| MAINTENANCE PLAN, SUPPORT EQUIPMENT, AIRBORNE SYSTEMS, SUBSYSTEMS AND EQUIPMENT | |
| MAINTENANCE PLAN | |
| MANUAL, C AND D COMPUTER PROGRAM OPERATOR'S | |
| MANUAL, CDC CODE | |
| MANUAL, COLOR COORDINATION FOR HABITABILITY SPACES | |
| MANUAL, COMMAND AND STAFF (CSM) | |
| MANUAL, COMPUTER PROGRAM SHAKEDOWN | |
| MANUAL, ENGINEERING, FOR DEVELOPMENTAL EQUIPMENT | |
| MANUAL, MMP SOFTWARE | |
| MANUAL, MPS MMP SOFTWARE SYSTEM (PRELIMINARY) | |
| MANUAL, MPS SOFTWARE MAINTENANCE PROGRAM | |
| MANUAL, NUCLEAR FACILITIES | |
| MANUAL, OPERATOR'S (OM) | |
| MANUAL, OPERATOR'S, TACTICAL COMPUTER SYSTEMS | |
| MANUAL, PECS LBTS TEST PROCEDURES | |
| MANUAL, PROGRAM DESIGN (PDM) | |
| MANUAL, PROGRAM DESIGN, TACTICAL COMPUTER SYSTEMS | |
| MANUAL, PROGRAMMER'S REFERENCE | |
| MANUAL, SHIP ALONGSIDE SERVICES, OPERATION OF | |
| MANUAL, SYSTEM OPERATOR'S (SOM) | |
| MANUAL, TECHNICAL MOTOR GENERATORS AND ASSOCIATED CONTROLS | |
| MANUAL, TECHNICAL, ILLUSTRATED PARTS BREAKDOWN | |
| MANUAL, TECHNICAL, OPERATION AND MAINTENANCE INSTRUCTIONS | |
| MANUAL, TECHNICAL, PROPULSION GEARS AND CLUTCHES | |
| MANUAL, TECHNICAL, SOFTWARE | |
| MANUAL, TECHNICAL, TYPE III, SYSTEMS | |
| MANUAL, TECHNICAL: AUTOMATIC COMBUSTION AND FEED WATER CONTROL SYSTEMS | |
| MANUAL, TECHNICAL; COMMERCIAL STANDARD | |
| MANUAL, TECHNICIAN'S POCKET | |
| MANUAL, USE OF ADJUSTABLE METAL DUNNAGE SYSTEM | |
| MANUAL, USER'S, COMPUTER PROGRAMS | |
| MANUALS, POWER SWITCHBOARD | |
| MANUALS, SSBN OVERHAUL PLANNING | |
| MANUALS, TECHNICAL SERVICE (BOATS) | |
| MANUALS, TECHNICAL, CONTROL CONSOLE(S) | |
| MANUALS, TECHNICAL, UNREP EQUIPMENT | |
| MANUSCRIPT CATALOG SHEETS, TYPE I | |
| MANUSCRIPT, ILLUSTRATED PARTS BREAKDOWN | |
| MASTER TEST PLAN | |
| MATERIALS, BILL OF - ABBREVIATED SUMMARY | |
| MATERIALS, BILLS OF | |
| MINUTES, MEETING, INTEGRATED LOGISTIC SUPPORT MANAGEMENT TEAM | |
| MODIFIED INSTALLATION CHECK-OUT TEST PROCEDURES | |
| OPERATING AND MAINTENANCE DATA | |
| OPERATING INSTRUCTIONS (RDT&E) | |
| PACKAGE, DESIGN DATA (INITIAL AND FINAL) | |
| PACKAGE, PROGRAM SUPPORT SOFTWARE | |
| PACKAGE, PUBLICATIONS | |
| PACKAGING AND PACKING PROCEDURES FOR WEAPONS | |
| PACKAGING AND TRANSPORTATION SUPPORT DATA | |
| PACKING LIST(S) | |
| PARTS LIST, QUALIFICATION (CANC PER DOD 5010.12-L) | |
| PERFORMANCE AND COMPATIBILITY REQUIREMENTS FOR WEAPON PACKAGING, HANDLING, STORAGE AND TRANSPORTATION | |
