AENOR Datasheets for Standards and Technical Documents
Standards and technical documents includes standards, codes, regulation, handbooks, manuals, comprehensive guides and other formal publications. Standards, codes, and regulation establish uniform specifications, procedures or technical criteria.
Standards and Technical Documents: Learn more
| Product Name | Notes |
|---|---|
| AERIAL CABLEWAYS. MONOSEAT CHAIR FOR CHAIRLIFTS. DIMENSIONS CHARACTERISTICS AND TEST | |
| AERIAL ROPEWAYS. PREFERED NOMINAL VALUES FOR THE PRINCIPAL DIMENSIONS OF THE ESSENTIAL ROPEWAY ELEMENTS | |
| AERIAL ROPEWAYS. SYMBOLS AND UNITS FOR CALCULATION OF ROPEWAYS | |
| AERIAL ROPEWAYS. TERMINOLOGY OF ROPES | |
| AERIAL ROPEWAYS. TERMINOLOGY OF TELEFERICS FOR MATERIALS | |
| AERIAL ROPEWAYS. TERMINOLOGY OF TELEFERICS FOR PEOPLE | |
| AERIAL ROPEWAYS. TERMINOLOGY OF THE FUNICULAR CRANE (BLONDIN) | |
| Basis of calculations for S/R machines. Tolerances, deformations and clearances in automatic small parts warehouses (not silo design) | |
| CALIBRATED ROUND STEEL LINK LIFTING CHAINS. GUIDELINES TO PROPER USE AND MAINTENANCE | |
| CELL DIMENSIONS OF TRACTION BATTERIES | |
| Centralized installation of gas meter of 6 m3/h of maximum capacity by means of prefabricated assemblies. | |
| Centralized installation of gas meters up to 6 m³/h of maximum capacity with prefabricated assemblies. | |
| Centralized installation of gas meters up to 6 m3/h of maximum capacity with prefabricated assemblies. | |
| CHAIN SLINGS ASSEMBLED BY METHODS OTHER THAN WELDING. GRADE T(8) | |
| CHAIN SLINGS OF WELDED CONSTRUCTION. GRADES M(4), S(6) AND T(8) | |
| CLASSIFICATION OF GASEOUS FUELS IN FAMILIES. | |
| CLASSIFICATION OF GASEOUS FUELS IN FAMILIES | |
| Compressed natural gas filling stations. Part 1: Stations with supply capacity above 20 m3/h. | |
| CONTINUOUS MECHANICAL HANDLING EQUIPMENT FOR LOOSE BULK MATERIALS AND UNIT LOADS. BELT CONVEYORS. BASIC CHARACTERISTICS OF MOTORIZED DRIVING PULLEYS. | |
| CONTINUOUS MECHANICAL HANDLING EQUIPMENT FOR LOOSE BULK MATERIALS. AEROSLIDES. | |
| CONTINUOUS MECHANICAL HANDLING EQUIPMENT FOR LOOSE BULK MATERIALS. APRON CONVEYORS. | |
| Counterbalanced fork-lift trucks. Stability tests. | |
| Counterbalanced trucks handling freight containers of 6 m (20 ft) and above. Additional stability tests. | |
| DEFECTOR FOR COMBUSTION PRODUCT EVACUATION DUCTS FOR GAS APPLIANCES. | |
| Design, construction, assembly and operation of LPG filling stations for gas-engine vehicles. | |
| EYEBOLTS FOR GENERAL LIFTING PURPOSES | |
| FOOT-WEAR. BASIC CONCEPTS AND CRITERIA FOR AN INFORMATION LABELLING DESIGNATED TO USERS | |
| Footwear material. Coated fabrics. Requirements and test methods | |
| Footwear materials. Elastics. Determination of fatigue resistance to repeated stretching. | |
| Footwear materials. Elastics. Determination of tensile performance. | |
| FOOTWEAR MATERIALS. HEELS. DETERMINATION OF ATTACHMENT RESISTANCE. | |
| Footwear materials. Laces. Determination of tensile strength | |
| FOOTWEAR MATERIALS. LACES. DETERMINATION TENSILE STRENGTH. | |
| FOOTWEAR MATERIALS. SOLING. DETERMINATION OF FLEXING RESISTANCE ON TEST PIECES. | |
| FOOTWEAR MATERIALS. SOLING. DETERMINATION OF FLEXING RESISTANCE ON THECOMPLETE SOLE. | |
| FOOTWEAR MATERIALS. SOLING. DETERMINATION OF PARALLEL TEAR RESISTANCE IN CELLULAR MATERIALS. | |
| FOOTWEAR MATERIALS. SOLING. MEASURING HEAT SHRINKAGE OF CELLULAR MATERIALS. | |
| FOOTWEAR MATERIALS. SOLING. PREPARATION OF TEST PIECES FOR PHYSICAL TESTING. | |
| FOOTWEAR MATERIALS. STIFFENERS. DETERMINATION OF DEFORMATIONS RESISTANCE AND RECUPERATION CAPACITY. | |
| Footwear. Area measurements in soles | |
| Footwear. Child and school shoes. Specifications and test methods. | |
| FOOTWEAR. DESIGNATION OF SIZES. MAIN CHARACTERISTICS OF THE CONTINENTAL SYSTEM. | |
| FOOTWEAR. DETERMINATION OF SOLE BOND PEELING STRENGTH. | |
| FOOTWEAR. DETERMINATION OF THE RUBBING RESISTANCE OF LEATHER AND SYNTHETIC MATERIALS FOR SHOE UPPERS USING RUBBER. | |
| Footwear. Determination of the rubbing resistance of leather and synthetic materials for shoe uppers using rubber | |
| FOOTWEAR. HEEL PIN HOLDING STRENGTH OF FIBREBOARD. | |
