1.1 This practice covers a procedure for defining and satisfying the functions of a project. 1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of project functions and then relates these functions to revenues and cost. 1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing/leasing, constructing/install ing, operating, maintaining, repairing, replacing and disposing of the particular building design or system (see Terminologies E631 and E833). While not the only criteria, cost is an important basis for comparison in a value analysis study of a project. Therefore, accurate and comprehensive cost data is an important element of the analysis. 1.4 is a procedure to develop alternatives that meet the project's functions. Estimate the costs for each alternative. Provide the owner/user/stakehold er with specific, technically accurate alternatives, appropriate to the stage of project development, which can be implemented. The owner/user/stakehold er selects the alternative(s) that best satisfies their constraints, needs and desires. 1.5 this practice to an entire project or to any subsystem. The user/owner/stakehold er can utilize the VA procedure to select the element or scope of the project to be studied.
Request a Quote
Description
1.1 This practice covers a procedure for defining and satisfying the functions of a project. 1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of project functions and then relates these functions to revenues and cost. 1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing/leasing, constructing/install ing, operating, maintaining, repairing, replacing and disposing of the particular building design or system (see Terminologies E631 and E833). While not the only criteria, cost is an important basis for comparison in a value analysis study of a project. Therefore, accurate and comprehensive cost data is an important element of the analysis. 1.4 is a procedure to develop alternatives that meet the project's functions. Estimate the costs for each alternative. Provide the owner/user/stakehold er with specific, technically accurate alternatives, appropriate to the stage of project development, which can be implemented. The owner/user/stakehold er selects the alternative(s) that best satisfies their constraints, needs and desires. 1.5 this practice to an entire project or to any subsystem. The user/owner/stakehold er can utilize the VA procedure to select the element or scope of the project to be studied.
Request a Quote

Suppliers

Company
Product
Description
Supplier Links
Standard Practice for Performing Value Analysis (VA) of Buildings and Building Systems and Other Constructed Projects - ASTM E1699-10 - ASTM International
West Conshohocken, PA, United States
Standard Practice for Performing Value Analysis (VA) of Buildings and Building Systems and Other Constructed Projects
ASTM E1699-10
Standard Practice for Performing Value Analysis (VA) of Buildings and Building Systems and Other Constructed Projects ASTM E1699-10
1.1 This practice covers a procedure for defining and satisfying the functions of a project. 1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of project functions and then relates these functions to revenues and cost. 1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing/leasing, constructing/install ing, operating, maintaining, repairing, replacing and disposing of the particular building design or system (see Terminologies E631 and E833). While not the only criteria, cost is an important basis for comparison in a value analysis study of a project. Therefore, accurate and comprehensive cost data is an important element of the analysis. 1.4 is a procedure to develop alternatives that meet the project's functions. Estimate the costs for each alternative. Provide the owner/user/stakehold er with specific, technically accurate alternatives, appropriate to the stage of project development, which can be implemented. The owner/user/stakehold er selects the alternative(s) that best satisfies their constraints, needs and desires. 1.5 this practice to an entire project or to any subsystem. The user/owner/stakehold er can utilize the VA procedure to select the element or scope of the project to be studied.

1.1 This practice covers a procedure for defining and satisfying the functions of a project.

1.2 A multidisciplinary team uses the procedure to convert stakeholder constraints, needs, and desires into descriptions of project functions and then relates these functions to revenues and cost.

1.3 Examples of costs are all relevant costs over a designated study period, including the costs of obtaining funds, designing, purchasing/leasing, constructing/installing, operating, maintaining, repairing, replacing and disposing of the particular building design or system (see Terminologies E631 and E833). While not the only criteria, cost is an important basis for comparison in a value analysis study of a project. Therefore, accurate and comprehensive cost data is an important element of the analysis.

1.4 is a procedure to develop alternatives that meet the project's functions. Estimate the costs for each alternative. Provide the owner/user/stakeholder with specific, technically accurate alternatives, appropriate to the stage of project development, which can be implemented. The owner/user/stakeholder selects the alternative(s) that best satisfies their constraints, needs and desires.

1.5 this practice to an entire project or to any subsystem. The user/owner/stakeholder can utilize the VA procedure to select the element or scope of the project to be studied.

Supplier's Site

Technical Specifications

  ASTM International
Product Category Standards and Technical Documents
Product Number ASTM E1699-10
Product Name Standard Practice for Performing Value Analysis (VA) of Buildings and Building Systems and Other Constructed Projects
Unlock Full Specs
to access all available technical data

Similar Products