TruPosition TA1.00-Tooling Aids TA1.00-Tooling

Description
Features: A-2 Steel construction HT 58-62 R/C. The shaft is precision ground to the same diameter as TruPosition Probes. Features: A-2 Steel construction HT 58-62 R/C. The shaft is precision ground to the same diameter as TruPosition Probes. Instructions: Setting Probe Blocks to Position on Fixture Attach Probe Block to fixture with screws. Set the position of the block, with a CMM or other means, by using both ends of the Tooling Aid shaft to determine block alignment. Tighten screws. Remove tooling aid. Transfer drill and dowel (2 places) Install dowels. Recheck alignment (see #2).
Description
Features: A-2 Steel construction HT 58-62 R/C. The shaft is precision ground to the same diameter as TruPosition Probes. Features: A-2 Steel construction HT 58-62 R/C. The shaft is precision ground to the same diameter as TruPosition Probes. Instructions: Setting Probe Blocks to Position on Fixture Attach Probe Block to fixture with screws. Set the position of the block, with a CMM or other means, by using both ends of the Tooling Aid shaft to determine block alignment. Tighten screws. Remove tooling aid. Transfer drill and dowel (2 places) Install dowels. Recheck alignment (see #2).

Suppliers

Company
Product
Description
Supplier Links
TA1.00-Tooling Aids - TA1.00-Tooling - TruPosition
Wyoming, MI, United States
TA1.00-Tooling Aids
TA1.00-Tooling
TA1.00-Tooling Aids TA1.00-Tooling
Features: A-2 Steel construction HT 58-62 R/C. The shaft is precision ground to the same diameter as TruPosition Probes. Features: A-2 Steel construction HT 58-62 R/C. The shaft is precision ground to the same diameter as TruPosition Probes. Instructions: Setting Probe Blocks to Position on Fixture Attach Probe Block to fixture with screws. Set the position of the block, with a CMM or other means, by using both ends of the Tooling Aid shaft to determine block alignment. Tighten screws. Remove tooling aid. Transfer drill and dowel (2 places) Install dowels. Recheck alignment (see #2).

Features:

  • A-2 Steel construction HT 58-62 R/C.
  • The shaft is precision ground to the same diameter as TruPosition Probes.

Features:

  • A-2 Steel construction HT 58-62 R/C.
  • The shaft is precision ground to the same diameter as TruPosition Probes.

Instructions: Setting Probe Blocks to Position on Fixture

  1. Attach Probe Block to fixture with screws.
  2. Set the position of the block, with a CMM or other means, by using both ends of the Tooling Aid shaft to determine block alignment.
  3. Tighten screws.
  4. Remove tooling aid.
  5. Transfer drill and dowel (2 places)
  6. Install dowels.
  7. Recheck alignment (see #2).
Supplier's Site

Technical Specifications

  TruPosition
Product Category Dimensional Gages and Instruments
Product Number TA1.00-Tooling
Product Name TA1.00-Tooling Aids
Unlock Full Specs
to access all available technical data

Similar Products

Precision Slip Fit Inspection Balls - 29080 - Jergens, Inc.
Specs
Measurement Scale / Units English
View Details
Chromatic Confocal Sensor-Controller - HPS-CF2000 - Hypersen Technologies Co., Ltd.
Specs
Gage / Instrument Type Micrometer
Gaging Technology Optical
View Details
GapGun Sensor Heads - T15 - Accurex Measurement, Inc.
Accurex Measurement, Inc.
Specs
Mounting / Loading Options Handheld or Portable
Gage / Instrument Type Gage Head or Probe; Laser micrometer
Gaging Technology Optical; Non-contact
View Details
Flatness Measurement System -  - ABB Measurement & Analytics
ABB Measurement & Analytics
Specs
Mounting / Loading Options Machine Mounted
Measurement Scale / Units Metric
Gage / Instrument Type Gaging System or Station; Digital Transmission Unit
View Details