| FOOTWEAR. LEISURE FOOTWEAR. SPECIFICATIONS AND TEST METHODS. | |
| Footwear. Materials for uppers, lining and insocks. Determination of heavy metals content extractable by acid perspiration solution in textile materials for footwear. Part 1: Determination of Cd, Ni, Cr, Co,... | |
| Footwear. Materials for uppers, lining and insocks. Determination of heavy metals content extractable by acid perspiration solution in textile materials for footwear. Part 2: Determination of As and Hg. | |
| Footwear. Materials for uppers, lining and insocks. Determination of the content of pentachlorophenol in textiles. | |
| FOOTWEAR. MEN'S FOOTWEAR. SPECIFICATIONS AND TEST METHODS. | |
| FOOTWEAR. RESISTANCE OF FIBREBOARD TO STITCH-TEAR. | |
| Footwear. Safety requirements for infants’ and children’s footwear. Physical and mechanical properties. Specifications and test methods | |
| FOOTWEAR. SCHOOL SHOES FOOTWEAR. SPECIFICATIONS AND TEST METHODS. | |
| Footwear. Specifications for the content in chemical substances and elements of footwear and footwear components. | |
| FOOTWEAR. TENSILE STRENGTH OF FIBREBOARD. | |
| Footwear. Test methods for soles, heels and rigid platforms. Fatigue resistance. | |
| Footwear. Test methods for soles. Compression fatigue resistance of cellular materials. | |
| Footwear. Test methods for soles. Determination of global density. | |
| FOOTWEAR. TESTING OF SOLVENT AND DISPERSION ADHESIVES. TEST FOR VERIFYING THE BOND ABILITY OF SHOE MATERIALS | |
| FOOTWEAR. WOMEN'S FOOTWEAR. SPECIFICATIONS AND TEST METHODS. | |
| FORGED SHACKLES FOR GENERAL LIFTING PURPOSES. DEE SHACKLES AND BOW SHACKLES | |
| FORGED STEEL LIFTING COMPONENTS FOR USE WITH GRADE T(8) CHAIN | |
| FORGED STEEL LIFTING HOOKS WITH POINT AND EYE FOR USE WITH STEEL CHAINS OF GRADE M(4). | |
| FORGED STEEL LIFTING HOOKS WITH POINT AND EYE FOR USE WITH STEEL CHAINS OF GRADE T(8). | |
| FORK LIFT TRUCKS. FORM ARMS. DIMENSIONS | |
| FORK LIFT TRUCKS. HOOK ON TYPE FORK ARMS. DIMENSIONS OF ASEMBLY | |
| FORK LIFT TRUCKS. HOOK ON TYPE FORK ARMS. VOCABULARY | |
| FORK-LIFT TRUCKS. HOOK-ON TYPE FORK ARMS AND FORK ARM CARRIAGES. MOUNTING DIMENSIONS. | |
| Fork-lift truks. Fork arms. Technical characteristics and testing. | |
| Free outlet regulators for self-closing valves intended to the connection of apparatus or gas installations to GLP refillable bottles. | |
| GAS BOILERS INSTALLATION FOR HEATING AND/OR HOT WATER USEFUL OUTPUT ABOVE 70 KW (60 200 KCAL/H). | |
| Gas boilers installation for heating and/or sanitary hot water uses with output above 70 kW. | |
| Gas fuels. Packages of regulation and measure pressure for domestic, collective and commercial uses with entry pressure up to 4 bar. Part 1: Packages for built-in, attachement or enclosure. | |
| GAS FUELS: PACKAGES OF REGULATION AND MEASURE PRESSURE FOR DOMESTIC, COLLECTIVE AND COMMERCIAL USES WITH ENTRY PRESSURE UP TO 4 BAR. PART 1: PACKAGES FOR BUILT-IN, ATTACHEMENT OR ENCLOSURE. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 10: STARTING SERVICE OF GAS APPLIANCES. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 10: STARTING SERVICE. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 11: INSTALLATIONS, CONNECTION AND GAS APPLIANCES START. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 11: OPERATIONS ON RECEIVING INSTALLATION AND GAS APPLIANCES IN SERVICE. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 12: OPERATIONS IN SERVICE INSTALLATIONS. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 12: TECHNICAL CRITERIA FOR PERIODIC INSPECTION OF RECEIVING INSTALLATIONS IN SERVICE. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 13: TECHNICAL CRITERIA FOR THE PERIODIC INSPECTION OF GAS APPLIANCES CONNECTED TO RECEIVING INSTALLATION IN SERVICE. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 13: TECHNICAL CRITERIONS FOR REVISION OF GAS RECEIVING INSTALLATION IN BP, MPA, MPB, CONNECTION AND GAS APPLIANCES LOCATION PREMISES. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 1: GENERAL. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 1: TERMINOLOGY. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 2: MATERIALS OF GAS INSTALLATIONS. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 2: TERMINOLOGY. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 3: PIPES, ELEMENTS, ACCESORIES AND THEIR UNIONS. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 3: PRESSURE REGULATORS. LOCATION AND INSTALLATION. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 4: DESIGN AND CONSTRUCTION. | |
