ASTM International Standard Practice for Job Productivity Measurement ASTM E2691-16

Description
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP. 1.2 JPM measures labor productivity of the installation processes on a construction job.2 1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering. 1.4 JPM takes into account the difficulty of installation at any given point on a job. 1.5 JPM evaluates relative productivity changes using trend monitoring.
Request a Quote
Description
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP. 1.2 JPM measures labor productivity of the installation processes on a construction job.2 1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering. 1.4 JPM takes into account the difficulty of installation at any given point on a job. 1.5 JPM evaluates relative productivity changes using trend monitoring.
Request a Quote

Suppliers

Company
Product
Description
Supplier Links
Standard Practice for Job Productivity Measurement - ASTM E2691-16 - ASTM International
West Conshohocken, PA, United States
Standard Practice for Job Productivity Measurement
ASTM E2691-16
Standard Practice for Job Productivity Measurement ASTM E2691-16
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP. 1.2 JPM measures labor productivity of the installation processes on a construction job.2 1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering. 1.4 JPM takes into account the difficulty of installation at any given point on a job. 1.5 JPM evaluates relative productivity changes using trend monitoring.

1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.


1.2 JPM measures labor productivity of the installation processes on a construction job.2


1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.


1.4 JPM takes into account the difficulty of installation at any given point on a job.


1.5 JPM evaluates relative productivity changes using trend monitoring.

Supplier's Site

Technical Specifications

  ASTM International
Product Category Standards and Technical Documents
Product Number ASTM E2691-16
Product Name Standard Practice for Job Productivity Measurement
Unlock Full Specs
to access all available technical data

Similar Products