| PERFORMANCE VERIFICATION TEST PROCEDURE | |
| PLAN, ALARM SENSOR | |
| PLAN, BASE ELECTRONIC SYSTEM ENGINEERING (BESEP) | |
| PLAN, CONTRACTOR STANDARDIZATION PROGRAM | |
| PLAN, CONTROL, SYSTEM ELECTROMAGNETIC COMPATIBILITY | |
| PLAN, CORROSION CONTROL | |
| PLAN, DATA PACKAGE DEMONSTRATION AND VALIDATION | |
| PLAN, DEMONSTRATION AND VERIFICATION, INTEGRATED LOGISTIC SUPPORT | |
| PLAN, DETAILED, ILS EVALUATION, PHASE I & II | |
| PLAN, ELECTROMAGNETIC PULSES (EMP) HARDENING | |
| PLAN, EQUIPMENT/SYSTEM CAPABILITY | |
| PLAN, FAILURE DATA COLLECTION, ANALYSIS & CORRECTIVE ACTION | |
| PLAN, FREQUENCY, ALLOCATION | |
| PLAN, FUNCTION TEST | |
| PLAN, INSPECTION AND TEST | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (AN/BQQ-5) | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILS) LOGISTIC SUPPORT ANALYSIS SECTION | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILSP) CONTRACTOR DATA COLLECTION SECTION | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILSP) FACILITIES SECTION | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILSP) ILS EVALUATION SECTION | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILSP) PHST (PACKAGING, HANDLING, STORAGE AND TRANSPORTATION SECTION) | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILSP) TECHNICAL MANUAL SECTION | |
| PLAN, INTEGRATED LOGISTIC SUPPORT (ILSP) | |
| PLAN, INTEGRATED LOGISTIC SUPPORT, (ILSP) SITE/UNIT ACTIVATION SECTION | |
| PLAN, INTEGRATED LOGISTIC SUPPORT | |
| PLAN, INTEGRATED LOGISTICS SUPPORT (ILS) | |
| PLAN, INTEGRATED MAINTENANCE REQUIREMENTS (IMRP) | |
| PLAN, MAINTAINABILITY DEMONSTRATION | |
| PLAN, MAINTAINABILITY PROGRAM | |
| PLAN, MAINTENANCE, INTEGRATED LOGISTIC SUPPORT | |
| PLAN, MAINTENANCE | |
| PLAN, OPERATIONAL LOGISTICS SUPPORT (OLSP) | |
| PLAN, PF CS SWITCHBOARD PROCUREMENT | |
| PLAN, PFCS LBTS INSTALLATION AND CHECKOUT | |
| PLAN, PLANT ACCEPTANCE TEST | |
| PLAN, PRE-BINDING OPERATIONS | |
| PLAN, PRODUCTION INSPECTION | |
| PLAN, PROGRAM, LEVEL OF REPAIR (GOVERNMENT ANALYSIS) | |
| PLAN, QUALITY ASSURANCE PROGRAM | |
| PLAN, RELIABILITY PROGRAM | |
| PLAN, RELIABILITY TEST AND DEMONSTRATION | |
| PLAN, SEA TEST AND ANALYSIS | |
| PLAN, STANDARDIZATION PROGRAM | |
| PLAN, SUBPROGRAM/MODULE TEST | |
| PLAN, SUPPORT SITE ACTIVATION | |
| PLAN, SYSTEM INTEGRATION TEST | |
| PLAN, SYSTEM/PROGRAM PERFORMANCE/ACCEPTAN CE TEST | |
| PLAN, TECHNICAL MANUAL QUALITY PROGRAM | |