| GAS INSTALLATIONS FOR DOMESTIC, COLLECTIVE OR COMMERCIAL PREMISES. PART 4: PREMISES OF METERS INSTALLATIONS. | |
| GAS INSTALLATIONS FOR INDUSTRIAL USE; LOW AND MEDIUM PRESSURE SUPPLY. PART 1: GENERAL. | |
| GAS INSTALLATIONS FOR INDUSTRIAL USE; LOW AND MEDIUM PRESSURE SUPPLY. PART 2: SERVICES PIPES. | |
| GAS INSTALLATIONS FOR INDUSTRIAL USE; LOW AND MEDIUM PRESSURE SUPPLY. PART 3: METERING AND PRESSURE REGULATING STATIONS. | |
| GAS INSTALLATIONS FOR INDUSTRIAL USE; LOW AND MEDIUM PRESSURE SUPPLY. PART 4: INSTALLATION PIPES. | |
| GAS INSTALLATIONS FOR INDUSTRIAL USE; LOW AND MEDIUM PRESSURE SUPPLY. PART 5: REGULATION EQUIPMENT. | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 10: Checking for the commissioning of gas appliances or after conversion due to a... | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 10: Verifying of maintain of the safety conditions of the appliances in their installation... | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 11: Operations on installations pipework in service. | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 12: Technical criteria for periodic inspection of the installations pipework in service. | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 12: Technical criteria for periodic inspection of the pipework installations in service. | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 13: Technical criteria for periodic inspection of gas appliances connected to the installations pipework... | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 1: General. | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 2: Terminology. | |
| Gas installations pipework supplied at maximum operating pressure (MOP) up to and including 5 bar. Part 3: Pipework, elements, fittings and their unions. | |
| GAS PIPELINES. MINIMUM WALL THICKNESS FOR STEEL PIPES | |
| Gas pressure regulating stations for distribution of gas supply at an inlet pressure below 16 bar. | |
| Gas pressure regulating stations for distribution of gas supply at an inlet pressure not above 16 bar. | |
| Gas supply pipelines for maximum operating pressure above 5 bar and up to and including 16 bar. | |
| Gas supply pipelines for maximum operating pressure up to and including 5 bar. | |
| Gas supply systems. Pipelines for maximum operating pressure above 5 bar and up to and including 16 bar. | |
| Gas supply systems. Pipelines for maximum operating pressure up to and including 5 bar. | |
| GAS VOLUME CORRECTORS | |
| GASEOUS FUELS PIPELINE. LOCATION | |
| GASEOUS FUELS. DIAPHRAGM DOMESTIC METER SUPPORTS FOR GASEOSOUS FUELS. | |
| Gaseous fuels. Diaphragm domestic meter supports for gaseous fuels. Part 1: Meters placed inside households or inside technical premises placed outside. | |
| Gaseous fuels. Diaphragm domestic meter supports for gaseous fuels. Part 2: Meters placed outside. | |
| GASEOUS FUELS. MPA/BP REGULATOR WITH AN INCORPORATED LOW PRESSURE CUT-OFF SAFETY VALVE WITH AN EQUIVALENT FLOW RATE UP TO 4,5 M3(N)/H OF AIR. | |
| GASEOUS FUELS. POLIETHYLENE CONNECTIONS TO RECEIVING INSTALLATIONS WITH SERVICE PRESSURE UP TO 4 BAR. | |
| Gaseous fuels. Pressure regulator with a maximum inlet pressure (MOPe) greater than 0,4 bar and up to 5 bar and a maximum outlet pressure (MOPs) up to 0,4 bar. | |
| Gaseous fuels. Pressure regulator with an inlet MOP up to 0,4 bar and an oulet MOP up to 0,05 bar. Part 2: Regulator with a MOP greater than 150 mbar,... | |
| Gaseous fuels. Pressure regulator with an inlet MOP up to 0,4 bar and an outlet MOP up to 0,05 bar with an incorporated low pressure cut-off safety valve with an... | |
| Gaseous fuels. Pressure regulator with an inlet MOP up to 0,4 bar and an outlet MOP up to 0,05 bar. Part 1: Regulators with an incorporated low pressure cut-off safety... | |
