Product Description
SP Industries manufactures two heavy industrial machines in the 6 cubic yard category. These durable machines are designed to handle large waste items and volumes up to 257 cubic yards per hour. Utilizing dual cylinders, these unique machines can generate enough force for you to get up to 10 to 1 compaction ratios. This allows heavy users to get the most out of every load that is sent to the landfill. Excellent for transfer stations and large industrial operations this compactor is built to provide years of trouble free service using the best components available.
Features
CP-6002
CP-6002HD
Large 96" x 58" Clear Top Opening
Meets or Exceeds ANSI Z245.2 Safety Standards
Motor 208/230/460 Volt 3PH ODP
30HP
30HP
UL Listed Electrical Components
Reservoir Tank Size
100 Gal.
100 Gal.
Heavy Duty Capacity Ratchet Binder/Hooks
Floor Support Beams
Upgraded
Upgraded
Cylinder Size
(2) 6"
(2) 7"
Pump Speed in GPM - Continuous Displacement
45
45
Cycle Time
54 sec.
77 sec.
Volume Displacement (Cu. Yds. per Hour)
257
180
Product Description
SP Industries manufactures two heavy industrial machines in the 6 cubic yard category. These durable machines are designed to handle large waste items and volumes up to 257 cubic yards per hour. Utilizing dual cylinders, these unique machines can generate enough force for you to get up to 10 to 1 compaction ratios. This allows heavy users to get the most out of every load that is sent to the landfill. Excellent for transfer stations and large industrial operations this compactor is built to provide years of trouble free service using the best components available.
| Features | CP-6002 | CP-6002HD |
| Large 96" x 58" Clear Top Opening | | |
| Meets or Exceeds ANSI Z245.2 Safety Standards | | |
| Motor 208/230/460 Volt 3PH ODP | 30HP | 30HP |
| UL Listed Electrical Components | | |
| Reservoir Tank Size | 100 Gal. | 100 Gal. |
| Heavy Duty Capacity Ratchet Binder/Hooks | | |
| Floor Support Beams | Upgraded | Upgraded |
| Cylinder Size | (2) 6" | (2) 7" |
| Pump Speed in GPM - Continuous Displacement | 45 | 45 |
| Cycle Time | 54 sec. | 77 sec. |
| Volume Displacement (Cu. Yds. per Hour) | 257 | 180 |