| PLAN, TEST SYSTEM ELECTROMAGNETIC COMPATIBILITY | |
| PLAN, TEST, COMPUTER PROGRAM SOFTWARE | |
| PLAN, TRANSIENT RADIATION ELECTRON EFFECTS ON ELECTRONICS HARDENING (TREE) | |
| PLAN, VALIDATION AND VERIFICATION | |
| PLAN, VALUE ENGINEERING PROGRAM | |
| PLAN/PROCEDURES, CATEGORY I TEST | |
| PLANNED MAINTENANCE SYSTEM DOCUMENTATION | |
| PLANS, TEST | |
| PROCEDURE, CONTRACTOR FURNISHED OPERATING SPACE ITEM (OSI) TURNOVER | |
| PROCEDURE, EMERGENCY DESTRUCTION DEMONSTRATION PLAN AND TEST (EDDPTP) | |
| PROCEDURE, GENERAL ACCEPTANCE TEST | |
| PROCEDURE, TEST (TP) | |
| PROCEDURES, ACCEPTANCE TEST | |
| PROCEDURES, FOR CLEANING BREATHING GAS | |
| PROCEDURES, INSTALLATION/TEST | |
| PROCEDURES, INSTRUMENT CALIBRATION (ICP) | |
| PROCEDURES, POST SHOCK TEST FUNCTIONAL TESTING | |
| PROCEDURES, TEST | |
| PRODUCIBILITY PLAN AND REPORTS | |
| PRODUCIBILITY PROGRESS REPORTS AND FINAL REPORT | |
| PRODUCIBILITY/VALVE ENGINEERING PLAN | |
| PRODUCIBILITY/VALVE ENGINEERING PROGRESS REPORTS AND FINAL REPORT | |
| PRODUCTION & FACILITIES PLAN, FOLLOW-ON | |
| PRODUCTION AND FACILITIES PLAN | |
| PRODUCTION INSPECTION EQUIPMENT (PIE) AND HARD TOOLING ACQUISITION PLAN | |
| PRODUCTION PLAN | |
| PRODUCTION RELIABILITY FAILURE SUMMARY REPORT | |
| PRODUCTION RELIABILITY PROGRAM PLAN | |
| PRODUCTION RELIABILITY PROGRAM PROGRESS REPORT | |
| PRODUCTION TEST EQUIPMENT DESIGN PROPOSALS | |
| PROGRAM PLAN | |
| PROGRAM, DESCRIPTION OF C AND D | |
| PROPOSAL, HEAVYWEIGHT EQUIPMENT BREAKDOWN FOR SHOCK TESTING | |
| PROPOSAL, INTEGRATED LOGISTIC SUPPORT SECTION | |
| PROPOSALS, TRAINING PARTS, MAINTENANCE TRAINING EQUIPMENT, RELATED ITEMS AND SERVICES | |
| PUBLICATIONS PACKAGE, FIELD CHANGE | |
| PURCHASE ORDERS, COPIES OF/INDEX OF | |
| QUALITY ASSURANCE AUDIT REPORT | |
| QUALITY ASSURANCE ENVIRONMENTAL TEST (QAET) PLAN | |
| QUALITY ASSURANCE PROGRAM PLAN | |
| QUALITY PROGRAM PLAN | |
| QUARTERLY SUMMARY, MAINTENANCE DEFICIENCY REPORT | |
| READINESS CHECKLIST, COMBAT SYSTEM COMPARTMENTS | |
| RECOMMENDATIONS, MAINTENANCE LEVEL | |
| RECORD, LOGISTIC SUPPORT ANALYSIS | |
| RECORDS, INSPECTION AND TEST | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET I | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET II | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET III | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET IV | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET V | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET VI | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET VII | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) - WORKSHEET VIII | |