| Gaseous fuels. Pressure regulator with an inlet MOP up to 0,4 bar and an outlet MOP up to 0,05 bar. Part 2: Regulator with a MOP greater than 150 mbar,... | |
| Gaseous fuels. Regulation pressure and /or measurement packages with a maximum operating pressure up to 5 bar. Part 2: Regulation packages to place in small chest built in a public... | |
| Gaseous fuels. Regulation pressure and/or measurement packages with a maximum operating pressure up to 5 bar. Part 1: Packages to built in, attach or place in enclosures with an equivalent... | |
| Gaseous fuels. Regulation pressure and/or measurement packages with a maximum operating pressure up to 5 bar. Part 2 : Regulation packages to place in small chest built in a public... | |
| Gaseous fuels. Regulation pressure and/or measurement packages with a maximum operating pressure up to 5 bar. Part 2: Regulation packages to place in small chest built in a public way... | |
| Gaseous fuels. Regulation pressure and/or measurement packages with a maximum operating pressure up to 5 bar. Part 3: Packages to built in, attach or place in enclosures with an equivalent... | |
| Gaseous fuels. Regulation pressure and/or measurement packages with a maximum operating pressure up to 5 bar. Part 4: Regulation pressure and/or measurement packages for diaphragm gas meters | |
| Gaseous fuels. Sizes, connections and superficial finishes of the diaphragm volume gas meters. | |
| Gaseous fuels. Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 1: General Requirements. | |
| Gaseous fuels. Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 3: Mechanical connections that can be... | |
| Gaseous fuels. Transition mechanical connections PE-metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 1: General requirements. | |
| Gaseous fuels. Transition mechanical connections PE-metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2: Fixed mechanical connections. | |
| Gasseous fuels. MPA/BP regularot with an incorporated low pressure cut-off safety valve with an equivalent flow rate up to 4,8 m3 (n)/h of air. | |
| Gasseous fuels. MPA/BP regulator with an incorporated low pressure cut-off safety valve with an equivalent flow rate up to 4,8 m3 (n)/h of air. | |
| GENERAL PURPOSE THIMBLES FOR USE WITH STEEL WIRE ROPES. SPECIFICATION | |
| HAND OPERATED STILLAGE TRUCKS. PRINCIPAL DIMENSIONS | |
| HOOKS FOR LIFTING FREIGH CONTAINERS OF UP TO 30 TONNES CAPACITY. BASIC REQUIREMENTS | |
| ILLUSTRATED TERMINOLOGY OF CABLEWAY DRAG SCRAPER | |
| ILLUSTRATED TERMINOLOGY OF DRAG SCRAPER | |
| INDUSTRIAL CASTORS. DIMENSIONS OF TOP-PLATES. OBLONG TOP-PLATES CERTH 4 BOLT HOLES | |
| INDUSTRIAL TRACTORS. DEFINITION AND NOMINAL RATING. | |
| INDUSTRIAL TRUCKS. CONNECTORS FOR TRACTION BATTERIES UP TO AND INCLUDING 96 V. DIMENSIONS. | |
| INDUSTRIAL TRUCKS. DIMENSIONS OF STILLAGES. CONNECTION GAUGE | |
| INDUSTRIAL TRUCKS. ELECTRIC TRUCKS. DIMENSIONS OF TRACTION BATTERY CELLS. | |
| INDUSTRIAL TRUCKS. ELECTRIC TRUCKS. SPECIFICATION OF STANDARD CONNECTORS FOR TRACTION BATTERIES TYPE 160/320A TO 24; 36; 48; 72 AND 80 V. DIMENSIONS. | |
| INDUSTRIAL TRUCKS. INSPECTION AND REPAIR OF FORK ARMS IN SERVICE ON FORK LIFT TRUCKS | |
| INDUSTRIAL TRUCKS. INSPECTION AND REPAIR OF FORK ARMS IN SERVICE ON FORK-LIFT TRUCKS. | |
| INDUSTRIAL TRUCKS. LEAD-ACID TRACTION BATTERIES FOR ELECTRIC TRAUCKS. PREFERRED VOLTAGES. | |
| INDUSTRIAL TRUCKS. SAFETY RULES | |
| Industrial trucks. Specification for indicator lights for container handling and grappler arm operations. | |
| INDUSTRIAL TRUCKS. TRACTION BATTERIES FOR ELECTRIC TRUCKS. VOLTAGES | |
| INDUSTRIAL TRUCKS. TRANSPALLET. DIMENSIONAL CHARACTERISTICS | |
| INDUSTRIAL TRUCKS. WHEELS AND CASTORS. VOCABULARY | |
| Industrial tucks operating in special condition of stacking with mast tilted forward. Additional stability test. | |
| INDUSTRIAL WHEELS FOR NON-POWERED EQUIPMENT. DIMENSIONS AND NOMINAL LOAD CAPACITIES | |
| INSTALLATION OF GAS BOILERS FOR HEATING AND/OR HOT WATER WITH USEFUL OUTPUT ABOVE 70 KW (60 200 KCAL/H) | |
| Installations for the storage of GLP in fixed vessels for its use in installations. | |
| INSTRUCTION GUIDE FOR THE OPERATION AND MAINTENANCE OF MOBILE CRANES | |