| RECORDS, MAINTENANCE ENGINEERING ANALYSIS (MEAR'S) | |
| RECORDS, QUALITY ASSURANCE, PLAN | |
| RECORDS, REPAIR PARTS INVENTORY | |
| RELIABILITY AND MAINTAINABILITY BLOCK DIAGRAMS AND MATHEMATICAL MODELS | |
| RELIABILITY PROGRAM PLAN | |
| REPAIR/REHABILITATIO N INSTRUCTIONS & STANDARDS | |
| REPORT OF DEFICIENCIES FOUND IN MATERIAL (DD FORM 1686) | |
| REPORT(S), ENGINE STATUS CODE | |
| REPORT, ACCEPTANCE TEST | |
| REPORT, ACCURACY ANALYSIS | |
| REPORT, ACCURACY PREDICTION | |
| REPORT, ACTUAL WEIGHT AND BALANCE (DETAIL) AND APPENDICES - MASS PROPERTIES DATA FOR AIRCRAFT | |
| REPORT, ACTUAL WEIGHT AND BALANCE (INTERMEDIATE) - MASS PROPERTIES DATA FOR AIRCRAFT | |
| REPORT, AIRCRAFT MAINTENANCE/HISTORY SUMMARY | |
| REPORT, ALIGNMENT CRITERIA | |
| REPORT, ANALYSIS OF INTERFERENCE POTENTIAL | |
| REPORT, ANALYSIS, SHIP MOTION | |
| REPORT, ARP (ANALYTICAL REWORK PROGRAM) TYPE "A" NONDESTRUCTION INSPECTION | |
| REPORT, ARP (ANALYTICAL REWORK PROGRAM) TYPE "B" CORROSION | |
| REPORT, ASSEMBLY BUILD-UP, REPAIR AND ASSEMBLY OF GAS GENERATOR, POWER TURBINE AND ACCESSORIES | |
| REPORT, CALCULATED WEIGHT AND BALANCE - MASS PROPERTIES DATA FOR AIRCRAFT | |
| REPORT, CALCULATED WEIGHT AND BALANCE - MASS PROPERTIES DATA FOR MISSILES | |
| REPORT, CONDITION OF CONTAINERS FOR GAS GENERATOR AND POWER TURBINE | |
| REPORT, DEPOT REPAIR | |
| REPORT, DESIGN APPROVAL TEST | |
| REPORT, DETAIL OR INTERMEDIATE ACTUAL WEIGHT AND BALANCE - MASS PROPERTIES DATA FOR MISSILES | |
| REPORT, DISASSEMBLY AND INSPECTION | |
| REPORT, ELECTROMAGNETIC INTERFERENCE TEST (EQUIPMENTS, SYSTEMS, SUBSYSTEMS) | |
| REPORT, ELECTROMAGNETIC PULSES (EMP) HARDENING | |
| REPORT, EMERGENCY DESTRUCTION DEMONSTRATION TEST (EDDTR) | |
| REPORT, ENGINE STATUS | |
| REPORT, ENVIRONMENT | |
| REPORT, ESTIMATED WEIGHT AND BALANCE - MASS PROPERTIES DATA FOR AIRCRAFT | |
| REPORT, EXCESS MATERIALS | |
| REPORT, FACILITIES REQUIREMENTS | |
| REPORT, FACTORY RELIABILITY QUALIFICATION TEST | |
| REPORT, FAILURE SUMMARY | |
| REPORT, FAILURE/MALFUNCTION | |
| REPORT, FAILURE | |
| REPORT, FINAL, VALUE ENGINEERING PROGRAM | |
| REPORT, FINAL; VALUE ENGINEERING PROGRAM | |
| REPORT, FIRST ARTICLE (PREPRODUCTION) TEST | |
| REPORT, FIRST ARTICLE INSPECTION TEST | |