| Instructions for installation, handling, maintenance, revisions and examinations of mobile elevating work platforms. | |
| Instructions for the litting, handling, check and revisions of mobile elevationg work platforms. | |
| Interrupting security valve on minimun pressure for gas installations with a flow of up to 4,8 m3 (n)/h of air. | |
| Leather — Physical and mechanical tests — Specimen and test piece conditioning | |
| LEATHER. COLOUR FASTNESS OF LEATHER IN RESPECT OF STAINING PLASTICISED POLY(VINYLCHLORIDE). | |
| LEATHER. COLOUR FASTNESS TO SPOTTING. WATER | |
| LEATHER. COLOUR FASTNESS TO TO-AND-FRO RUBBING OF LEATHER. | |
| LEATHER. COLOUR FASTNESS TO WASHING OF LEATHER. | |
| LEATHER. CONDITIONING OF TEST PIECES FOR PHYSICAL TESTS | |
| LEATHER. DETERMINATION OF ABSORPTION OF WATER | |
| LEATHER. DETERMINATION OF APPARENT DENSITY. | |
| LEATHER. DETERMINATION OF APPARENT DENSITY | |
| LEATHER. DETERMINATION OF CACHALOT OIL OF LEATHER | |
| LEATHER. DETERMINATION OF CHROMIUM CONTENT | |
| LEATHER. DETERMINATION OF COLOUR FASTNESS TO PERSPIRATION. | |
| LEATHER. DETERMINATION OF DISTENSION AND STRENGTH OF GRAIN. BALL BURST TEST | |
| LEATHER. DETERMINATION OF DYNAMIC WATERPROOFNESS FOR FOOTWEAR SOLE LEATHER | |
| LEATHER. DETERMINATION OF INNER TANNING | |
| LEATHER. DETERMINATION OF MATTER SOLUBLE IN DICHLOROMETHANE | |
| LEATHER. DETERMINATION OF MIGRATION IN COLOURED MATERIALS BY BLEEDING. | |
| LEATHER. DETERMINATION OF NITROGEN CONTENT AND "HIDE SUBSTANCE". TITRIMETRIC METHOD | |
| LEATHER. DETERMINATION OF PH | |
| LEATHER. DETERMINATION OF RESISTANCE TO GRAIN CRACKING, AND OF CRACK INDEX | |
| LEATHER. DETERMINATION OF SHRINKAGE TEMPERATURE | |
| LEATHER. DETERMINATION OF SULPHATED TOTAL ASH AND SULPHATED WATER-INSOLUBLE ASH | |
| LEATHER. DETERMINATION OF TEARING LOAD | |
| LEATHER. DETERMINATION OF TENSILE STRENGTH AND ELONGATION. | |
| LEATHER. DETERMINATION OF THE COLD CRACK RESISTANCE OF FINISHES. | |
| LEATHER. DETERMINATION OF THE CRACKING RESISTANCE OF PATENT LEATHER THROUGH STRETCHING UNDER HEAT. | |
| LEATHER. DETERMINATION OF TOTAL SILICON CONTENT. REDUCED MOLYBDOSILICATE SPECTROMETRIC METHOD | |
| LEATHER. DETERMINATION OF WASHABLE ORGANIC AND INORGANIC MATERIALS (WASHING LOSS). | |
| LEATHER. DETERMINATION OF WASHABLE ORGANIC AND INORGANIC MATERIALS (WASHING LOSS) | |
| LEATHER. DETERMINATION OF WATER AND OTHER VOLATILE SUBSTANCES CONTENT | |
| LEATHER. DETERMINATION OF WATER VAPOUR ABSORPTION AND DESORPTION AND RELATED CHANGES OF DIMENSIONS. | |
| LEATHER. DETERMINATION OF WATER-SOLUBLE MAGNESIUM SALTS (EPSOM SALT). EDTA TITRIMETRIC METHOD | |
| LEATHER. LABORATORY SAMPLES. LOCATION AND IDENTIFICATION | |
| LEATHER. MEASUREMENT OF AREA. | |
| LEATHER. MEASUREMENT OF THE FLEXING ENDURANCE OF LIGHT LEATHERS AND THEIR SURFACE FINISHES | |
| LEATHER. MEASUREMENT OF THE WATER VAPOUR ABSORPTION AND PERMEABILITY. KINETIC TEST. | |
| LEATHER. METHOD FOR MEASUREMENT OF THICKNESS OF SURFACE COATINGS. | |
| LEATHER. PHYSICAL TESTING. MEASUREMENT OF THICKNESS. | |
| LEATHER. PHYSICAL TESTING. MEASUREMENT OF THICKNESS | |
| Leather. Physical tests. Determination of the performance in boiling water. | |
| LEATHER. PHYSICAL TESTS. DETERMINATION OF WATER VAPOR PERMEABILITY. | |
| LEATHER. PHYSICAL TESTS. DETERMINATION OF WATER VAPOUR PERMEABILITY. | |
| LEATHER. PREPARATION OF CHEMICAL TEST SAMPLES | |
| LEATHER. RAW HIDES OF CATTLE AND HORSES. METHOD OF TRIM | |
| LEATHER. RAW HIDES OF CATTLE AND HORSES. PRESERVATION BY STACK SALTING | |
| LEATHER. SAMPLING. NUMBER OF ITEMS FOR A GROSS SAMPLE | |
| Leather. Sole leather specifications. | |
| LEATHER. SOLE LEATHER SPECIFICATIONS | |
| Leather. Strain-free surface area measurement using optoelectronic equipment. | |
| LEATHER. TEST FOR ADHESION OF FINISHED LEATHER. | |
| LEATHER. WATER RESISTANCE TEST FOR SHOE UPPER LEATHER AND OTHER FLEXIBLE LEATHERS. | |
| Lift (US: Elevator) installation. Part 1:Class I, II, III and VI lifts. | |
| LIFT INSTALLATION. PART 1: LIFTS OF CLASSES I, II AND III. | |
| LIFTING APPLIANCES. CLASSIFICATION. MOBILE CRANES | |
| LIFTING APPLIANCES. VOCABULARY. MOBILE CRANES | |
| LIFTING HOOKS. GENERAL CHARACTERISTICS | |
| LIFTING HOOKS. NOMENCLATURE | |
| LIFTS AND SERVICE LIFTS (USA: ELEVATORS AND DUMWAITERS). PART 6: PASSENGER | |
| LIFTS AND SERVICE LIFTS. CONTROL DEVICES, SIGNALS AND ADDITIONAL FITTINGS. | |
| LIFTS FOR VEHICULES. SAFETY RULES | |
| Liquefied natural gas (LNG) satellite terminals. | |
| Liquefied natural gas (LNG). Static measurement - Procedure for calculating the quantities transferred. | |
| Liquefied natural gas installations. | |
| Low pressure, non adjustable regulators having a maximum outlet pressure of less than or equal to 200 mbar with a capacity of less than or equal to 4 kg/h, and... | |
| LOW-PRESSURE, NON ADJUSTABLE REGULATORS HAVING A MAXIMUM OUTLET PRESSURE OF LESS THAN OR EQUAL TO 200 MBAR WITH A CAPACITY OF LESS THAN OR EQUAL TO 4 KG/H, AND THEIR... | |
| LPG filling stations. | |
| Machines rooms and gas fired self contained apparatus for heating or cooling generation or cogeneration. | |
| MOBILE CRANE. HIDRAULIC EQUIPMENT | |
| MOBILE CRANES. APPROPIATE SPEEDS | |
| MOBILE CRANES. DRUM AND SHEAVE SIZES | |
| MOBILE CRANES. ELECTRICAL EQUIPMENT | |
| MOBILE CRANES. INTERNAL COMBUSTION ENGINES | |
| MOBILE CRANES. PNEUMATIC EQUIPMENT | |
| Mobile cranes. Vocabulary. | |
| Mobile elevating work platforms (MEWP). Operator training | |
| Natural gas -- Calculation of calorific values, density, relative density and Wobbe index from composition | |
| Natural gas -- Calculation of compression factor. Part 1: Introduction and guidelines. | |
| Natural gas -- Calculation of compression factor. Part 3 : Calculation using physical properties. | |
| Natural gas -- Calculation of compression factor. Partie 2: Calculation using molar-composition analysis. | |
| NATURAL GAS RECEIVING INSTALLATIONS HIGH PRESSURE SUPPLY. PART 1: GENERALITIES | |
| NATURAL GAS RECEIVING INSTALLATIONS HIGH PRESSURE SUPPLY. PART 2: SERVICE PIPES | |
| NATURAL GAS RECEIVING INSTALLATIONS HIGH PRESSURE SUPPLY. PART 3: METERING AND PRESSURE REGULATING STATIONS. | |
| NATURAL GAS RECEIVING INSTALLATIONS HIGH PRESSURE SUPPLY. PART 3: METERING AND PRESSURE REGULATING STATIONS | |
| NATURAL GAS RECEIVING INSTALLATIONS HIGH PRESSURE SUPPLY. PART 4: INSTALLATION PIPES | |
| NATURAL GAS RECEIVING INSTALLATIONS HIGH PRESSURE SUPPLY. PART 5: REGULATION EQUIPMENT | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 1: Generalities. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 2: Service lines and inner distribution lines. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 2: Service pipes. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 3: Metering and pressure regulating stations. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 3: Metering and pressure regulating stations | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 4: Installation Pipes. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 4: Regulation equipment. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 5: Basic technical criteria for the periodic control in operating receiving installations. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 5: Regulation equipment. | |
| Natural gas receiving installations with pressure supply over 5 bar. Part 6: Criterias for the periodic control in receiving installations. | |
| NEUMATIC MAINTAINING DEVICES. TERMINOLOGY OF PROCEEDINGS AND DEVICES | |
| NON-CALIBRATED ROUND STEEL LINK LIFTING CHAIN AND CHAIN SLINGS. USE AND MAINTENANCE | |
| Pallet stackers and high-lift platform trucks. Stability tests. | |
| PALLET TRUCKS. PRINCIPAL DIMENSIONS. | |
| PASSENGER LIFT INSTALLATION. LIFTS FOR HOTELS | |
| PASSENGER LIFT INSTALLATIONS. PART 3: SERVICE LIFTS CLASS V | |
| Passenger lifts and service lifts. Guide rails for lifts and counterweights. T-type. | |
| PASSENGER LIFTS AND SERVICE LIFTS. GUIDE RAILS FOR LIFTS AND COUNTERWEIGHTS. T-TYPE | |
| Passenger lifts and service lifts. Guide rails for lifts cars and counterweights. T-type. | |
| PASSENGER LIFTS INSTALLATIONS. PART 2: LIFTS OF CLASS IV | |
| PERFORANCE DATE OF STORAGE AND RETRIEVAL MACHINES. CYCLE TIMES | |
| Periodic Safety Inspection Guide of Industrial Trucks | |
| Pipelines for gaseous fuels. Emplacement. | |
| Pipelines for gaseous fuels. Minimum wall thickness for steel pipes. | |