| REPORT, FLOTATION TEST (BOATS) | |
| REPORT, FORMAT OF TEST | |
| REPORT, GAS GENERATOR AND POWER TURBINE RECEIPT | |
| REPORT, GOVERNMENT FURNISHED EQUIPMENT (GFE) SPECIFICATIONS CONFORMANCE | |
| REPORT, HULL TEST RESULTS (BOATS) | |
| REPORT, HYDRAULIC FLUID CONTAMINATION | |
| REPORT, INDIVIDUAL PROJECT, VALUE ENGINEERING | |
| REPORT, INDIVIDUAL PROJECT; VALUE ENGINEERING PROGRAM | |
| REPORT, INSPECTION | |
| REPORT, LAND BASED TEST SITE (LBTS) | |
| REPORT, LBTS PFCS INTEGRATION/CERTIFIC ATION | |
| REPORT, LETTER STATUS | |
| REPORT, LOGISTIC ENGINEERING PROGRESS | |
| REPORT, LOGISTICS DESIGN APPRAISAL (LDA) | |
| REPORT, MAIN PROPULSION BOILERS | |
| REPORT, MAIN PROPULSION SHAFTING SYSTEM MEASURED BEARING REACTIONS | |
| REPORT, MAINTAINABILITY PREDICTION | |
| REPORT, MAINTAINABILITY TEST PROCEDURES | |
| REPORT, MATERIAL CONDITION SUMMARY | |
| REPORT, MATERIAL INSPECTION SYSTEM | |
| REPORT, MATERIALS AND PROCESSES DEVELOPMENT AND EVALUATION | |
| REPORT, METHOD OF PROPOSED SUPPORT | |
| REPORT, MODEM INVESTIGATION STATUS | |
| REPORT, NOISE MEASUREMENT (SHORT FORM) | |
| REPORT, NOISE MEASUREMENT | |
| REPORT, OPERABILITY TEST | |
| REPORT, OPERATIONAL/PERFORMA NCE TEST | |
| REPORT, PACKAGING AND HANDLING DEFICIENCIES | |
| REPORT, PARTS AND MATERIAL ISSUE | |
| REPORT, POST DESIGN WEIGHT ANALYSIS - MASS PROPERTIES DATA FOR AIRCRAFT | |
| REPORT, POST-OVERHAUL ANALYSIS | |
| REPORT, PREFLIGHT - OPERATIONAL WEIGHT DATA - MASS PROPERTIES DATA FOR MISSILES | |
| REPORT, PRELIMINARY ASSEMBLY BUILD-UP, REPAIR AND ASSEMBLY OF GAS GENERATOR, POWER TURBINE AND ACCESSORIES | |
| REPORT, PROGRESS (PERIODIC), VALUE ENGINEERING PROGRAM | |
| REPORT, PROGRESS: VALUE ENGINEERING PROGRAM | |
| REPORT, PROPELLER MEASUREMENT | |
| REPORT, R&M DESIGN REVIEW | |
| REPORT, RADIATION HAZARD | |
| REPORT, RELIABILITY AND MAINTAINABILITY ALLOCATION | |
| REPORT, RELIABILITY AND MAINTAINABILITY ALLOCATIONS, ASSESSMENTS, AND ANALYSIS | |
| REPORT, RELIABILITY AND MAINTAINABILITY DATA | |
| REPORT, RELIABILITY AND MAINTAINABILITY PROGRAM | |
| REPORT, RELIABILITY AND MAINTAINABILITY STATUS | |
| REPORT, RELIABILITY AND MAINTAINABILITY TEST PLAN | |
| REPORT, RELIABILITY AND MAINTAINABILITY TEST RESULTS | |
| REPORT, RELIABILITY STRESS ANALYSIS | |
| REPORT, RELIABILITY TEST PROCEDURES | |
| REPORT, REPAIR PARTS, TEST, INSP., REPAIR, MODIF. OF | |