| PNEUMATIC HANDLING APPLIANCES FOR LOOSE BULK MATERIALS. PIPING. | |
| Powered industrial trucks and tractors. Brake performance and component strength. | |
| POWERED INDUSTRIAL TRUCKS. CONTROL SYMBOLS | |
| POWERED INDUSTRIAL TRUCKS. SAFETY CODE | |
| Powered industrial trucks. Safety signs and hazard pictorials. General principles. | |
| Powered industrial trucks. Symbols for operator controls and other displays. | |
| POWERED INDUSTRIAL TRUCKS. TERMINOLOGY. | |
| Pressure regulators for gas receiving installations with a maximum inlet operating pressure (MOPe) greater than 0,4 bar and up to 5 bar and a maximum outlet operating pressure (MOPs) up... | |
| Pressure regulators for gas receiving installations with an inlet MOP up to 0,4 bar and an outlet MOP up to 0,15 bar. Part 1: Regulators with an outlet MOP up... | |
| Pressure regulators for gas receiving installations with an inlet MOP up to 0,4 bar and an outlet MOP up to 0,15 bar. Part 2: Regulators for the second family gases,... | |
| Preventive maintenance of lifting appliances | |
| Reach and straddle fork-lift trucks. Stability tests. | |
| Refrigerated hydrocarbon liquids -- Static measurement -- Calculation procedure. | |
| Regulation and measurement packages with an inlet pressure in MOP up to 0,4 bar, placed in wardrobes to build in or to lean against walls with an equivalent nominal flow... | |
| Regulation and measurement packages with an inlet pressure in MOP up to 0,4 bar, placed in wardrobes to encastre or to lean against walls with an equivalent nominal flow up... | |
| REGULATION OF GAS PRESSURE ASSEMBLY WITH NOMINAL MAXIMUM FLOW OF 20 M3/H AND INPUT PRESSURE OF 0,05 MPA (0,5 BAR) TO 0,4 MPA (4 BAR) | |
| Room machines and gas fired self contained apparatus for heating or cooling generation or cogeneration. | |
| ROPEWAYS. COUPLINGS FOR JOINNING THE CABLE OF A ROPEWAY | |
| RULES FOR THE DESIGN OF STORAGE AND RETRIEVAL MACHINES. .STRUCTURES. | |
| RULES FOR THE DESIGN OF THE STEEL STRUCTURES OF GENERAL USE MOBILE CRANES. | |
| RULES OF DESIGN. STORAGE AND RETRIEVAL MACHINES | |
| SAFETY RULES FOR STORAGE AND RETRIEVAL MACHINES. | |
| SAFETY RULES FOR THE CONSTRUCTION AND INSTALLATION OF ESCALATORS AND PASSENGER CONVEYORS | |
| SAFETY RULES FOR THE CONSTRUCTION AND INSTALLATION OF LIFTS AND SERVICE LIFTS. PART 1: ELECTRIC LIFTS | |
| SAFETY RULES FOR THE CONSTRUCTION AND INSTALLATION OF LIFTS AND SERVICE LIFTS. PART 2: HYDRAULIC LIFTS. | |
| SAFETY RULES FOR THE CONSTRUCTION AND INSTALLATION OF LIFTS AND SERVICE LIFTS. PART 2: HYDRAULIC LIFTS | |
| SELF-PROPELLED INDUSTRIAL TRUCKS SIT-DOWN RIDER-CONTROLLED. RULES FOR THE CONSTRUCTION AND LAYOUT OF PEDALS | |
| SERIAL HOIST UNITS. MEASURES FOR ACHIEVING SAFE WORKING PERIODS FOR MOTORIZED SERIAL HOIST (S.W.P.). | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 1: RULES FOR THE CALCULATION OF LOCAL GIRDER STRESSES. | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 2: CLASSIFICATION OF MECHANISM. | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 3: DIMENSIONS AND DESIGN OF ROPE REEVING COMPONENTS. | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 4: CHAIN QUALITIES, SELECTION CRITERIA AND REQUIREMENTS. | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 5: SELECTION OF TRAVEL MOTORS. | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 6: SELECTION OF LIFTING MOTORS. | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 7: SPECIFICATION OF ELECTRIC HOISTS (CABLE AND CHAIN). | |
| SERIES LIFTING EQUIPMENT. BLOCK HOISTING. PART 8: CONTROL SYMBOLS. | |
| SERIES LIFTING EQUIPMENT. POWER LIFTING LIMITATION DEVICES FOR THE CONTROL OF SOLICITATIONS ON LIFTING MECHANISM. | |
| SERIES LIFTING EQUIPMENT. RULES FOR THE DESIGN OF STORAGE AND RETRIEVAL MACHINES. MECHANISMS. | |
| SERIES LIFTING EQUIPMENT. RULES FOR THE DESING OF SERIES LIFTING EQUIPMENT. CONTROL SYMBOLS. | |
| Service shutoff valves for gaseous fuels distribution networks. Part 1: Globe valves with metallic body for gas networks with Maximum Operating Pressure not exceeding 5 bar | |
| SHORT LINK CHAIN FOR LIFTING PURPOSES. GENERAL CONDITIONS OF ACCEPTANCE | |
| SHORT LINK CHAIN FOR LIFTING PURPOSES. GRADE M(4) NON-CALIBRATED, FOR CHAIN SLINGS, ETC. | |