| REPORT, RESEARCH AND DEVELOPMENT (FOR ELECTRONIC EQUIPMENT) | |
| REPORT, SEA TEST AND ANALYSIS | |
| REPORT, SITE EVALUATION | |
| REPORT, SITE SURVEY | |
| REPORT, STATIC "G" SHOCK ANALYSIS | |
| REPORT, STATUS, TECHNICAL MANUALS (TYPE II AND III) | |
| REPORT, STATUS, WEIGHT AND BALANCE - MASS PROPERTIES DATA FOR AIRCRAFT | |
| REPORT, STATUS, WEIGHT AND BALANCE - MASS PROPERTIES DATA FOR MISSILES | |
| REPORT, STEERING GEAR TEST (BOATS) | |
| REPORT, STRAINER SHIELD DESIGN | |
| REPORT, STRUCTURAL ANALYSIS (SHORE ANTENNAS) | |
| REPORT, SUMMARY COMPLETION OF REPAIR OF GAS GENERATOR, POWER TURBINE, ACCESSORIES, AND CONTAINERS | |
| REPORT, TECHNICAL DATA, DEFECT PREVENTION (CONTRACTOR FURNISHED EQUIPMENT) | |
| REPORT, TECHNICAL, CONTRACT FIELD SERVICE | |
| REPORT, TECHNICAL | |
| REPORT, TEST, COMPUTER PROGRAM SOFTWARE | |
| REPORT, TEST, SYSTEM ELECTROMAGNETIC COMPATIBILITY | |
| REPORT, TEST/INSPECTION | |
| REPORT, TRADE-OFF STUDIES INCIDENT TO LOGISTICS SUPPORT | |
| REPORT, TRANSPORTATION DISCREPANCIES IN SHIPMENT | |
| REPORT, USAGE OF 2H/2N COG PARTS FROM GFM | |
| REPORT, VALIDATION AND VERIFICATION | |
| REPORT, VIBRATION (SELF-GENERATED) | |
| REPORT, WEIGHT AND CENTER OF GRAVITY | |
| REPORTS MAINTAINABILITY PROGRAM STATUS | |
| REPORTS, C. P. PROPELLER TEST | |
| REPORTS, CONTROLLABLE PITCH PROPELLER INSPECTION | |
| REPORTS, COORDINATED/INTEGRAT ED SMMS DATA | |
| REPORTS, DESIGN TRADE-OFF STUDY | |
| REPORTS, EQUIPMENT SHOCK TEST | |
| REPORTS, FACILITY REQUIREMENTS, INTEGRATED LOGISTIC SUPPORT | |
| REPORTS, FACTORY TEST EQUIPMENT OUTSIDE SUPPLIED PARTS (OSP) VERIFICATION | |
| REPORTS, HEAVYWEIGHT EQUIPMENT SHOCK TEST DATA | |
| REPORTS, INSURV COMBINED TRIALS/MATERIAL INSPECTIONS SSN NEW CONSTRUCTION PROGRAM | |
| REPORTS, INTERIM SUPPORT, INTEGRATED LOGISTIC SUPPORT | |
| REPORTS, MAINTENANCE ENGINEERING ANALYSIS (MEA) | |
| REPORTS, PERSONNEL & TRAINING, INTEGRATED LOGISTIC SUPPORT | |
| REPORTS, PROPELLER TRAILS (BOATS) | |
| REPORTS, QUALITY ASSURANCE PROGRAM STATUS | |
| REPORTS, RELIABILITY TEST AND DEMONSTRATION | |
| REPORTS, TEST AND TRAIL (BOATS) | |
| REPORTS, TEST | |
| REPORTS, TESTS | |
| REQUEST, ASSIGNMENT OF NATIONAL STOCK NUMBER | |
| REQUEST, CESIUM BEAM SUBSTITUTION | |
| REQUEST, DISPOSITION INSTRUCTIONS FOR SHIP MINE COUNTER-MEASURES SYSTEM EMPTY CABLE REELS | |
| REQUEST, EXTENSION APPROVAL FOR VIBRATION TESTING | |
| REQUEST, FREQUENCY ASSIGNMENT | |