| SHORT LINK CHAIN FOR LIFTING PURPOSES. GRADE S (6), NON-CALIBRATED, FOR CHAIN SLINGS, ETC. | |
| SHORT LINK CHAIN FOR LIFTING PURPOSES. GRADE T (8), CALIBRATED, FOR CHAIN HOISTS AND OTHER LIFTING APPLIANCES. | |
| SHORT LINK FOR LIFTING PURPOSES. GRADE T(8), NON-CALIBRATED, FOR CHAIN SLINGS, ETC | |
| SINGLE LIFTING HOOKS WITH SHANK. CAPACITY UP TO 25 TONNES | |
| SOCKETS FOR WIRE ROPES FOR GENERAL PURPOSES. PART 1: GENERAL CHARACTERISTICS AND CONDITIONS OF ACCEPTANCE. | |
| SOCKETS FOR WIRE ROPES FOR GENERAL PURPOSES. PART 2: SPECIAL REQUIREMENTS FOR SOCKETS PRODUCED BY FORGING OR MACHINED FROM THE SOLID. | |
| SOCKETS FOR WIRE ROPES FOR GENERAL PURPOSES. PART 3: SPECIAL REQUIREMENTS FOR SOCKETS PRODUCED BY CASTING. | |
| STANDARD FOR MOBILE CRANES. | |
| STANDARD FOR MOBILE CRANES | |
| STANDARDIZATION OF TRACTION BATTERIES. TERMINOLOGY | |
| STEEL GAS PIPELINES. SECURITY AREAS AND DESIGN FACTORS | |
| Steel pipelines for gaseous fuels. Safety zones and design coefficients according to their emplacement. | |
| STORAGE AND RETRIEVAL (S/R) MACHINES. DEFINITIONS. | |
| Storage and retrieval machines. Calculation principles of storage and retrieval machines. Tolerances, deformations and clearances in the high-bay warehouse. | |
| Storage and retrieval machines. Cycle times. | |
| STORAGE AND RETRIEVAL MACHINES. RELIABILITY AND AVAILABILITY | |
| Storage and retrieval machines. Terminology. Definitions. | |
| SUGGESTIONS FOR THE SUBSTITUTION OF CABLES FOR ROPEWAYS AND CHAIR LIFTS | |
| Title missing - Legacy paper document | |
| Training for operators of industrial trucks till 10 000 kg. | |
| Training for operators of industrial trucks till 10 000 kg | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 1 : General Requirements. | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2 : Fixed mechanical connections. | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 2: Fixed mechanical connections. | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 3 : Mechanical connections that can be taken... | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a maximum operation pressure up to 10 bar. Part 3: Mechanical connections that can be taken to... | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a service pressure up to 10 bar. Part 1 : General Requirements. | |
| Transition mechanical connections PE - metals, for mains, connections and receiving installations with a service pressure up to 10 bar. Part 2 : Fixed mechanical connections. | |
| TROLLEYS INTENDED FOR SELF-SERVICE STORE CLIENTELE. REQUIREMENTS, TESTING AND MARKING. | |
| TYPE G METERS CENTRALISATION UP 10 M3/H OF MAXIMUM CAPACITY TROUGH PREFABRICATED ASSEMBLIES FOR FIRST AND SECOND FAMILY GASES AT LOW PRESSURES | |
| UNE 58401:1973 | |
| UNE 58402:1977 | |
| UNE 58403:1977 | |
| UNE 58404:1981 | |
| UNE 58405:1977 | |
| UNE 58408:1976 | |
| UNE 58409:1977 | |
| UNE 58410:1975 | |
| UNE 58411:1977 | |
| UNE 58412:1978 | |
| UNE 58413:1977 | |
| UNE 58419:1980 | |
| UNE 58420:1976 | |
| UNE 58421:1975 | |
| UNE 58422:1979 | |
| UNE 58423:1977 | |
| UNE 58424:1977 | |
| UNE 58425:1979 | |
| UNE 58429:1981 | |
| UNE 58430:1980 | |
| UNE 58432:1984 | |
| UNE 58433:1984 | |
| UNE 58436:1981 | |
| UNE 58437:1980 | |
| UNE 58440:1982 | |
| UNE 58502:1978 | |
| UNE 58510:1980 | |
| UNE 58705:1979 | |
| UNE 58707:1983 | |
| UNE 58711:1988 ERRATUM | |
| UNE 58711:1988 | |
| UNE 59007:1966 | |
| UNE 59009:1966 | |
| UNE 59013:1966 | |
| UNE 59014:1966 | |
| UNE 59016:1966 | |
| UNE 59018:1966 | |
| UNE 59020:1966 | |
| UNE 59021:1966 | |
| UNE 59028:1988 | |
| UNE 60601:1978 IN | |
| UNE 60620-1:1984 | |
| UNE 60620-2:1984 | |
| UNE 60620-3:1984 | |
| UNE 60620-4:1984 | |
| UNE 60620-5:1984 | |
| VOLUMETRIC GAS METERS | |
| WHEELS AND CASTORS FOR NON-POWERED EQUIPMENT. OFF-SET FOR SWIVEL CASTORS | |
| WHEELS AND CASTORS. TRIANGULAR TOP PLATES WITH THREE FIXING HOLES | |
| Workshop for the installation and repair of vehicles using compressed natural gas: Premises, personnel, procedure and equipment requirements. | |
| Workshop for the installation and repair of vehicles using LPG: Premises, personnel, procedure and equipment requirements. |
| << Prev | Next >> |