| REQUEST, GOVERNMENT NOMENCLATURE NAMEPLATE APPROVAL, SERIAL NUMBER | |
| REQUEST, TEST EQUIPMENT | |
| REQUEST, USE OF SHOCK MOUNTS | |
| REQUESTS, SHIPMENT - TRAINERS, MAINTENANCE AND TRAINING PARTS | |
| SAFETY STATEMENT | |
| SCHEDULE OF WATERTIGHT INTEGRITY TESTS AND INSPECTIONS | |
| SCHEDULE, INSULATION | |
| SCHEDULE, SHOCK DESIGN ANALYSIS | |
| SHEET, TECHNICAL DATA | |
| SHIP INFORMATION BOOK (S.I.B.) | |
| SHIP INFORMATION BOOK (SIB), FOLLOW SHIP, UPDATED | |
| SHIPPING AND REASSEMBLY PLAN | |
| SPARE/REPAIR PARTS LIST, NON-PROVISIONED | |
| SPECIAL INSTRUCTION SHEET, PACKAGING, STORAGE, AND TECHNICAL INSPECTION | |
| SPECIFICATION, ILS DETAIL | |
| SPECIFICATION, PRODUCTION ACCEPTANCE TEST | |
| STATEMENT OF QUALIFICATION FOR DEVELOPING PLANNED MAINTENANCE SUBSYSTEM (PMS) DOCUMENTATION | |
| STUDY REPORT, TRAINER | |
| SUMMARIES, SHIPALT MATERIAL MANAGEMENT SUB- MARINES OVERHAUL/CONVERSION/ MAINTENANCE | |
| SUMMARY INSTALLATION AND MAINTENANCE REPORT | |
| SUMMARY, SHOP NOISE TEST RESULTS | |
| SUMMARY, SUBMARINE SHIPALT STATUS | |
| SYSTEM SAFETY PROGRAM PLAN (SSPP) | |
| TAPES, MAGNETIC, MPS SOFTWARE MAINTENANCE PROGRAM | |
| TECHINICAL MANUAL, STEERING SYSTEM | |
| TECHNICAL MANUAL BOOK PLAN, TYPE II | |
| TECHNICAL MANUAL PRODUCTION-COMMON LANGUAGE FORMS | |
| TECHNICAL MANUALS, ELECTRICAL GENERATORS | |
| TECHNICAL/MAINTENANC E OVERHAUL AND REPAIR STANDARDS (TRSS) | |
| TEST CURVES FOR PROPULSION ENGINES (BOATS) | |
| TEST PLAN | |
| TEST PROCEDURES | |
| TEST, EVALUATION OR DEMONSTRATION TEST ARTICLE CONFIGURATION | |
| TRAINER COMPUTER SYSTEM REPORT | |
| TRAINER CRITERIA REPORT | |
| TRAINER ENGINEERING DESIGN REPORT | |
| TRAINER FACILITIES REPORT | |
| TRAINER GOVERNMENT FURNISHED EQUIPMENT (GFE) STATUS REPORT | |
| TRAINER INSTALLATION REQUIREMENTS REPORT | |
| TRAINER MATH MODEL REPORT | |
| TRAINER QUALITY ASSURANCE PROGRAM PLAN | |
| TRAINER RELIABILITY AND MAINTAINABILITY DESIGN ANALYSIS REPORT | |
| TRAINER RELIABILITY PROGRAM PLAN | |
| TRAINER RELIABILITY PROGRAM STATUS REPORTS | |
| TRAINER VALUE ENGINEERING PROGRAM | |
| TRAINING DEVICE INVENTORY RECORDS | |
| TROUBLE, FAILURE AND CORRECTIVE ACTION REPORT (TFRAC) | |
| VALUE ENGINEERING PLAN, PROPOSALS, AND REPORTS | |
| VENDOR EQUIPMENT DATA UPDATES (NOV. 01, 1979) VENDER DOCUMENTATION (DIGITAL COMPUTER SYSTEM) (MAY 20, 1977) | |
| WELDING PROCEDURES, AND RADIOGRAPHIC SHOOTING SKETCHES |
| << Prev | Next >> |